Building Permits at 225 E St Sw, Washington, DC 20024


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 225 E St Sw, Washington, DC 20024 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Partial demolition of non-load bearing transformer bay wall for one bay. Remove and replace knock out panel and cover with plywood while transformer are being switched out. Retrofit the existing transformer concrete foundation.
Date:  July 31, 2013

Client: Pepco | Applicant: Adrienne Sheffield | Permit type: Alteration and repai | Permit status: Permit issued | Permit id: B1309438
2013/07/31095225 E St Sw Washington Dc 20024
Replace the exiting controller, hoist machine, hoist motor, governor, tension sheave, hoist and governor cables, travel cable, ada signalling and push buttons, freight doors and associated motors and controls, car gates and associated motors and controls. Retain existing speed and capacity est. Cost of work : 345,230. 00
Date:  June 16, 2014

Client: Potomac Electric Power Company | Applicant: Elcon Enterprises Inc | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1402104
2014/06/16095225 E St Sw Washington Dc 20024
SCORE
92
Partial demolition of non-load bearing transformer bay wall for one bay. Remove and replace knock out panel and cover with plywood while transformer are being switched out. Retrofit the existing transformer concrete foundation.
Date:  July 31, 2013
Contractor: Adrienne Sheffield

Client: Pepco | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1309438
2013/07/31092225 E St Sw, Washington, Dc 20024Adrienne Sheffield
SCORE
93
Replace the exiting controller, hoist machine, hoist motor, governor, tension sheave, hoist and governor cables, travel cable, ada signalling and push buttons, freight doors and associated motors and controls, car gates and associated motors and controls. Retain existing speed and capacity est. Cost of work : 345,230. 00
Date:  June 16, 2014

Client: Potomac Electric Power Company | Permit type: Elevator - repair | Permit status: Permit issued | Permit id: Er1402104
2014/06/16093225 E St Sw, Washington, Dc 20024Elcon Enterprises Inc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.