Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Pv installation on sfd. Grod-tied, flush mounted, 4. 995 kw. Date: June 5, 2009 Contractor: Lighthouse Solar Client: William Briggs,Julie Briggs | Applicant: Lighthouse Solar | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family d | |||||
SCORE 56 Remodel of existing 2 sf bathroom and dressing area. Replacement of cabinetry, countertops, and fixtures. Installation of new 4foot x 9. 5foot steam shower with custom shower pan. Install amp 2 v circuit for steam generator unit. Date: December 28, 2011 Contractor: Brad Green Client: William Briggs,Julie Briggs | Applicant: Brad Green | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: May 3, 2012 | Current use: Single family d | |||||
SCORE 100 Pv installation on sfd. Grod-tied, flush mounted, 4. 995 kw. Client: William Briggs | Permit type: Photovoltaic | Permit status: Cmp | Completion date: July 20, 2009 | Current use: Single family detached dwelling, existin | Permit id: Pmt2009-02044 | |||||
Remodel of existing 2 sf bathroom and dressing area. Replacement of cabinetry, countertops, and fixtures. Installation of new 4foot x 9. 5foot steam shower with custom shower pan. Install amp 2 v circuit for steam generator unit. Date: December 28, 2011 Value: $9,000 Client: William Briggs | Permit type: Electrical, plumbing | Permit status: Cmp | Completion date: May 3, 2012 | Current use: Single family detached dwelling, existin | Permit id: Pmt2011-05553 |