Building Permits at 676 Walden Cr Boulder CO


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 676 Walden Cr Boulder CO over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
95
Repair sewer service from house to main. In easement
Date:  December 2, 2009

Client: Authority Housing | Applicant: Pipeline Industries, Inc | Permit type: Wastewater, right-of | Permit status: Iss
2009/12/02095676 Walden Cr Boulder CoPipeline Industries Inc
SCORE
59
Electrical permit for installation of outlets for radon mitigation fans.
Date:  March 16, 2010

Client: Authority Housing | Applicant: Singletrack Electric | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwe
2010/03/16059676 Walden Cr Boulder CoSingletrack Electric
SCORE
95
Replacement of four, second story decks, two types as and two type bs.
Date:  June 11, 2010
Value:   $21,353

Client: Authority Housing | Applicant: Palace Construction Co Inc | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 10, 2010 | Current use: Multifamily dwe
2010/06/112135395676 Walden Cr Boulder CoPalace Construction Co Inc
SCORE
100
Electrical service change for amp service on duplex and replace existing panel.
Date:  April 14, 2011

Client: Authority Housing | Applicant: Crystal Electric Inc | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family a
2011/04/140100676 Walden Cr Boulder CoCrystal Electric Inc
SCORE
95
Replacement forced air furnace and 1. 5 ton a c in unit 104
Date:  June 17, 2011
Contractor: Welzig Mechanical

Client: Authority Housing | Applicant: Welzig Mechanical | Permit type: Mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Multifamily dwe
2011/06/17095676 Walden Cr Boulder CoWelzig Mechanical
SCORE
95
Building 18 -- on an existing multi-family dwelling unit, removal of existing exterior stairway components (railing, treads and risers) -- stringers to remain. Install replacement perforated metal treads, compliant guardrails and compliant handrails. Dimensions of stairway (riser hight, tread run,and width) to remain unchanged.
Date:  October 27, 2011
Value:   $8,594

Applicant: Palace Construction Co Inc | Permit type: Building | Permit status: Cmp | Completion date: April 18, 2012 | Current use: Multifamily dwe
2011/10/27859495676 Walden Cr Boulder CoPalace Construction Co Inc
SCORE
79
Building eighteen at the bridgewalk complex -- installation of eight disconnects, associated wiring and circuit breakers for proposed a c units in this eight-plex. Installation of eight a c units by separate mechanical permit.
Date:  December 8, 2011

Applicant: Colorado Mountain Electric | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwe
2011/12/08079676 Walden Cr Boulder CoColorado Mountain Electric
SCORE
100
Install new 3. 24 kw solar array on an existing structure. Panels to be flush mount.
Date:  December 27, 2011
Value:   $11,500
Contractor: Lighthouse Solar

Client: Authority Housing | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwe
2011/12/2711500100676 Walden Cr Boulder CoLighthouse Solar
SCORE
95
New 1. 5inch wilkenfoots backflow preventor for walden cir building 18
Date:  February 13, 2012

Client: Authority Housing | Applicant: Integrated Safety Services | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwe
2012/02/13095676 Walden Cr Boulder CoIntegrated Safety Services
SCORE
82
Building eighteen -- installation of seven standard replacement forced-air furnaces in this building and seven new a c units (13 seer minimum) (building eighteen of the bridgewalk complex) each furnace to be 60,000. Units 101, 102, 103, 201, 202, 203 and 204. Electrical by separate permit.
Date:  March 7, 2012

Client: Authority Housing | Applicant: Golden Way Mechanical Inc | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2012 | Current use: Multifamily dwe
2012/03/07082676 Walden Cr Boulder CoGolden Way Mechanical Inc
SCORE
82
Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch.
Date:  April 3, 2012
Contractor: L H L Contractors

Applicant: L H L Contractors | Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Multifamily dwe
2012/04/03082676 Walden Cr Boulder CoL H L Contractors
SCORE
95
Repair sewer service from house to main. In easement
Date:  December 2, 2009

Client: Authority Housing | Permit type: Wastewater, right-of-way | Permit status: Iss | Permit id: Pmt2009-04912
2009/12/02095676 Walden Cr Boulder CoPipeline Industries, Inc
SCORE
95
New 1. 5inch wilkenfoots backflow preventor for walden cir building 18
Date:  March 2, 2012
Value:   $3,957

Client: Authority Housing | Permit type: Fire | Permit status: Cmp | Completion date: March 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00539
2012/03/02395795676 Walden Cr Boulder CoIntegrated Safety Services
SCORE
82
Building eighteen -- installation of seven standard replacement forced-air furnaces in this building and seven new a c units (13 seer minimum) (building eighteen of the bridgewalk complex) each furnace to be 60,000. Units 101, 102, 103, 201, 202, 203 and 204. Electrical by separate permit.
Date:  March 14, 2012
Value:   $15,750

Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: March 28, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-00945
2012/03/141575082676 Walden Cr Boulder CoGolden Way Mechanical Inc
SCORE
82
Tear-off & reroof of a multifamily structure -- 27 squares of asphalt shingles on a pitch represented as 4 12. Shingles to comply with astm d225 or d3462 and d3161 class f. Overlay not allowed. Approved per applicable sections of 2006 ibc and brc 1981 as amended. Mid-roof inspection required if any portion of the roof is below a 4 12 pitch.
Date:  April 4, 2012
Value:   $9,900
Contractor: L H L Contractors

Permit type: Roofing | Permit status: Cmp | Completion date: January 14, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2012-01499
2012/04/04990082676 Walden Cr Boulder CoL H L Contractors
SCORE
59
Electrical permit for installation of outlets for radon mitigation fans.
Date:  March 16, 2010
Value:   $1,350

Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: May 27, 2011 | Current use: Multifamily dwellings, existing | Permit id: Pmt2010-00951
2010/03/16135059676 Walden Cr Boulder CoSingletrack Electric
SCORE
95
Replacement of four, second story decks, two types as and two type bs.
Date:  June 17, 2010
Value:   $91

Client: Authority Housing | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 10, 2010 | Current use: Multifamily dwellings, existing, deck, n | Permit id: Pmt2010-02285
2010/06/179195676 Walden Cr Boulder CoPalace Construction Co Inc
SCORE
100
Electrical service change for amp service on duplex and replace existing panel.
Date:  April 14, 2011
Value:   $200

Client: Authority Housing | Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Single family attached dwelling, existin | Permit id: Pmt2011-01445
2011/04/14200100676 Walden Cr Boulder CoCrystal Electric Inc
SCORE
95
Replacement forced air furnace and 1. 5 ton a c in unit 104
Date:  June 17, 2011
Value:   $3,886
Contractor: Welzig Mechanical

Client: Authority Housing | Permit type: Mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-02533
2011/06/17388695676 Walden Cr Boulder CoWelzig Mechanical
SCORE
95
Building 18 -- on an existing multi-family dwelling unit, removal of existing exterior stairway components (railing, treads and risers) -- stringers to remain. Install replacement perforated metal treads, compliant guardrails and compliant handrails. Dimensions of stairway (riser hight, tread run,and width) to remain unchanged.
Date:  February 29, 2012
Value:   $8,594

Permit type: Building | Permit status: Cmp | Completion date: April 18, 2012 | Current use: Multifamily dwellings, repair | Permit id: Pmt2011-04674
2012/02/29859495676 Walden Cr Boulder CoPalace Construction Co Inc
SCORE
79
Building eighteen at the bridgewalk complex -- installation of eight disconnects, associated wiring and circuit breakers for proposed a c units in this eight-plex. Installation of eight a c units by separate mechanical permit.
Date:  December 9, 2011
Value:   $2,200

Permit type: Electrical | Permit status: Cmp | Completion date: September 15, 2014 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05354
2011/12/09220079676 Walden Cr Boulder CoColorado Mountain Electric
SCORE
100
Install new 3. 24 kw solar array on an existing structure. Panels to be flush mount.
Date:  December 27, 2011
Value:   $11,500
Contractor: Lighthouse Solar

Client: Authority Housing | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 26, 2012 | Current use: Multifamily dwellings, existing | Permit id: Pmt2011-05540
2011/12/2711500100676 Walden Cr Boulder CoLighthouse Solar
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.