Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 92 11 O St Nw, Washington, Dc 20005 An existing substation - pepco with landscape a 1 ft x 2 ft and a 58 ft x ft area using new shrubs, trees, tree boxes, and a new 7ft oramental fence around landscaped area. Date: September 12, 2013 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1309689 | |||||
SCORE 92 225 E St Sw, Washington, Dc 20024 Partial demolition of non-load bearing transformer bay wall for one bay. Remove and replace knock out panel and cover with plywood while transformer are being switched out. Retrofit the existing transformer concrete foundation. Date: July 31, 2013 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1309438 | |||||
SCORE 92 1125 G St Se, Washington, Dc 20003 Remove and replace in-kind two 15 ft - 9. 5 in. X 16. 5 ft high knockout panels on the exterior of the building to accommodate the replacement of two transformers within the substation building. Date: July 12, 2013 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1308754 | |||||
SCORE 92 3317 13th St Se, Washington, Dc 20032 Installation of a 58 ft long by 24 ft wide driveway with a double swing gate Date: August 7, 2013 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1309701 | |||||
SCORE 92 1001 Harvard St Nw, Washington, Dc 20001 Demolish existing concrete foundations within 2,5 square feet outdoor yard to construct condrete encased ducts leading into the substation building, two 805 sq. Ft. Concrete mat foundations and a 1,8 sq. Ft. Concrete yard pad. Date: August 23, 2013 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Addition | Permit status: Permit issued | Permit id: B1309437 | |||||
SCORE 92 5715 Belt Rd Nw, Washington, Dc 20015 Remove and replace in a 16 ft x 1ft x 16. 5 ft high knock out panel with four windows and their lintel for the installation of new transformer within the substation building. Date: February 12, 2014 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1404283 | |||||
SCORE 92 2128 F St Nw, Washington, Dc 20037 To remove and replace in kind a 8 ft-4 in x 16. 5 ft high knock out panel in transformer bay no. 1 ? 2 and 10. 5 ft x 1 ft x 12 ft section bounded by columns and a grade geam in the west wall of transformer bay no. 3. A structural channel c15 x shall be installed to temporarily support the opening in transformer bays 1 and 2. Date: March 25, 2014 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1405532 | |||||
SCORE 92 Date: October 31, 2011 Contractor: Adrienne Sheffield Permit status: Expired | Expiration date: November 5, 2011 | Permit id: Pa10042618 | |||||
SCORE 92 3302 15th St Se, Washington, Dc 20032 This project involves the construction of a new equipment enclosure located in the front yard of the current alabama avenue substation no. 136, located at 3302 15th street se, washington, dc 20032. The new structure will consist of three electrical equipment bays with mat foundations enclosed by 1 thick reinforced concrete walls with a 4 masonry faade to match the existing building and health and safety screen roofing. Each foundation will include oil containment which drains to a common oil reclaiming pit. In addition, this project will require an 225 extension of the existing driveway, the installation of a retaining wall and a new landscaping plan to provide cover of the new enclosure. The total disturbed area will be approximately 25,3 sq. Ft. Date: September 30, 2015 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Addition | Permit status: Permit issued | Permit id: B1505626 | |||||
SCORE 92 19 1st St Sw, Washington, Dc 20024 Installation of a new sump pump and connecting a four inch cast iron pipe from the transformer bay no. 13 sump pit to oil reclaiming pit no. 3. Length of piping is 16 feet. Date: October 16, 2015 Contractor: Adrienne Sheffield Client: Phi Holdings, Inc. Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1600674 | |||||
SCORE 92 2128 F St Nw, Washington, Dc 20037 To remove and replace a 22 feet x 18. 1 high knock out panel in the transformer bay area. A temporary plywood facade will be placed over the opening for safety and security. Date: December 1, 2015 Contractor: Adrienne Sheffield Client: Potomac Electric Power Co. Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601541 | |||||
SCORE 92 59 North Dakota Ave Nw, Washington, Dc 20011 Restoration work of the masonry walls on all four sides of the existing substation building. Date: November 20, 2015 Contractor: Adrienne Sheffield Client: Pepco Phi Holdings, Inc. | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602084 | |||||
SCORE 92 52 Little Falls Rd Nw, Washington, Dc 20016 Install a new sump pump wuth 2 diameter red brass piping for a length of 98 ft. Date: June 19, 2015 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Addition alteration repair | Permit status: Permit issued | Permit id: B1509131 | |||||
SCORE 92 3302 15th St Se, Washington, Dc 20032 Remove existing wall for 2 locations in the 13. 8 kv substation building west wall to remove equipment size: 10. 5 ft x 12. 33 ft. Then replace the wall with two smaller permanent openings for each location which will provide for cable tray and piping penetration. Date: August 20, 2015 Contractor: Adrienne Sheffield Client: Pepco Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1511706 | |||||
SCORE 92 1032 Irving St Ne, Washington, Dc 20017 Install a greenwall with five planter boxes and native evergreen vines along one wall of the existing substation building. The planter boxes will use ddot specified ornamental tree fences. Date: July 2, 2015 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1509712 | |||||
SCORE 92 19 1st St Sw, Washington, Dc 20024 Installation oil containment system liners around four existing concrete foundation pads which will be used as storage for spare electrical equipment. Date: January 8, 2016 Contractor: Adrienne Sheffield Client: Phi Holdings, Inc. Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1602726 | |||||
SCORE 92 19 1st St Sw, Washington, Dc 20024 Installation of the following new concrete foundations - two 6ft x 7ft x 3ft deep mat foundations, sixteen 2. 5ft x 6ft deep pier foundations and steel support structures within the existing 138 kv switchyard. Construct approximately 145ft of 1. 5ft wide x 11. 25ft deep cable trench and approximately 26ft x 1. 5ft deep direct burial trench. Date: January 8, 2016 Contractor: Adrienne Sheffield Client: Phi Holdings, Inc. Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1601540 | |||||
SCORE 92 52 Wisconsin Ave Nw, Washington, Dc 20015 A temporary power sub-station on lots 810, 811 & 812 in square 1657 to be removed in 3 years on 3-1-18 . Pepco is installing harrison temporary station no. 38 as a new distribution substation located at the corner of harrison st nw and wisconsin avenue nw in washington dc. Pepco is soliciting bids from qualified contractors to construct the new substation. The 34/13. 8kv substation will have three incoming 34kv lines which will be feeding three 22. 4 mva 34/13. 8 kv transformers. The substation will have three transformer bays and all three bays will be energized at the end of this project. The substation will also consist of three mobile switchgears with 9 cubicles, two 9mvar cap bank units and additional related substation equipment. The relay panels, station service and battery will be located within the mobile switchgear units Date: December 3, 2015 Contractor: Adrienne Sheffield Client: Chaitali Pepco Holdings Inc. | Permit type: New building | Permit status: Permit issued | Permit id: B1511707 | |||||
SCORE 92 Date: May 11, 2016 Contractor: Adrienne Sheffield Permit status: Permit expired | Expiration date: June 3, 2016 | Permit id: Pa10236373 | |||||
SCORE 92 Date: March 21, 2016 Contractor: Adrienne Sheffield Permit status: Permit expired | Expiration date: March 24, 2016 | Permit id: Pa10235711 |