Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Nstallation of a flush-mounted, grid-tied 1. 14 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Date: November 5, 2010 Contractor: Lighthouse Solar Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family a | |||||
SCORE 100 Nstallation of a flush-mounted, grid-tied 1. 14 kw photovoltaic array on 1 2 of duples, array to remain below ridge, inside of rakes and above eave. Array on other half of duples by separate permit. Permit type: Photovoltaic | Permit status: Cmp | Completion date: April 20, 2011 | Current use: Single family attached dwelling, existin | Permit id: Pmt2010-04896 |