Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolish existing concrete foundations within 2,5 square feet outdoor yard to construct condrete encased ducts leading into the substation building, two 805 sq. Ft. Concrete mat foundations and a 1,8 sq. Ft. Concrete yard pad. Date: August 23, 2013 Client: Pepco | Applicant: Adrienne Sheffield | Permit type: Addition | Permit status: Permit issued | Permit id: B1309437 | |||||
SCORE 92 Demolish existing concrete foundations within 2,5 square feet outdoor yard to construct condrete encased ducts leading into the substation building, two 805 sq. Ft. Concrete mat foundations and a 1,8 sq. Ft. Concrete yard pad. Date: August 23, 2013 Contractor: Adrienne Sheffield Client: Pepco | Permit type: Addition | Permit status: Permit issued | Permit id: B1309437 | |||||
SCORE 59 Drill 9 standard penetration testing borings to 25 feet for a utility substation using dual tube geoprobe. Date: July 14, 2017 Contractor: John D Hynes Client: Potomac Electric Power Company | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700389 |