SCORE 100 Date: December 6, 2006 Contractor: Lighthouse Solar Client: William Wise | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: April 10, 2007 | Current use: Office - techni | |||||
SCORE 100 Date: December 14, 2006 Contractor: Lighthouse Solar Client: Kevin Morningstar | Applicant: Lighthouse Solar | Permit type: Building, electrical | Permit status: Cmp | Completion date: February 1, 2007 | Current use: Single family d | |||||
SCORE 100 15 Redwood St Boulder Co Installation of rooftop solar system with flushmount panels for photovoltaic and solar hot water heat. Date: January 19, 2007 Contractor: Lighthouse Solar Client: Jeffrey Truesdall | Applicant: Lighthouse Solar | Permit type: Mechanical, photovol | Permit status: Cmp | Completion date: April 19, 2010 | Current use: Single family d | |||||
SCORE 100 7 31st St Boulder Co Solar pv system mounted on roof top. Tilt-up panels and structural modifications. Client: Thomas Kehoe | Applicant: Lighthouse Solar | Permit type: Building, photovolta | Permit status: Cmp | Completion date: February 26, 2007 | Current use: Single family d | |||||
SCORE 100 2045 Balsam Dr Boulder Co Installation of 7. 488 kw photovoltaic system on sfd, flush mounted per engineers report, on a unistrut system. Date: March 21, 2007 Contractor: Lighthouse Solar Client: Jill Mcintyre,Mark Mcintyre | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 11, 2007 | Current use: Single family d | |||||
SCORE 100 Date: April 3, 2007 Contractor: Lighthouse Solar Client: Allon Cohne, Cohne | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: October 5, 2007 | Current use: Single family d | |||||
SCORE 100 Date: April 17, 2007 Contractor: Lighthouse Solar Client: Celia Sinoway,Kevin Orin | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family d | |||||
SCORE 100 Date: April 27, 2007 Contractor: Lighthouse Solar Client: Kenneth Harris,Rebecca Harris | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 11, 2007 | Current use: Single family d | |||||
SCORE 100 Date: June 20, 2007 Contractor: Lighthouse Solar Client: Peter Oatman,Dorothy Oatman | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 12, 2007 | Current use: Single family d | |||||
SCORE 100 Date: July 6, 2007 Contractor: Lighthouse Solar Client: Neher 2070.0 | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family d | |||||
SCORE 100 335 Lee Hill Dr Boulder Co Installation of 8 kw, flush-mounted photovoltaic system on single-family residence. Date: July 12, 2007 Contractor: Lighthouse Solar Client: David Jacobs | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family d | |||||
SCORE 100 Date: August 7, 2007 Contractor: Lighthouse Solar Client: Christophe Burghart,Heidi Burghart | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 24, 2007 | Current use: Single family d | |||||
SCORE 100 3665 Longwood Av Boulder Co Installation of a tilt-up photovoltaic solar system, 7. 2 kw on a flat roof. See adr2007-00085 for administrative solar exception. System to be installed to conform to provisions of adr2007-00085. Date: August 27, 2007 Contractor: Lighthouse Solar Client: Jon Kogut | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 17, 2007 | Current use: Single family d | |||||
SCORE 100 Date: September 12, 2007 Contractor: Lighthouse Solar Client: John Kelly,Jan Kelly | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Single family d | |||||
SCORE 100 Date: October 16, 2007 Contractor: Lighthouse Solar Client: Wolfgang Reitz,Elvera Sciarra | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: November 19, 2007 | Current use: Single family d | |||||
SCORE 100 Date: October 18, 2007 Contractor: Lighthouse Solar Client: Neil Korte,Deborah Korte | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 21, 2007 | Current use: Single family d | |||||
SCORE 100 Client: Wolfgang Reitz,Elvera Sciarra | Applicant: Lighthouse Solar | Permit type: Building, photovolta | Permit status: Cmp | Completion date: November 21, 2007 | Current use: Single family d | |||||
SCORE 100 29 17th St Boulder Co Installation of flushmounted, rooftop solar system, 4 kw photovoltaic grid-tied system and 60,0 btu solar domestic hot water system. Date: November 9, 2007 Contractor: Lighthouse Solar Client: Llc Seventeenth | Applicant: Lighthouse Solar | Permit type: Mechanical, photovol | Permit status: Cmp | Completion date: September 28, 2009 | Current use: Single family d | |||||
SCORE 100 Date: December 21, 2007 Contractor: Lighthouse Solar Client: Marlene Zaleznick,Brian Zaleznick | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 2, 2008 | Current use: Single family d | |||||
SCORE 100 Date: January 16, 2008 Contractor: Lighthouse Solar Client: Louise Leach | Applicant: Lighthouse Solar | Permit type: Electrical, photovol | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 Date: January 16, 2008 Contractor: Lighthouse Solar Client: Louise Leach | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: April 25, 2008 | Current use: Single family d | |||||
SCORE 100 852 11th St Boulder Co Installation of rooftop, flush-mount, closed loop collector, tube solar domestic hot water system. Date: February 22, 2008 Contractor: Lighthouse Solar Client: Herbert Fenster,Jane Fenster | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: January 8, 2009 | Current use: Single family d | |||||
SCORE 100 Date: March 27, 2008 Contractor: Lighthouse Solar Client: Thomas Lorden,Mary Lorden | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2008 | Current use: Single family d | |||||
SCORE 100 Date: February 27, 2008 Contractor: Lighthouse Solar Client: Brian Spielmann | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2008 | Current use: Single family d | |||||
SCORE 100 Date: February 29, 2008 Contractor: Lighthouse Solar Client: Michael Weissberg,Susan Weissberg | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: July 21, 2008 | Current use: Single family d | |||||
SCORE 100 Date: March 18, 2008 Contractor: Lighthouse Solar Client: Waylon Lewis | Applicant: Lighthouse Solar | Permit type: Flood nonsubstantial | Permit status: Cmp | Completion date: March 26, 2008 | Current use: Single family d | |||||
SCORE 100 Date: March 20, 2008 Contractor: Lighthouse Solar Client: David 2004.0 | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2008 | Current use: Single family d | |||||
SCORE 100 Date: April 4, 2008 Contractor: Lighthouse Solar Client: Kreith Frank, Frank | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family d | |||||
SCORE 100 Date: April 30, 2008 Contractor: Lighthouse Solar Client: Audrey Sheridan | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 12, 2008 | Current use: Single family d | |||||
SCORE 100 Date: May 8, 2008 Contractor: Lighthouse Solar Client: Janice Michon | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family d | |||||
SCORE 100 Date: June 3, 2008 Contractor: Lighthouse Solar Client: Jeannette Shorter | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Multifamily dwe | |||||
SCORE 100 Date: June 3, 2008 Contractor: Lighthouse Solar Client: Louise Shorter | Applicant: Lighthouse Solar | Permit type: Electrical, photovol | Permit status: Cmp | Completion date: May 7, 2009 | Current use: Single family d | |||||
SCORE 100 Date: June 12, 2008 Contractor: Lighthouse Solar Client: Emma Espino | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 3, 2008 | Current use: Single family d | |||||
SCORE 100 Date: June 12, 2008 Contractor: Lighthouse Solar Client: Goodman E | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Single family d | |||||
SCORE 100 Date: June 12, 2008 Contractor: Lighthouse Solar Client: Michael Kracauer,Ila Kracauer | Applicant: Lighthouse Solar | Permit type: Mechanical, photovol | Permit status: N&v | Current use: Single family d | |||||
SCORE 100 3945 17th St Boulder Co Installation of a flush-mount 3. 2 kw grid-tie photovoltaic system. No battery tie-in. Date: June 26, 2008 Contractor: Lighthouse Solar Client: Janice Speas | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 18, 2008 | Current use: Single family d | |||||
SCORE 100 Date: July 11, 2008 Contractor: Lighthouse Solar Client: Paul Hogan,Tracie Bascom | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 4, 2008 | Current use: Single family d | |||||
SCORE 100 Date: July 11, 2008 Contractor: Lighthouse Solar Client: Dominic Zichi | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family d | |||||
SCORE 100 Date: July 11, 2008 Contractor: Lighthouse Solar Client: Margaret Alfonso | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family d | |||||
SCORE 100 Date: August 20, 2008 Contractor: Lighthouse Solar Client: Of City | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Government uses | |||||
SCORE 100 Date: August 27, 2008 Contractor: Lighthouse Solar Client: Abby Jacobs,Christophe Jacobs | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Single family d | |||||
SCORE 100 Date: September 4, 2008 Contractor: Lighthouse Solar Client: Jeanne Connaghan | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 19, 2008 | Current use: Single family d | |||||
SCORE 100 Date: September 16, 2008 Contractor: Lighthouse Solar Client: Eric Keighin,Jennifer Schwarz | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 10, 2008 | Current use: Single family d | |||||
SCORE 100 1665 Orchard Av Boulder Co Installation of three panels to an existing ground mounted solar array. 585 watts. Date: October 15, 2008 Contractor: Lighthouse Solar Client: Wolfgang Reitz,Elvera Sciarra | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 22, 2008 | Current use: Single family d | |||||
SCORE 100 37 23rd St Boulder Co Installation of a solar -thermal evacuated tube collector, solar holding tanks and associated plumbing. Date: October 15, 2008 Contractor: Lighthouse Solar Client: Russ Hullet,Diane Dow | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: September 15, 2009 | Current use: Single family d | |||||
SCORE 100 39 17th Boulder Co Installation of 7. 56 kw flush-mounted, grid-tied, rooftop photovoltaic solar system. Date: October 17, 2008 Contractor: Lighthouse Solar Client: James Baer,Andrea Baer | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 29, 2008 | Current use: Single family d | |||||
SCORE 100 Date: October 29, 2008 Contractor: Lighthouse Solar Client: Stephen Kelly | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 26, 2009 | Current use: Single family d | |||||
SCORE 100 Date: October 29, 2008 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 17, 2008 | Current use: Commercial/reta | |||||
SCORE 100 Date: October 30, 2008 Contractor: Lighthouse Solar Client: Andreas Lee, Lee | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Single family d | |||||
SCORE 100 1275 Wildwood Rd Boulder Co Installation of flushmounted, rooftop solar hot water system in single-family residence. Date: November 6, 2008 Contractor: Lighthouse Solar Client: Sarah Lee | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: December 17, 2008 | Current use: Single family d | |||||
SCORE 100 Date: November 14, 2008 Contractor: Lighthouse Solar Client: Arrelaine Dameron,Stephen Kraemer | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 24, 2008 | Current use: Single family d | |||||
SCORE 100 Date: November 24, 2008 Contractor: Lighthouse Solar Client: Joe Mcdonald,Pamela Mcdonald | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 14, 2009 | Current use: Single family d | |||||
SCORE 100 Date: December 1, 2008 Contractor: Lighthouse Solar Client: Homes Markel | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 19, 2008 | Current use: Single family d | |||||
SCORE 100 608 Spruce St Boulder Co Installation of new solar domestic hot water. Flush mounted system. See his2008-00242 for landmark approval. Date: December 1, 2008 Contractor: Lighthouse Solar Client: Property Acorn | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: December 17, 2008 | Current use: Single family d | |||||
SCORE 100 Date: January 9, 2009 Contractor: Lighthouse Solar Client: John Hall | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 14, 2009 | Current use: Single family d | |||||
SCORE 100 Date: January 20, 2009 Contractor: Lighthouse Solar Client: Nicholas Forster,Helen Forster | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: March 1, 2012 | Current use: Single family d | |||||
SCORE 100 Date: February 25, 2009 Contractor: Lighthouse Solar Client: Todd Reed | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 9, 2012 | Current use: Single family d | |||||
SCORE 100 772 Circle Dr Boulder Co Pv installation on sfd. Awning style on side of home, grid-tied, 3. 8 kw. Also rough-run to be installed for future system 6. 12 kw. Date: March 27, 2009 Contractor: Lighthouse Solar Client: Hill Logan | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 4, 2009 | Current use: Single family d | |||||
SCORE 100 Date: March 27, 2009 Contractor: Lighthouse Solar Client: Douglas Raymond, Raymond | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: June 25, 2009 | Current use: Single family d | |||||
SCORE 100 Date: May 4, 2009 Contractor: Lighthouse Solar Client: Valmont 2845.0 | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Amusement/recre | |||||
SCORE 100 3135 5th St Boulder Co Installation of a 4. 3 kw pv system. Flush mounted and grid-tied. For installation on a new home under construction. Date: April 16, 2009 Contractor: Lighthouse Solar Client: Timothy Meyers | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 9, 2009 | Current use: Single family d | |||||
SCORE 100 Date: April 22, 2009 Contractor: Lighthouse Solar Client: Xin Ying,Jing Ying | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 5, 2009 | Current use: Single family d | |||||
SCORE 100 Date: May 5, 2009 Contractor: Lighthouse Solar Client: Mark Johnson,Jill Lester | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family d | |||||
SCORE 100 505 Aurora Av Boulder Co Pv installation on sfd. Roof is flat with deg - 15 deg tilt to panels, grid-tied, 5. 2 kw. Date: June 5, 2009 Contractor: Lighthouse Solar Client: Douglas Raymond, Raymond | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2009 | Current use: Single family d | |||||
SCORE 100 Date: June 5, 2009 Contractor: Lighthouse Solar Client: Simon Lipstein | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 26, 2012 | Current use: Single family d | |||||
SCORE 100 Date: June 5, 2009 Contractor: Lighthouse Solar Client: William Briggs,Julie Briggs | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family d | |||||
SCORE 100 Date: June 23, 2009 Contractor: Lighthouse Solar Client: S Hoover | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 31, 2009 | Current use: Single family d | |||||
SCORE 100 Date: June 29, 2009 Contractor: Lighthouse Solar Client: Carmen Vigil,Velvet Vigil | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Single family d | |||||
SCORE 100 Date: July 1, 2009 Contractor: Lighthouse Solar Client: Michael Moore | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 1, 2009 Contractor: Lighthouse Solar Client: Michael Moore | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 2, 2009 Contractor: Lighthouse Solar Client: Erin Leckey,Christian Leckey | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 10, 2009 Contractor: Lighthouse Solar Client: Christophe Lee | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family d | |||||
SCORE 100 2845 Valmont Rd Boulder Co Mechanical permit - for solar thermal system on climbing gym building. 3 collectors ( tube), 3 tanks ( gallons each). Date: July 10, 2009 Contractor: Lighthouse Solar Client: Valmont 2845.0 | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: September 18, 2009 | Current use: Amusement/recre | |||||
SCORE 100 Date: July 10, 2009 Contractor: Lighthouse Solar Client: Shawn Otteman | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family a | |||||
SCORE 100 Date: July 10, 2009 Contractor: Lighthouse Solar Client: Erin Leckey,Christian Leckey | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 10, 2009 Contractor: Lighthouse Solar Client: David Powell, Powell | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 15, 2009 Contractor: Lighthouse Solar Client: Kevin Cooney,Ann Cooney | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family d | |||||
SCORE 100 Date: July 15, 2009 Contractor: Lighthouse Solar Client: Amelia Greacen | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family d | |||||
SCORE 100 1 S 35th St Boulder Co Installation of an on-demand water heater -- 199,0 btu. Gas schematic required to be provided to inspector at rough inspection. Date: July 23, 2009 Contractor: Lighthouse Solar Client: Rachel Odell | Applicant: Lighthouse Solar | Permit type: Mechanical | Permit status: Cmp | Completion date: February 3, 2012 | Current use: Single family d | |||||
SCORE 100 Date: July 23, 2009 Contractor: Lighthouse Solar Client: Seth Portner, Portner | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family d | |||||
SCORE 100 2905 5th St Boulder Co Installation of a flush-mount grid-tie 2. 45 kw photovoltaic system on the garage. Array not to extend above ridge or beyond rake edges of existing roof of garage. Date: October 29, 2009 Contractor: Lighthouse Solar Client: Daniel Drury | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 2, 2012 | Current use: Single family d | |||||
SCORE 100 Date: November 5, 2009 Contractor: Lighthouse Solar Client: Ski Milburn,Catherine Milburn | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 20, 2010 | Current use: Single family d | |||||
SCORE 100 Date: November 5, 2009 Contractor: Lighthouse Solar Client: Charles,Carol Living Trust | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 16, 2009 | Current use: Single family d | |||||
SCORE 100 Date: November 5, 2009 Contractor: Lighthouse Solar Client: James Schwarz,Nancy Schwarz | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 16, 2009 | Current use: Single family d | |||||
SCORE 100 Date: December 1, 2009 Contractor: Lighthouse Solar Client: Anne Giesen,Macandrew Jack | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 23, 2009 | Current use: Single family d | |||||
SCORE 100 Date: February 18, 2010 Contractor: Lighthouse Solar Client: Jonathan Anderson | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: February 24, 2010 | Current use: Single family d | |||||
SCORE 100 Date: February 24, 2010 Contractor: Lighthouse Solar Client: Michael Banks,Andrea Banks | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 11, 2010 | Current use: Single family d | |||||
SCORE 100 7 Aurora Av Boulder Co Installation of 4. 44 kw, flushmounted, rooftop photovoltaic solar energy system. Date: March 4, 2010 Contractor: Lighthouse Solar Client: Virginia Gurley | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 12, 2010 | Current use: Single family d | |||||
SCORE 100 Date: March 18, 2010 Contractor: Lighthouse Solar Client: Walnut 2044.0 | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 26, 2010 | Current use: Single family d | |||||
SCORE 100 5137 Gallatin Pl Boulder Co Installation of a2. 75 kw flush-mount grid-tie photovoltaic system -- panels to remain below ridge elevation and inside the rake edges of the roof. Date: April 28, 2010 Contractor: Lighthouse Solar Client: Joann Maneri | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2012 | Current use: Single family d | |||||
SCORE 100 1145 Drexel St Boulder Co Installation of a flush-mount grid-tie photovoltaic system, 3. 3 kw on the detached garage. Date: May 20, 2010 Contractor: Lighthouse Solar Client: Gregory Keeley,Paulette Keeley | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 23, 2010 | Current use: Single family d | |||||
SCORE 100 46 Mac Arthur Ln Boulder Co Installation of a 2. 775 kw photovoltaic system on a grid racking system -- maximum degreee tilt up. See adr2010-00061 for additional inforamtion. Date: May 20, 2010 Contractor: Lighthouse Solar Client: Zachary Castleman, Castleman | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 23, 2010 | Current use: Multifamily dwe | |||||
SCORE 100 Date: June 14, 2010 Contractor: Lighthouse Solar Client: Daniel Heiges,Francine Heiges | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 2, 2010 | Current use: Single family d | |||||
SCORE 100 2912 4th St Boulder Co Installation of 3. 7 kw solar array on accessory structure. Tilted system, overall height not to exceed twelve feet. Date: June 14, 2010 Contractor: Lighthouse Solar Client: Dante Medri,Cristina Medri | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 21, 2011 | Current use: Single family d | |||||
SCORE 100 35 Frontier Av Boulder Co Installation of a ground mounted kw photovoltaic array in an area southwest of the building. Date: June 29, 2010 Contractor: Lighthouse Solar Client: Frontier New | Applicant: Lighthouse Solar | Permit type: Flood not required, | Permit status: Cmp | Completion date: November 16, 2010 | Current use: Warehousing, ex | |||||
SCORE 100 Date: August 16, 2010 Contractor: Lighthouse Solar Client: Andrew Gettelman, Gettelman | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 16, 2010 | Current use: Single family d | |||||
SCORE 100 Date: July 22, 2010 Contractor: Lighthouse Solar Client: Transit Special | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Government uses | |||||
SCORE 100 3855 Orange Ct Boulder Co Installation of a flush mount photovoltaic array in a tilted roof & degree tilt-up photovoltaic array on a flat roof -- 8. 9 kw. Date: September 22, 2010 Contractor: Lighthouse Solar Client: Vidan Gonthier | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 28, 2010 | Current use: Single family d | |||||
SCORE 100 3047 Arnett St Boulder Co Installation of 4. 5 kw, rooftop, flush-mounted photovoltaic solar energy system on single-family residence. Date: September 24, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family d | |||||
SCORE 100 3053 Arnett St Boulder Co Installation of 4. 5 kw, rooftop, flush-mounted photovoltaic solar energy system on single-family residence. Date: September 24, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family d | |||||
SCORE 100 3041 Arnett St Boulder Co Installation of 2. 28 kw, rooftop, flush-mounted photovoltaic solar energy system on single-family residence. Date: September 24, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family d | |||||
SCORE 100 504 Geneva Av Boulder Co Installation of kw, rooftop, flush-mounted, photovoltaic solar energy system. Date: September 24, 2010 Contractor: Lighthouse Solar Client: Daniel Harvey,Pamela Harvey | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family d | |||||
SCORE 100 2857 18th St Boulder Co Pv installation on sfd. Tilt-up ( degrees) on pitched roof, grid-tied, and 4 kw. Date: October 1, 2010 Contractor: Lighthouse Solar Client: Corey Nielsen | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 26, 2010 | Current use: Single family d | |||||
SCORE 100 Date: October 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family d | |||||
SCORE 100 Date: October 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family d | |||||
SCORE 100 Date: October 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 13, 2011 | Current use: Single family d | |||||
SCORE 100 3083 Arnett St Boulder Co Installation of a flush mount, grid-tied 2. 28 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Date: October 12, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 14, 2011 | Current use: Single family d | |||||
SCORE 100 3077 Arnett St Boulder Co Installation of a flush mount, grid-tied 4. 5 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Date: October 12, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 13, 2011 | Current use: Single family d | |||||
SCORE 100 3095 Arnett St Boulder Co Installation of a flush mount, grid-tied 4. 5 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Date: October 12, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 28, 2013 | Current use: Single family d | |||||
SCORE 100 3089 Arnett St Boulder Co Installation of a flush mount, grid-tied 4. 5 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Date: October 12, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family d | |||||
SCORE 100 3052 Arnett St Boulder Co Installation of 1. 14 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Date: October 29, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2011 | Current use: Single family d | |||||
SCORE 100 3056 Arnett St Boulder Co Installation of 1. 14 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Date: October 29, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 8, 2011 | Current use: Single family d | |||||
SCORE 100 3048 Arnett St Boulder Co Installation of 3. 42 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Date: October 29, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 29, 2011 | Current use: Single family d | |||||
SCORE 100 30 Arnett St Boulder Co Installation of 4. 5 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Date: October 29, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2011 | Current use: Single family d | |||||
SCORE 100 26 Raintree Pl Boulder Co Installation of a flush-mounted, grid-tied 2. 75 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Date: November 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 28, 2013 | Current use: Single family a | |||||
SCORE 100 3068 Arnett St Boulder Co Nstallation of a flush-mounted, grid-tied 1. 14 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Date: November 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family a | |||||
SCORE 100 3072 Arnett St Boulder Co Nstallation of a flush-mounted, grid-tied 1. 14 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Date: November 5, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family a | |||||
SCORE 100 3064 Arnett St Boulder Co Installation of a flush-mounted, grid-tied 4. 5 kw photovoltaic array on a sfd, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Date: November 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family d | |||||
SCORE 100 26 Raintree Pl Boulder Co Installation of a flush-mount, grid tie 2. 75 kw photovoltaic system. System to remain below ridge, inside of rakes and above eaves. Date: December 3, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 17, 2011 | Current use: Single family a | |||||
SCORE 100 3045 Littleleaf Ln Boulder Co Installation of a flush-mount grid tie 2. 5 kw photovoltaic system to remain below ridge, inside of rakes and above eave. Date: December 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 25, 2011 | Current use: Single family d | |||||
SCORE 100 3063 Littleleaf Ln Boulder Co Installation of a flush-mount grid-tie 4. 5 kw photovoltaic system on a sfd. Panels to remain below ridge, inside of rakes and above eave. Date: December 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family d | |||||
SCORE 100 3069 Littleleaf Ln Boulder Co Installation of a flush-mount grid-tie 4. 5 kw photovoltaic system on a sfd. Panels to remain below ridge, inside of rakes and above eave. Date: December 5, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family d | |||||
SCORE 100 3051 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Date: December 5, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 25, 2011 | Current use: Single family a | |||||
SCORE 100 3057 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Date: December 5, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family a | |||||
SCORE 100 3075 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Date: December 5, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family a | |||||
SCORE 100 3081 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Date: December 5, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 13, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 13, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 13, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 13, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 14, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 14, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family a | |||||
SCORE 100 2665 Raintree Pl Boulder Co Installation of 2. 28 kw, rooftop, flush-mounted photovoltaic solar energy system. Date: December 17, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family d | |||||
SCORE 100 2675 Raintree Pl Boulder Co Installation of 2. 28 kw, rooftop, flush-mounted photovoltaic solar energy system. Date: December 17, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family d | |||||
SCORE 100 Date: December 27, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family d | |||||
SCORE 100 Date: December 27, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family d | |||||
SCORE 100 Date: December 27, 2010 Contractor: Lighthouse Solar Client: Barbara Johnson,Lloyd Johnson | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 10, 2011 | Current use: Single family d | |||||
SCORE 100 3086 Littleleaf Ln Boulder Co Pv installation on one unit of tri-plex. Flush mounted, grid-tied, and 0. 76 kw. Date: December 27, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family a | |||||
SCORE 100 30 Littleleaf Ln Boulder Co Pv installation on one unit of tri-plex. Flush mounted, grid-tied, and 0. 76 kw. Date: December 27, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family a | |||||
SCORE 100 3094 Littleleaf Ln Boulder Co Pv installation on one unit of tri-plex. Flush mounted, grid-tied, and 0. 76 kw. Date: December 27, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family a | |||||
SCORE 100 Date: December 28, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: N&v | Current use: Single family a | |||||
SCORE 100 3078 Littleleaf Ln Boulder Co Installation of a flush-mount photovoltaic array -- 0. 76 kw. This array is 1 3 of a triplex array. Permits for 3074 littleleaf and 3082 littleleaf by separate permit. Date: December 28, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: N&v | Current use: Single family a | |||||
SCORE 100 Date: December 28, 2010 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: N&v | Current use: Single family a | |||||
SCORE 100 3803 N 26th St Boulder Co Installation of rooftop, tilt-mounted photovoltaic solar energy system. Total system size to be kw (7. 5 kw on garage array and 2. 5 kw on house array). Date: January 10, 2011 Contractor: Lighthouse Solar Client: Revocable Fsm2 | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 13, 2011 | Current use: Single family d | |||||
SCORE 100 Date: January 26, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family d | |||||
SCORE 100 Date: January 26, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family d | |||||
SCORE 100 Date: January 26, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family d | |||||
SCORE 100 Date: January 26, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family d | |||||
SCORE 100 30 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie 1. 33 kw photovoltaic system -- on one unit of a triplex. Photovoltaic arrays on untis 2 and 3 by separate permit. Array to remain below ridge, inside of rake edges and above eave. Date: February 1, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family a | |||||
SCORE 100 3034 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie 1. 33 kw photovoltaic system -- on second unit of a triplex. Photovoltaic arrays on untis 1 and 3 by separate permit. Array to remain below ridge, inside of rake edges and above eave. Date: February 1, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family a | |||||
SCORE 100 30 Littleleaf Ln Boulder Co Installation of . 76 kw solar array, flush mounted and grid tied. Not to exceed ridge height of existing structure. Date: February 1, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family a | |||||
SCORE 100 3054 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie 3. 8 kw photovoltaic system on a sfd. Array to remain below ridge, inside of rake edges and above eave. Date: February 1, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 3, 2011 | Current use: Single family a | |||||
SCORE 100 3046 Littleleaf Ln Boulder Co Installation of . 76 kw solar array, flush mounted and grid tied. Not to exceed ridge height of existing structure. Date: February 1, 2011 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family a | |||||
SCORE 100 3042 Littleleaf Ln Boulder Co Installation of . 76 kw solar array, flush mounted and grid tied. Not to exceed ridge height of existing structure. Date: February 1, 2011 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family a | |||||
SCORE 100 3014 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie, 1. 71 kw photovoltaic system. Array to remain below ridge, inside of rake edges and above eave. Array is on half a duples -- array for other half by separate permit. Date: February 2, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2011 | Current use: Single family a | |||||
SCORE 100 3038 Littleleaf Ln Boulder Co Installation of 1. 71 kw solar array, flush mounted and grid tied. Not to exceed ridge height. Date: February 2, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family a | |||||
SCORE 100 3018 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie, 1. 71 kw photovoltaic system. Array to remain below ridge, inside of rake edges and above eave. Array is on half a duplex -- array for other half by separate permit. Date: February 2, 2011 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2011 | Current use: Single family a | |||||
SCORE 100 3022 Littleleaf Ln Boulder Co Installation of 1. 71 kw solar array, flush mounted and grid tied. Not to exceed ridge height. Date: February 2, 2011 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 8, 2014 | Current use: Single family a | |||||
SCORE 100 3026 Littleleaf Ln Boulder Co Installation of 1. 33 kw solar array, flush mounted and grid tied. Not to exceed ridge height. Date: February 2, 2011 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2011 | Current use: Single family a | |||||
SCORE 100 3025 Littleleaf Ln Boulder Co Installation of a 10 kw flush-mount grid tied phototvoltaic system in the community building. Array to remain below ridge, inside of rake edges and above eave. Date: February 2, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 19, 2011 | Current use: Amusement/recre | |||||
SCORE 100 15 Norwood Av Boulder Co Installation of 6. 5 kw solar array, flush mounted and grid tied. Not to exceed roof ridge. Date: February 10, 2011 Contractor: Lighthouse Solar Client: Christophe Herrick, Herrick | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 15, 2011 | Current use: Single family d | |||||
SCORE 100 1133 Portland Pl Boulder Co Installation of a 33. 37 kw solar array. Flush mounted on the north building and tilted on the south building. Date: April 12, 2011 Contractor: Lighthouse Solar Client: Of City | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2013 | Current use: Multifamily dwe | |||||
SCORE 100 Date: August 11, 2011 Contractor: Lighthouse Solar Client: Survivor Poston | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 19, 2011 | Current use: Single family d | |||||
SCORE 100 923 Poplar Pl Boulder Co Installation of 3. 29 kw rooftop, flushmounted, photovoltaic solar energy system on single-family residence. Date: August 30, 2011 Contractor: Lighthouse Solar Client: Mark Mcintyre | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2013 | Current use: Single family d | |||||
SCORE 100 3 Mapleton Av Boulder Co Installation of a flush mount grid-tie 3. 96 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. Standing seam metal roof. See engineerfoots letter and drawings for specific information. Date: September 2, 2011 Contractor: Lighthouse Solar Client: Melette Evans | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 21, 2011 | Current use: Single family d | |||||
SCORE 100 602 Walden Cr Boulder Co Building -- installation of a flush mount grid-tie 6. 48 kw photovoltaic system on a 4-plex. (units addressed as 602, 604, 606 and 608 walden circle). Arrays to remain below ridges, inside below hips and rake edges, and above eaves. See engineerfoots letter and drawings for specific information. Inverter wiring to to terminate at house panel. Date: October 20, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 22, 2011 | Current use: Townhomes, exis | |||||
SCORE 100 Date: October 27, 2011 Contractor: Lighthouse Solar Client: Janet Stoner, Stoner | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 30, 2012 | Current use: Single family d | |||||
SCORE 100 685 Walden Cr Boulder Co Installation of a 5. 04 kw solar array for 683-687 walden cr., flush mounted and grid tied. Date: October 27, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 21, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 772 Circle Dr Boulder Co Installation of a tilt-up grid-tie 6 kw photovoltaic system see engineerfoots letter and drawing for specific information and solar analysis.. Date: November 4, 2011 Contractor: Lighthouse Solar Client: Christophe Curtis,Abigale Curtis | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 4, 2012 | Current use: Single family d | |||||
SCORE 100 3969 Springleaf Ln Boulder Co Installation of flushmounted, rooftop, 4. 32 kw, grid-tied photovoltaic solar system on a single-family residence. Date: November 7, 2011 Contractor: Lighthouse Solar Client: Farms Cunningham | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 13, 2011 | Current use: Single family d | |||||
SCORE 100 Date: November 10, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 16, 2011 | Current use: Multifamily dwe | |||||
SCORE 100 Date: November 15, 2011 Contractor: Lighthouse Solar Client: Aaron Lucas,Olivia Lucas | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: December 1, 2011 | Current use: Single family d | |||||
SCORE 100 Date: November 29, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 28, 2013 | Current use: Multifamily dwe | |||||
SCORE 100 4353 Snowberry Ct Boulder Co Installation of a rooftop, flush mounted, photovoltaic 6. 66 kw solar energy system. Date: December 5, 2011 Contractor: Lighthouse Solar Client: David Rich,Kalush Rich | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 4, 2012 | Current use: Single family d | |||||
SCORE 100 3 Seminole Dr Boulder Co Installation of a ten degree tilt-up grid-tie 4 kw photovoltaic system on a flat see engineerfoots letter and drawing for specific information. Date: December 8, 2011 Contractor: Lighthouse Solar Client: Aaron Lucas,Olivia Lucas | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family d | |||||
SCORE 100 661 Walden Cr Boulder Co Installation of a flush mount grid-tie 2. 34 kw photovoltaic system on two roofs of this quadplex. Arrays to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: December 16, 2011 Contractor: Lighthouse Solar Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 16, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 676 Walden Cr Boulder Co Install new 3. 24 kw solar array on an existing structure. Panels to be flush mount. Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 698 Walden Cr Boulder Co Install new 2. 16 kw solar array on an existing structure. Panels to be flush mount. Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwe | |||||
SCORE 100 Date: January 23, 2012 Contractor: Lighthouse Solar Client: Harold Smith | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: January 26, 2012 | Current use: Single family d | |||||
SCORE 100 2922 4th St Boulder Co Installation of a flush mount grid-tie 6. 12 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: January 30, 2012 Contractor: Lighthouse Solar Client: Bulend Corbacioglu,Sonja Corbacioglu | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 13, 2012 | Current use: Single family d | |||||
SCORE 100 2365 Grape Av Boulder Co Installation of a flush mount grid-tie 1. 48 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: February 22, 2012 Contractor: Lighthouse Solar Client: Graeme Hoste,Carolyn Hoste | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Single family d | |||||
SCORE 100 1225 Meadow Pl Boulder Co Installation of a flush mount grid-tie 8. 25 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: February 29, 2012 Contractor: Lighthouse Solar Client: Perry Brandoff, Brandoff | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 25, 2013 | Current use: Single family d | |||||
SCORE 100 13 Chambers Dr Boulder Co Installation of rooftop, flushmounted, 2. 88 kw photovoltaic solar energy system on residence. Date: April 2, 2012 Contractor: Lighthouse Solar Client: Randall Rutsch | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 10, 2012 | Current use: Single family d | |||||
SCORE 100 3973 Springleaf Ln Boulder Co Installation of a 4. 32 kw solar array, flush mounted and grid tied. Panels not to exceed roof ridge height. Date: July 16, 2012 Contractor: Lighthouse Solar Client: Farms Cunningham | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 21, 2012 | Current use: Single family d | |||||
SCORE 100 6685 Drew Ranch Ln Boulder Co Installation of battery storage for existing 9 kw solar array. To remain grid tied. Date: July 24, 2012 Contractor: Lighthouse Solar Client: Judith Lukjan | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 10, 2013 | Current use: Single family d | |||||
SCORE 100 2909 10th St Boulder Co Removal of an existing 3 kw photovoltaic system from the roof of the garage, and reinstall the srray on the house. Existing panels to be removed and reused -- install new racking and mounting system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: September 25, 2012 Contractor: Lighthouse Solar Client: Kari Santos | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family d | |||||
SCORE 100 607 Forest Av Boulder Co Installation of a flush-mounted grid-tied 2. 16kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: October 22, 2012 Contractor: Lighthouse Solar Client: Kathryn Volkmar,John Volkmar | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 17, 2013 | Current use: Single family d | |||||
SCORE 100 323 Bellevue Dr Boulder Co Installation of low tilt, 12 degrees, rooftop, kilowatt, photovoltaic solar energy system on residence. Date: December 4, 2012 Contractor: Lighthouse Solar Client: Robert Weaver | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 29, 2013 | Current use: Single family d | |||||
SCORE 100 195 Bellevue Dr Boulder Co Installation of 6. 5 kw solar photovoltaic array on existing single family residence. Flush mounted and grid tied. Date: December 10, 2012 Contractor: Lighthouse Solar Client: Vista Bellevue | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family d | |||||
SCORE 100 1009 16th St Boulder Co Installation of 3. 84 kw pv array on bus shelter located at broadway and euclid intersection. Permit for panels and racking only, bus shelter not included on this scope of work. Array to be flush mount, grid tied. Date: January 2, 2013 Contractor: Lighthouse Solar Client: Valley Boulder | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 27, 2013 | Current use: Public works/ut | |||||
SCORE 100 4295 Broadway Boulder Co Installation of 5. 76 kw flush photovoltaic roof on new detached carport permitted separately through pmt2013-01212. Date: July 18, 2013 Contractor: Lighthouse Solar Client: Studio Swoon | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 26, 2013 | Current use: Single family d | |||||
SCORE 100 58 Butte Mill Rd Boulder Co Installation of 1 kw solar photovoltaic array at western disposal. Racking system and structural support is permitted serperately under pmt2013-01125. Date: July 26, 2013 Contractor: Lighthouse Solar Client: Disposal Western | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 15, 2013 | Current use: Service industr | |||||
SCORE 100 26 Baseline Rd Boulder Co Beau jofoots-install single bollard (two ports) electrical vehicle chaging system. Located on the south west corner of building. No review required for this parcel. Connected to utility grid. Two independent amp. Branch circuits. Charging stations to serve the existing inchtake-outinch parking spaces. Date: August 27, 2013 Contractor: Lighthouse Solar Client: Creek Skunk | Applicant: Lighthouse Solar | Permit type: Electrical | Permit status: Cmp | Completion date: September 26, 2013 | Current use: Restaurant, exi | |||||
SCORE 100 Date: September 25, 2013 Contractor: Lighthouse Solar Client: Twenty Macerich | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/reta | |||||
SCORE 100 Date: September 25, 2013 Contractor: Lighthouse Solar Client: Twenty Macerich | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/reta | |||||
SCORE 100 Date: September 25, 2013 Contractor: Lighthouse Solar Client: Twenty Macerich | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/reta | |||||
SCORE 100 Date: September 25, 2013 Contractor: Lighthouse Solar Client: Ball Charlotte | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/reta | |||||
SCORE 100 Date: November 26, 2013 Contractor: Lighthouse Solar Client: Twenty Macerich | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Iss | Current use: Commercial/reta | |||||
SCORE 100 3953 Springleaf Ln Boulder Co Installation of a flush mount grid-tied 2. 28 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Date: November 22, 2013 Contractor: Lighthouse Solar Client: Farms Cunningham | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 20, 2014 | Current use: Single family d | |||||
SCORE 100 Date: December 18, 2013 Contractor: Lighthouse Solar Client: Lisa Mcvicker | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 6, 2014 | Current use: Single family d | |||||
SCORE 100 3963 Springleaf Ln Boulder Co Installation of 2. 28 kw solar photovoltaic array on single family residence. Array to be flush mounted, grid tied. Date: January 15, 2014 Contractor: Lighthouse Solar Client: Farms Cunningham | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2014 | Current use: Single family d | |||||
SCORE 100 Date: April 3, 2014 Contractor: Lighthouse Solar Client: Moe Mia | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Single family d | |||||
SCORE 100 Client: Sdg Properties Llc And Rosemary N Gray | Client Address: 1205 Lakewood Drive Greensboro Nc 27410 | Permit type: Miscellaneous | Permit status: Final inspection made | Current use: Other | Permit id: 201119762 | |||||
SCORE 100 Client: Kimelman, Erik I Kimelman, Dorothy A | Client Address: 221 Mistletoe Dr Greensboro Nc 27403 | Permit type: Addition | Permit status: Final inspection made | Current use: One family residence | Permit id: 201103943 | |||||
SCORE 100 Client: Deuterman, William F Deuterman, Brien R | Client Address: 107 W Brentwood Rd Greensboro Nc 27403 | Permit type: Addition | Permit status: Final inspection made | Current use: One family residence | Permit id: 201103942 | |||||
SCORE 100 Client: John Hall | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 14, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-00072 | |||||
SCORE 100 Client: Nicholas Forster | Permit type: Mechanical | Permit status: Cmp | Completion date: March 1, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-00188 | |||||
SCORE 100 Client: Todd Reed | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 9, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-00615 | |||||
SCORE 100 772 Circle Dr Boulder Co Pv installation on sfd. Awning style on side of home, grid-tied, 3. 8 kw. Also rough-run to be installed for future system 6. 12 kw. Client: Hill Logan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 4, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01040 | |||||
SCORE 100 Client: Douglas Raymond | Permit type: Electrical | Permit status: Cmp | Completion date: June 25, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01041 | |||||
SCORE 100 Client: Valmont | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2009-01097 | |||||
SCORE 100 3135 5th St Boulder Co Installation of a 4. 3 kw pv system. Flush mounted and grid-tied. For installation on a new home under construction. Client: Timothy Meyers | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 9, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01261 | |||||
SCORE 100 Client: Xin Ying | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 5, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01356 | |||||
SCORE 100 Client: Mark Johnson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-01521 | |||||
SCORE 100 505 Aurora Av Boulder Co Pv installation on sfd. Roof is flat with deg - 15 deg tilt to panels, grid-tied, 5. 2 kw. Client: Douglas Raymond | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02041 | |||||
SCORE 100 Client: Simon Lipstein | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 26, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02042 | |||||
SCORE 100 Client: William Briggs | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02044 | |||||
SCORE 100 Client: S Hoover | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 31, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02378 | |||||
SCORE 100 Client: Carmen Vigil | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02470 | |||||
SCORE 100 Client: Michael Moore | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 3, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02529 | |||||
SCORE 100 Client: Michael Moore | Permit type: Mechanical | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02530 | |||||
SCORE 100 Client: Erin Leckey | Permit type: Mechanical | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02542 | |||||
SCORE 100 Client: Christophe Lee | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02642 | |||||
SCORE 100 2845 Valmont Rd Boulder Co Mechanical permit - for solar thermal system on climbing gym building. 3 collectors ( tube), 3 tanks ( gallons each). Client: Valmont | Permit type: Mechanical | Permit status: Cmp | Completion date: September 18, 2009 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2009-02643 | |||||
SCORE 100 Client: Shawn Otteman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family attached dwelling, existin | Permit id: Pmt2009-02644 | |||||
SCORE 100 Client: Erin Leckey | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02645 | |||||
SCORE 100 Client: David Powell | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 10, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02646 | |||||
SCORE 100 Client: Kevin Cooney | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 17, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02729 | |||||
SCORE 100 Client: Amelia Greacen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 27, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02730 | |||||
SCORE 100 1 S 35th St Boulder Co Installation of an on-demand water heater -- 199,0 btu. Gas schematic required to be provided to inspector at rough inspection. Client: Rachel Odell | Permit type: Mechanical | Permit status: Cmp | Completion date: February 3, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02844 | |||||
SCORE 100 Client: Seth Portner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 7, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02846 | |||||
SCORE 100 2905 5th St Boulder Co Installation of a flush-mount grid-tie 2. 45 kw photovoltaic system on the garage. Array not to extend above ridge or beyond rake edges of existing roof of garage. Client: Daniel Drury | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 2, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04408 | |||||
SCORE 100 Client: Ski Milburn | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 20, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04506 | |||||
SCORE 100 Client: Charles | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 16, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04507 | |||||
SCORE 100 Client: James Schwarz | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 16, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04509 | |||||
SCORE 100 Client: Anne Giesen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 23, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-04904 | |||||
SCORE 100 1009 16th St Boulder Co Installation of 3. 84 kw pv array on bus shelter located at broadway and euclid intersection. Permit for panels and racking only, bus shelter not included on this scope of work. Array to be flush mount, grid tied. Client: Valley Boulder | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 27, 2013 | Current use: Public works/utilities, existing | Permit id: Pmt2013-00013 | |||||
SCORE 100 4295 Broadway Boulder Co Installation of 5. 76 kw flush photovoltaic roof on new detached carport permitted separately through pmt2013-01212. Client: Studio Swoon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 26, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-01213 | |||||
SCORE 100 58 Butte Mill Rd Boulder Co Installation of 1 kw solar photovoltaic array at western disposal. Racking system and structural support is permitted serperately under pmt2013-01125. Client: Disposal Western | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 15, 2013 | Current use: Service industrial, existing | Permit id: Pmt2013-01529 | |||||
SCORE 100 26 Baseline Rd Boulder Co Beau jofoots-install single bollard (two ports) electrical vehicle chaging system. Located on the south west corner of building. No review required for this parcel. Connected to utility grid. Two independent amp. Branch circuits. Charging stations to serve the existing inchtake-outinch parking spaces. Client: Creek Skunk | Permit type: Electrical | Permit status: Cmp | Completion date: September 26, 2013 | Current use: Restaurant, existing | Permit id: Pmt2013-04295 | |||||
SCORE 100 Client: Twenty Macerich | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2013-04345 | |||||
SCORE 100 Client: Twenty Macerich | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2013-04346 | |||||
SCORE 100 Client: Twenty Macerich | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2013-04347 | |||||
SCORE 100 Client: Ball Charlotte | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 29, 2014 | Current use: Commercial/retail, existing | Permit id: Pmt2013-04348 | |||||
SCORE 100 Client: Twenty Macerich | Permit type: Photovoltaic | Permit status: Iss | Current use: Commercial/retail, existing | Permit id: Pmt2013-05271 | |||||
SCORE 100 3953 Springleaf Ln Boulder Co Installation of a flush mount grid-tied 2. 28 kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Farms Cunningham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 20, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-06646 | |||||
SCORE 100 Client: Lisa Mcvicker | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 6, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2013-07083 | |||||
SCORE 100 3963 Springleaf Ln Boulder Co Installation of 2. 28 kw solar photovoltaic array on single family residence. Array to be flush mounted, grid tied. Client: Farms Cunningham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-00211 | |||||
SCORE 100 Client: Moe Mia | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2014-01004 | |||||
SCORE 100 Client: Harold Smith | Permit type: Electrical | Permit status: Cmp | Completion date: January 26, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00284 | |||||
SCORE 100 2922 4th St Boulder Co Installation of a flush mount grid-tie 6. 12 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Bulend Corbacioglu | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 13, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00387 | |||||
SCORE 100 2365 Grape Av Boulder Co Installation of a flush mount grid-tie 1. 48 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Graeme Hoste | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 11, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00708 | |||||
SCORE 100 1225 Meadow Pl Boulder Co Installation of a flush mount grid-tie 8. 25 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Perry Brandoff | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 25, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-00831 | |||||
SCORE 100 13 Chambers Dr Boulder Co Installation of rooftop, flushmounted, 2. 88 kw photovoltaic solar energy system on residence. Client: Randall Rutsch | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 10, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-01468 | |||||
SCORE 100 3973 Springleaf Ln Boulder Co Installation of a 4. 32 kw solar array, flush mounted and grid tied. Panels not to exceed roof ridge height. Client: Farms Cunningham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 21, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03414 | |||||
SCORE 100 6685 Drew Ranch Ln Boulder Co Installation of battery storage for existing 9 kw solar array. To remain grid tied. Client: Judith Lukjan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 10, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-03576 | |||||
SCORE 100 2909 10th St Boulder Co Removal of an existing 3 kw photovoltaic system from the roof of the garage, and reinstall the srray on the house. Existing panels to be removed and reused -- install new racking and mounting system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Kari Santos | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-04657 | |||||
SCORE 100 607 Forest Av Boulder Co Installation of a flush-mounted grid-tied 2. 16kw photovoltaic system. Array to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Kathryn Volkmar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 17, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05104 | |||||
SCORE 100 323 Bellevue Dr Boulder Co Installation of low tilt, 12 degrees, rooftop, kilowatt, photovoltaic solar energy system on residence. Client: Robert Weaver | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 29, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05462 | |||||
SCORE 100 195 Bellevue Dr Boulder Co Installation of 6. 5 kw solar photovoltaic array on existing single family residence. Flush mounted and grid tied. Client: Vista Bellevue | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2015 | Current use: Single family detached dwelling, existin | Permit id: Pmt2012-05894 | |||||
SCORE 100 Client: Jonathan Anderson | Permit type: Electrical | Permit status: Cmp | Completion date: February 24, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00604 | |||||
SCORE 100 Client: Michael Banks | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 11, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00694 | |||||
SCORE 100 7 Aurora Av Boulder Co Installation of 4. 44 kw, flushmounted, rooftop photovoltaic solar energy system. Client: Virginia Gurley | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 12, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00809 | |||||
SCORE 100 Client: Walnut | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 26, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-00981 | |||||
SCORE 100 5137 Gallatin Pl Boulder Co Installation of a2. 75 kw flush-mount grid-tie photovoltaic system -- panels to remain below ridge elevation and inside the rake edges of the roof. Client: Joann Maneri | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 9, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01556 | |||||
SCORE 100 1145 Drexel St Boulder Co Installation of a flush-mount grid-tie photovoltaic system, 3. 3 kw on the detached garage. Client: Gregory Keeley | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 23, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-01955 | |||||
SCORE 100 46 Mac Arthur Ln Boulder Co Installation of a 2. 775 kw photovoltaic system on a grid racking system -- maximum degreee tilt up. See adr2010-00061 for additional inforamtion. Client: Zachary Castleman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 23, 2010 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-01956 | |||||
SCORE 100 Client: Daniel Heiges | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 2, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02374 | |||||
SCORE 100 2912 4th St Boulder Co Installation of 3. 7 kw solar array on accessory structure. Tilted system, overall height not to exceed twelve feet. Client: Dante Medri | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 21, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02375 | |||||
SCORE 100 35 Frontier Av Boulder Co Installation of a ground mounted kw photovoltaic array in an area southwest of the building. Client: Frontier New | Permit type: Flood not required, photovoltaic | Permit status: Cmp | Completion date: November 16, 2010 | Current use: Warehousing, existing | Permit id: Pmt2010-02565 | |||||
SCORE 100 Client: Andrew Gettelman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 16, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-02657 | |||||
SCORE 100 Client: Transit Special | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Government uses, existing | Permit id: Pmt2010-02904 | |||||
SCORE 100 3855 Orange Ct Boulder Co Installation of a flush mount photovoltaic array in a tilted roof & degree tilt-up photovoltaic array on a flat roof -- 8. 9 kw. Client: Vidan Gonthier | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 28, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04117 | |||||
SCORE 100 3047 Arnett St Boulder Co Installation of 4. 5 kw, rooftop, flush-mounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04144 | |||||
SCORE 100 3053 Arnett St Boulder Co Installation of 4. 5 kw, rooftop, flush-mounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04145 | |||||
SCORE 100 3041 Arnett St Boulder Co Installation of 2. 28 kw, rooftop, flush-mounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04147 | |||||
SCORE 100 504 Geneva Av Boulder Co Installation of kw, rooftop, flush-mounted, photovoltaic solar energy system. Client: Daniel Harvey | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 5, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04163 | |||||
SCORE 100 2857 18th St Boulder Co Pv installation on sfd. Tilt-up ( degrees) on pitched roof, grid-tied, and 4 kw. Client: Corey Nielsen | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 26, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04288 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04330 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04331 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 13, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04332 | |||||
SCORE 100 3083 Arnett St Boulder Co Installation of a flush mount, grid-tied 2. 28 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 14, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04460 | |||||
SCORE 100 3077 Arnett St Boulder Co Installation of a flush mount, grid-tied 4. 5 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 13, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04461 | |||||
SCORE 100 3095 Arnett St Boulder Co Installation of a flush mount, grid-tied 4. 5 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 28, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04462 | |||||
SCORE 100 3089 Arnett St Boulder Co Installation of a flush mount, grid-tied 4. 5 kw photovoltaic array. Array to remain below ridge, inside of rakes, and above eave. Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04463 | |||||
SCORE 100 3052 Arnett St Boulder Co Installation of 1. 14 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04738 | |||||
SCORE 100 3056 Arnett St Boulder Co Installation of 1. 14 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 8, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04741 | |||||
SCORE 100 3048 Arnett St Boulder Co Installation of 3. 42 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 29, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04747 | |||||
SCORE 100 30 Arnett St Boulder Co Installation of 4. 5 kw, rooftop, flushmounted photovoltaic solar energy system on single-family residence. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 27, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04748 | |||||
SCORE 100 26 Raintree Pl Boulder Co Installation of a flush-mounted, grid-tied 2. 75 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 28, 2013 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-04890 | |||||
SCORE 100 3068 Arnett St Boulder Co Nstallation of a flush-mounted, grid-tied 1. 14 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-04895 | |||||
SCORE 100 3072 Arnett St Boulder Co Nstallation of a flush-mounted, grid-tied 1. 14 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-04896 | |||||
SCORE 100 3064 Arnett St Boulder Co Installation of a flush-mounted, grid-tied 4. 5 kw photovoltaic array on a sfd, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-04898 | |||||
SCORE 100 26 Raintree Pl Boulder Co Installation of a flush-mount, grid tie 2. 75 kw photovoltaic system. System to remain below ridge, inside of rakes and above eaves. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 17, 2011 | Current use: Single family attached dwelling | Permit id: Pmt2010-05380 | |||||
SCORE 100 3045 Littleleaf Ln Boulder Co Installation of a flush-mount grid tie 2. 5 kw photovoltaic system to remain below ridge, inside of rakes and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 25, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05408 | |||||
SCORE 100 3063 Littleleaf Ln Boulder Co Installation of a flush-mount grid-tie 4. 5 kw photovoltaic system on a sfd. Panels to remain below ridge, inside of rakes and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05409 | |||||
SCORE 100 3069 Littleleaf Ln Boulder Co Installation of a flush-mount grid-tie 4. 5 kw photovoltaic system on a sfd. Panels to remain below ridge, inside of rakes and above eave. Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05410 | |||||
SCORE 100 3051 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 25, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05411 | |||||
SCORE 100 3057 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05412 | |||||
SCORE 100 3075 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05413 | |||||
SCORE 100 3081 Littleleaf Ln Boulder Co Installation of a flush-mount, grid tie 1. 19 kw photovoltaic system on half of a duplex. Pv array to remain below ridge, inside of rakes and above eave. Array on other half of duplex by separate permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05414 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05552 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 28, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05553 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05554 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05555 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05588 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05589 | |||||
SCORE 100 2665 Raintree Pl Boulder Co Installation of 2. 28 kw, rooftop, flush-mounted photovoltaic solar energy system. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05670 | |||||
SCORE 100 2675 Raintree Pl Boulder Co Installation of 2. 28 kw, rooftop, flush-mounted photovoltaic solar energy system. Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05671 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05759 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05761 | |||||
SCORE 100 Client: Barbara Johnson | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 10, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2010-05770 | |||||
SCORE 100 3086 Littleleaf Ln Boulder Co Pv installation on one unit of tri-plex. Flush mounted, grid-tied, and 0. 76 kw. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05773 | |||||
SCORE 100 30 Littleleaf Ln Boulder Co Pv installation on one unit of tri-plex. Flush mounted, grid-tied, and 0. 76 kw. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05774 | |||||
SCORE 100 3094 Littleleaf Ln Boulder Co Pv installation on one unit of tri-plex. Flush mounted, grid-tied, and 0. 76 kw. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05775 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05787 | |||||
SCORE 100 3078 Littleleaf Ln Boulder Co Installation of a flush-mount photovoltaic array -- 0. 76 kw. This array is 1 3 of a triplex array. Permits for 3074 littleleaf and 3082 littleleaf by separate permit. Client: Authority Housing | Permit type: Photovoltaic | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05788 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: N&v | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-05789 | |||||
SCORE 100 1665 Orchard Av Boulder Co Installation of three panels to an existing ground mounted solar array. 585 watts. Client: Wolfgang Reitz | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 22, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04574 | |||||
SCORE 100 3803 N 26th St Boulder Co Installation of rooftop, tilt-mounted photovoltaic solar energy system. Total system size to be kw (7. 5 kw on garage array and 2. 5 kw on house array). Client: Revocable | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 13, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00142 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2014 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00382 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 24, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00383 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00384 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 2, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00385 | |||||
SCORE 100 30 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie 1. 33 kw photovoltaic system -- on one unit of a triplex. Photovoltaic arrays on untis 2 and 3 by separate permit. Array to remain below ridge, inside of rake edges and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00481 | |||||
SCORE 100 3034 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie 1. 33 kw photovoltaic system -- on second unit of a triplex. Photovoltaic arrays on untis 1 and 3 by separate permit. Array to remain below ridge, inside of rake edges and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00482 | |||||
SCORE 100 30 Littleleaf Ln Boulder Co Installation of . 76 kw solar array, flush mounted and grid tied. Not to exceed ridge height of existing structure. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00483 | |||||
SCORE 100 3054 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie 3. 8 kw photovoltaic system on a sfd. Array to remain below ridge, inside of rake edges and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 3, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00484 | |||||
SCORE 100 3046 Littleleaf Ln Boulder Co Installation of . 76 kw solar array, flush mounted and grid tied. Not to exceed ridge height of existing structure. Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00485 | |||||
SCORE 100 3042 Littleleaf Ln Boulder Co Installation of . 76 kw solar array, flush mounted and grid tied. Not to exceed ridge height of existing structure. Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00486 | |||||
SCORE 100 3014 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie, 1. 71 kw photovoltaic system. Array to remain below ridge, inside of rake edges and above eave. Array is on half a duples -- array for other half by separate permit. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00488 | |||||
SCORE 100 3038 Littleleaf Ln Boulder Co Installation of 1. 71 kw solar array, flush mounted and grid tied. Not to exceed ridge height. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 7, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00489 | |||||
SCORE 100 3018 Littleleaf Ln Boulder Co Installation of a flush mount grid-tie, 1. 71 kw photovoltaic system. Array to remain below ridge, inside of rake edges and above eave. Array is on half a duplex -- array for other half by separate permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00490 | |||||
SCORE 100 3022 Littleleaf Ln Boulder Co Installation of 1. 71 kw solar array, flush mounted and grid tied. Not to exceed ridge height. Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 8, 2014 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00491 | |||||
SCORE 100 3026 Littleleaf Ln Boulder Co Installation of 1. 33 kw solar array, flush mounted and grid tied. Not to exceed ridge height. Permit type: Photovoltaic | Permit status: Cmp | Completion date: June 15, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-00492 | |||||
SCORE 100 3025 Littleleaf Ln Boulder Co Installation of a 10 kw flush-mount grid tied phototvoltaic system in the community building. Array to remain below ridge, inside of rake edges and above eave. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 19, 2011 | Current use: Amusement/recreational - indoor, existin | Permit id: Pmt2011-00493 | |||||
SCORE 100 15 Norwood Av Boulder Co Installation of 6. 5 kw solar array, flush mounted and grid tied. Not to exceed roof ridge. Client: Christophe Herrick | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 15, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-00588 | |||||
SCORE 100 1133 Portland Pl Boulder Co Installation of a 33. 37 kw solar array. Flush mounted on the north building and tilted on the south building. Client: Of City | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2013 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-01417 | |||||
SCORE 100 2045 Balsam Dr Boulder Co Removal of a portion existing photovoltaic system -- remove 12 panels out of a 36 panel system, remove existing weighted ballast racking system and install a bipv coolply adhered racking system. Client: Jill Mcintyre | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 18, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-02633 | |||||
SCORE 100 Client: Survivor Poston | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 19, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03450 | |||||
SCORE 100 923 Poplar Pl Boulder Co Installation of 3. 29 kw rooftop, flushmounted, photovoltaic solar energy system on single-family residence. Client: Mark Mcintyre | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 19, 2013 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03697 | |||||
SCORE 100 3 Mapleton Av Boulder Co Installation of a flush mount grid-tie 3. 96 kw photovoltaic system array to remain below ridge, inside below hips and rake edges, and above eave. Standing seam metal roof. See engineerfoots letter and drawings for specific information. Client: Melette Evans | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 21, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-03769 | |||||
SCORE 100 602 Walden Cr Boulder Co Building -- installation of a flush mount grid-tie 6. 48 kw photovoltaic system on a 4-plex. (units addressed as 602, 604, 606 and 608 walden circle). Arrays to remain below ridges, inside below hips and rake edges, and above eaves. See engineerfoots letter and drawings for specific information. Inverter wiring to to terminate at house panel. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 22, 2011 | Current use: Townhomes, existing | Permit id: Pmt2011-04559 | |||||
SCORE 100 Client: Janet Stoner | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 30, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04663 | |||||
SCORE 100 685 Walden Cr Boulder Co Installation of a 5. 04 kw solar array for 683-687 walden cr., flush mounted and grid tied. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 21, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04666 | |||||
SCORE 100 772 Circle Dr Boulder Co Installation of a tilt-up grid-tie 6 kw photovoltaic system see engineerfoots letter and drawing for specific information and solar analysis.. Client: Christophe Curtis | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 4, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04845 | |||||
SCORE 100 3969 Springleaf Ln Boulder Co Installation of flushmounted, rooftop, 4. 32 kw, grid-tied photovoltaic solar system on a single-family residence. Client: Farms Cunningham | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 13, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-04865 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 16, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-04946 | |||||
SCORE 100 Client: Aaron Lucas | Permit type: Electrical | Permit status: Cmp | Completion date: December 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05001 | |||||
SCORE 100 Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 28, 2013 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05181 | |||||
SCORE 100 4353 Snowberry Ct Boulder Co Installation of a rooftop, flush mounted, photovoltaic 6. 66 kw solar energy system. Client: David Rich | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 4, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05260 | |||||
SCORE 100 3 Seminole Dr Boulder Co Installation of a ten degree tilt-up grid-tie 4 kw photovoltaic system on a flat see engineerfoots letter and drawing for specific information. Client: Aaron Lucas | Permit type: Photovoltaic | Permit status: Iss | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05327 | |||||
SCORE 100 661 Walden Cr Boulder Co Installation of a flush mount grid-tie 2. 34 kw photovoltaic system on two roofs of this quadplex. Arrays to remain below ridge, inside below hips and rake edges, and above eave. See engineerfoots letter and drawing for specific information. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 16, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05461 | |||||
SCORE 100 676 Walden Cr Boulder Co Install new 3. 24 kw solar array on an existing structure. Panels to be flush mount. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05540 | |||||
SCORE 100 698 Walden Cr Boulder Co Install new 2. 16 kw solar array on an existing structure. Panels to be flush mount. Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05541 | |||||
SCORE 100 Client: William Wise | Permit type: Electrical | Permit status: Cmp | Completion date: April 10, 2007 | Current use: Office - technical, existing | Permit id: Pmt2006-05176 | |||||
SCORE 100 Client: Kevin Morningstar | Permit type: Building, electrical, photovoltaic | Permit status: Cmp | Completion date: February 1, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2006-05257 | |||||
SCORE 100 15 Redwood St Boulder Co Installation of rooftop solar system with flushmount panels for photovoltaic and solar hot water heat. Client: Jeffrey Truesdall | Permit type: Mechanical, photovoltaic | Permit status: Cmp | Completion date: April 19, 2010 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-00211 | |||||
SCORE 100 7 31st St Boulder Co Solar pv system mounted on roof top. Tilt-up panels and structural modifications. Client: Thomas Kehoe | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: February 26, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-00517 | |||||
SCORE 100 2045 Balsam Dr Boulder Co Installation of 7. 488 kw photovoltaic system on sfd, flush mounted per engineerfoots report, on a unistrut system. Client: Jill Mcintyre | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 11, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-00992 | |||||
SCORE 100 Client: Allon Cohne | Permit type: Electrical | Permit status: Cmp | Completion date: October 5, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-01163 | |||||
SCORE 100 Client: Celia Sinoway | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 1, 2011 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-01399 | |||||
SCORE 100 Client: Kenneth Harris | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 11, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-01575 | |||||
SCORE 100 Client: Peter Oatman | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 12, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02529 | |||||
SCORE 100 Client: Neher | Permit type: Photovoltaic | Permit status: Cmp | Completion date: February 6, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02804 | |||||
SCORE 100 335 Lee Hill Dr Boulder Co Installation of 8 kw, flush-mounted photovoltaic system on single-family residence. Client: David Jacobs | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-02899 | |||||
SCORE 100 Client: Christophe Burghart | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 24, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03358 | |||||
SCORE 100 3665 Longwood Av Boulder Co Installation of a tilt-up photovoltaic solar system, 7. 2 kw on a flat roof. See adr2007-00085 for administrative solar exception. System to be installed to conform to provisions of adr2007-00085. Client: Jon Kogut | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 17, 2007 | Current use: Single family detached dwelling | Permit id: Pmt2007-03717 | |||||
SCORE 100 Client: John Kelly | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 8, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-03978 | |||||
SCORE 100 Client: Neil Korte | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 21, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-04624 | |||||
SCORE 100 Client: Wolfgang Reitz | Permit type: Building, photovoltaic | Permit status: Cmp | Completion date: November 21, 2007 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-04764 | |||||
SCORE 100 29 17th St Boulder Co Installation of flushmounted, rooftop solar system, 4 kw photovoltaic grid-tied system and 60,0 btu solar domestic hot water system. Client: Llc Seventeenth | Permit type: Mechanical, photovoltaic | Permit status: Cmp | Completion date: September 28, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-05043 | |||||
SCORE 100 Client: Marlene Zaleznick | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 2, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2007-05597 | |||||
SCORE 100 Client: Louise Leach | Permit type: Electrical, photovoltaic | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-00179 | |||||
SCORE 100 Client: Louise Leach | Permit type: Mechanical | Permit status: Cmp | Completion date: April 25, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-00183 | |||||
SCORE 100 852 11th St Boulder Co Installation of rooftop, flush-mount, closed loop collector, tube solar domestic hot water system. Client: Herbert Fenster | Permit type: Mechanical | Permit status: Cmp | Completion date: January 8, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-00644 | |||||
SCORE 100 Client: Thomas Lorden | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 19, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-00726 | |||||
SCORE 100 Client: Brian Spielmann | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 24, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-00729 | |||||
SCORE 100 Client: Waylon Lewis | Permit type: Flood nonsubstantial mod/add, photovoltaic | Permit status: Cmp | Completion date: March 26, 2008 | Current use: Single family detached dwelling, alterat | Permit id: Pmt2008-00997 | |||||
SCORE 100 Client: David | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 2, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01053 | |||||
SCORE 100 Client: Kreith Frank | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 30, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01269 | |||||
SCORE 100 Client: Audrey Sheridan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: May 12, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01645 | |||||
SCORE 100 Client: Janice Michon | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-01790 | |||||
SCORE 100 Client: Jeannette Shorter | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 1, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2008-02222 | |||||
SCORE 100 Client: Louise Shorter | Permit type: Electrical, photovoltaic | Permit status: Cmp | Completion date: May 7, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02223 | |||||
SCORE 100 Client: Emma Espino | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 3, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02383 | |||||
SCORE 100 Client: Goodman E | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02384 | |||||
SCORE 100 Client: Michael Kracauer | Permit type: Mechanical, photovoltaic | Permit status: N&v | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02386 | |||||
SCORE 100 3945 17th St Boulder Co Installation of a flush-mount 3. 2 kw grid-tie photovoltaic system. No battery tie-in. Client: Janice Speas | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 18, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02644 | |||||
SCORE 100 Client: Paul Hogan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 4, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02924 | |||||
SCORE 100 Client: Dominic Zichi | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02925 | |||||
SCORE 100 Client: Margaret Alfonso | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family detached dwelling, new | Permit id: Pmt2008-02927 | |||||
SCORE 100 Client: Michael Marsh | Permit type: Photovoltaic | Permit status: Cmp | Completion date: August 27, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03615 | |||||
SCORE 100 Client: Of City | Permit type: Photovoltaic | Permit status: Cmp | Completion date: March 2, 2012 | Current use: Government uses, existing | Permit id: Pmt2008-03616 | |||||
SCORE 100 Client: Abby Jacobs | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 26, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03726 | |||||
SCORE 100 Client: Jeanne Connaghan | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 19, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-03863 | |||||
SCORE 100 Client: Eric Keighin | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 10, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04080 | |||||
SCORE 100 37 23rd St Boulder Co Installation of a solar -thermal evacuated tube collector, solar holding tanks and associated plumbing. Client: Russ Hullet | Permit type: Mechanical | Permit status: Cmp | Completion date: September 15, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04576 | |||||
SCORE 100 39 17th Boulder Co Installation of 7. 56 kw flush-mounted, grid-tied, rooftop photovoltaic solar system. Client: James Baer | Permit type: Photovoltaic | Permit status: Cmp | Completion date: October 29, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04622 | |||||
SCORE 100 Client: Stephen Kelly | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 26, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04781 | |||||
SCORE 100 Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 17, 2008 | Current use: Commercial/retail, existing | Permit id: Pmt2008-04782 | |||||
SCORE 100 Client: Andreas Lee | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 3, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04800 | |||||
SCORE 100 1275 Wildwood Rd Boulder Co Installation of flushmounted, rooftop solar hot water system in single-family residence. Client: Sarah Lee | Permit type: Mechanical | Permit status: Cmp | Completion date: December 17, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-04918 | |||||
SCORE 100 Client: Arrelaine Dameron | Permit type: Photovoltaic | Permit status: Cmp | Completion date: November 24, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05022 | |||||
SCORE 100 Client: Joe Mcdonald | Permit type: Photovoltaic | Permit status: Cmp | Completion date: January 14, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05180 | |||||
SCORE 100 Client: Homes Markel | Permit type: Photovoltaic | Permit status: Cmp | Completion date: December 19, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05231 | |||||
SCORE 100 608 Spruce St Boulder Co Installation of new solar domestic hot water. Flush mounted system. See his2008-00242 for landmark approval. Client: Property Acorn | Permit type: Mechanical | Permit status: Cmp | Completion date: December 17, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-05239 | |||||
SCORE 100 Date: May 1, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: June 19, 2009 | Permit id: Bp-09-0499 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: May 5, 2009 | Permit id: Bp-09-0363 | |||||
SCORE 100 11235 Random Way Lafayette Co Solar domestic hot water system - flush roof mounted, glycol, tied onto existing hot water system Permit type: Residential remodel | Permit status: Close | Completion date: June 29, 2009 | Permit id: Bp-09-0566 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Complete | Completion date: July 2, 2009 | Permit id: Bp-09-0704 | |||||
SCORE 100 Date: May 12, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: June 30, 2009 | Permit id: Bp-09-0547 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: July 2, 2009 | Permit id: Bp-09-0567 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: July 10, 2009 | Permit id: Bp-09-0734 | |||||
SCORE 100 36 Sugarloaf Rd Boulder Co Solar domestic hot water system - flush roof mounted on residence ( tube collector) Date: April 16, 2009 Contractor: Lighthouse Solar Permit type: Residential remodel | Permit status: Close | Completion date: May 5, 2009 | Permit id: Bp-09-0417 | |||||
SCORE 100 Date: June 26, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: August 17, 2009 | Permit id: Bp-09-0880 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 22, 2009 | Permit id: Bp-09-0644 | |||||
SCORE 100 Date: April 9, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: July 17, 2009 | Permit id: Bp-09-0387 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: September 23, 2009 | Permit id: Bp-09-1171 | |||||
SCORE 100 8626 Magnolia Drive Nederland Co Solar thermal (pressurized gycol etylene) flush roof mounted (3 flat collectors) on residence Permit type: Solar electrical system | Permit status: Close | Completion date: September 23, 2009 | Permit id: Bp-09-1208 | |||||
SCORE 100 Permit type: Gas piping | Permit status: Complete | Completion date: July 8, 2009 | Permit id: Bp-09-0881 | |||||
SCORE 100 Permit type: Water heater | Permit status: Expired | Expiration date: July 20, 2011 | Permit id: Bp-09-0737 | |||||
SCORE 100 Date: April 9, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: May 5, 2009 | Permit id: Bp-09-0385 | |||||
SCORE 100 3212 Ridge Rd Nederland Co Eight tube solar thermal tied to existing space heating & dhw system water flush roo mounted on residence Permit type: Residential remodel | Permit status: Permit closed | Completion date: November 22, 2010 | Permit id: Bp-09-0526 | |||||
SCORE 100 11235 Random Way Erie Co Solar domestic hot water system - flush roof mounted, glycol, tied onto existing hot water system Permit type: Residential remodel | Permit status: Close | Completion date: June 29, 2009 | Permit id: Bp-09-0566 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 29, 2009 | Permit id: Bp-09-0591 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: May 5, 2009 | Permit id: Bp-09-0385 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: July 2, 2009 | Permit id: Bp-09-0567 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Complete | Completion date: July 2, 2009 | Permit id: Bp-09-0704 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: July 10, 2009 | Permit id: Bp-09-0734 | |||||
SCORE 100 4409 Prado Dr Eldorado Springs Co Pv solar system 10 kw flush roof mounted, grid tied on residence (ref: bp-09-0411) Permit type: Solar electrical system | Permit status: Close | Completion date: December 29, 2009 | Permit id: Bp-09-0825 | |||||
SCORE 100 251 Shady Hollow Nederland Co Pv solar array 4. 44kw, flush roof mounted, grid tied on residence (ref: bp-08-1833 pv system) Permit type: Solar electrical system | Permit status: Close | Completion date: September 10, 2009 | Permit id: Bp-09-0948 | |||||
SCORE 100 Permit type: Water heater | Permit status: Expired | Expiration date: July 20, 2011 | Permit id: Bp-09-0737 | |||||
SCORE 100 Date: May 28, 2009 Contractor: Lighthouse Solar Permit type: Residential remodel | Permit status: Close | Completion date: June 24, 2009 | Permit id: Bp-09-0640 | |||||
SCORE 100 4409 Prado Dr Boulder Co Pv solar system 10 kw flush roof mounted, grid tied on residence (ref: bp-09-0411) Date: June 19, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: December 29, 2009 | Permit id: Bp-09-0825 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: June 22, 2009 | Permit id: Bp-09-0641 | |||||
SCORE 100 36 Sugarloaf Rd Mountains Co Solar domestic hot water system - flush roof mounted on residence ( tube collector) Permit type: Residential remodel | Permit status: Close | Completion date: May 5, 2009 | Permit id: Bp-09-0417 | |||||
SCORE 100 3212 Ridge Rd Mountains Co Eight tube solar thermal tied to existing space heating & dhw system water flush roo mounted on residence Permit type: Residential remodel | Permit status: Permit closed | Completion date: November 22, 2010 | Permit id: Bp-09-0526 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 29, 2009 | Permit id: Bp-09-0561 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 24, 2009 | Permit id: Bp-09-0640 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 22, 2009 | Permit id: Bp-09-0644 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: April 23, 2009 | Permit id: Bp-09-0309 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: May 5, 2009 | Permit id: Bp-09-0363 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: July 17, 2009 | Permit id: Bp-09-0387 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: June 19, 2009 | Permit id: Bp-09-0499 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: June 30, 2009 | Permit id: Bp-09-0547 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: June 22, 2009 | Permit id: Bp-09-0641 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: August 17, 2009 | Permit id: Bp-09-0880 | |||||
SCORE 100 124 Hazelwood Dr Mountains Co Pv solar panel awning 1. 85kw grid tied, flush mounted with deck modification Permit type: Solar electrical system | Permit status: Close | Completion date: September 1, 2009 | Permit id: Bp-09-0991 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: September 23, 2009 | Permit id: Bp-09-1171 | |||||
SCORE 100 8626 Magnolia Drive Mountains Co Solar thermal (pressurized / gycol etylene) flush roof mounted (3 flat collectors) on residence Permit type: Solar electrical system | Permit status: Close | Completion date: September 23, 2009 | Permit id: Bp-09-1208 | |||||
SCORE 100 Permit type: Gas piping | Permit status: Complete | Completion date: July 8, 2009 | Permit id: Bp-09-0881 | |||||
SCORE 100 Permit type: Water heater | Permit status: Complete | Completion date: July 9, 2009 | Permit id: Bp-09-0884 | |||||
SCORE 100 Date: March 24, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: April 23, 2009 | Permit id: Bp-09-0309 | |||||
SCORE 100 124 Hazelwood Dr Nederland Co Pv solar panel awning 1. 85kw grid tied, flush mounted with deck modification Permit type: Solar electrical system | Permit status: Close | Completion date: September 1, 2009 | Permit id: Bp-09-0991 | |||||
SCORE 100 Permit type: Water heater | Permit status: Complete | Completion date: July 9, 2009 | Permit id: Bp-09-0884 | |||||
SCORE 100 Date: May 14, 2009 Contractor: Lighthouse Solar Permit type: Residential remodel | Permit status: Close | Completion date: June 29, 2009 | Permit id: Bp-09-0561 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 5, 2009 | Permit id: Bp-09-0317 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: June 26, 2009 | Permit id: Bp-09-0655 | |||||
SCORE 100 Permit type: Residential remodel | Permit status: Close | Completion date: May 14, 2009 | Permit id: Bp-09-0365 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: December 15, 2009 | Permit id: Bp-09-0386 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: April 9, 2010 | Permit id: Bp-09-0592 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: November 4, 2009 | Permit id: Bp-09-0817 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Complete | Completion date: April 16, 2009 | Permit id: Bp-09-0207 | |||||
SCORE 100 Permit type: Water heater | Permit status: Complete | Completion date: July 27, 2009 | Permit id: Bp-09-0738 | |||||
SCORE 100 Permit type: Water heater | Permit status: Complete | Completion date: July 14, 2009 | Permit id: Bp-09-0845 | |||||
SCORE 100 Date: October 27, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: December 2, 2009 | Permit id: Bp-09-1614 | |||||
SCORE 100 Date: November 4, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: December 30, 2009 | Permit id: Bp-09-1657 | |||||
SCORE 100 Date: February 16, 2010 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: March 9, 2010 | Permit id: Bp-10-0208 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: October 21, 2009 | Permit id: Bp-09-1418 | |||||
SCORE 100 Permit type: Electrical service change | Permit status: Complete | Completion date: December 17, 2009 | Permit id: Bp-09-1615 | |||||
SCORE 100 6618 Secretariat Drive Longmont Co Solar pv system 3. 33kw flush roof mounted, grid tied on residence Permit type: Solar electrical system | Permit status: Permit closed | Completion date: November 10, 2010 | Permit id: Bp-10-0281 | |||||
SCORE 100 6621 Secretariat Drive Longmont Co Solar pv system 3. 33kw flush roof mounted, grid tied on residence (re: bp-09-1729) Permit type: Solar electrical system | Permit status: Permit closed | Completion date: April 19, 2010 | Permit id: Bp-10-0349 | |||||
SCORE 100 7464 Whirlaway Lane Longmont Co Solar pv system 3. 33kw flush roof mounted, grid tied on residence (re: bp-09-1727) Permit type: Solar electrical system | Permit status: Permit closed | Completion date: April 21, 2010 | Permit id: Bp-10-0359 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: April 19, 2010 | Permit id: Bp-10-0395 | |||||
SCORE 100 6624 Secretariat Drive Longmont Co Solar pv system 3. 33kw grid tied, flush roof mounted on residence (re: bp-09-1842) Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 2, 2010 | Permit id: Bp-10-0474 | |||||
SCORE 100 6615 Secretariat Drive Longmont Co Solar pv system - 3. 33kw grid tied, flush roof mounted on residence (re: bp-09-1843) Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 2, 2010 | Permit id: Bp-10-0475 | |||||
SCORE 100 7452 Whirlaway Lane Longmont Co Solar pv system 3. 33kw grid tied, flush roof mounted on residence (re: bp-09-1844) Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 2, 2010 | Permit id: Bp-10-0476 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: December 16, 2010 | Permit id: Bp-10-0554 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 9, 2010 | Permit id: Bp-10-0555 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 9, 2010 | Permit id: Bp-10-0556 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: September 8, 2010 | Permit id: Bp-10-1196 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit issued | Expiration date: July 5, 2011 | Permit id: Bp-10-2306 | |||||
SCORE 100 Permit type: Boiler | Permit status: Complete | Completion date: October 6, 2009 | Permit id: Bp-09-1408 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: December 2, 2009 | Permit id: Bp-09-1614 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: December 30, 2009 | Permit id: Bp-09-1657 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: December 21, 2009 | Permit id: Bp-09-1800 | |||||
SCORE 100 Permit type: Boiler | Permit status: Complete | Completion date: October 6, 2009 | Permit id: Bp-09-1408 | |||||
SCORE 100 1903 Linden Drive Boulder Co Solar pv array 10kw flush roof mounted , grid tied installed on 1903 linden to supply 1905 linden. Permit type: Solar electrical system | Permit status: Permit closed | Completion date: July 13, 2010 | Permit id: Bp-10-0520 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: March 9, 2010 | Permit id: Bp-10-0208 | |||||
SCORE 100 Date: November 24, 2009 Contractor: Lighthouse Solar Permit type: Solar electrical system | Permit status: Close | Completion date: December 21, 2009 | Permit id: Bp-09-1800 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: March 31, 2010 | Permit id: Bp-10-0329 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: December 15, 2009 | Permit id: Bp-09-1667 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Close | Completion date: February 5, 2010 | Permit id: Bp-09-1832 | |||||
SCORE 100 Permit type: Solar thermal | Permit status: Close | Completion date: February 25, 2010 | Permit id: Bp-10-0180 | |||||
SCORE 100 413 Wild Horse Circle Boulder Co Solar pv system 10. 26kw ground mounted, grid tied (re: sprw-09-0053) Permit type: Solar electrical system | Permit status: Permit closed | Completion date: November 12, 2010 | Permit id: Bp-10-0302 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: April 28, 2010 | Permit id: Bp-10-0396 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Permit closed | Completion date: January 14, 2011 | Permit id: Bp-10-2200 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Withdrawn | Permit id: Bp-10-1294 | |||||
SCORE 100 Permit type: Solar electrical system | Permit status: Withdrawn | Permit id: Bp-10-1995 |