Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
New construction permit Date: May 16, 2016 Permit status: Active | Permit id: 651908 | |||||
Demolition permit Date: February 26, 2016 Permit status: Completed | Permit id: 657519 | |||||
Mechanical permit Date: January 6, 2017 Permit status: Active | Permit id: 727836 | |||||
Alteration permit Date: December 5, 2016 Permit status: Active | Permit id: 717001 | |||||
Plumbing permit Date: December 20, 2016 Permit status: Completed | Permit id: 741377 | |||||
Plumbing permit Date: October 19, 2015 Permit status: Completed | Permit id: 645842 | |||||
Zoning use permit Date: March 10, 2016 Permit status: Completed | Permit id: 623810 | |||||
Zoning permit Date: July 16, 2015 Permit status: Completed | Permit id: 623799 | |||||
Electrical permit Date: June 9, 2016 Permit status: Completed | Permit id: 697891 | |||||
Suppression permit Date: November 30, 2016 Permit status: Active | Permit id: 736220 | |||||
Alteration permit Date: February 1, 2010 Permit status: Completed | Permit id: 254631 | |||||
Electrical permit Date: December 30, 2009 Permit status: Expired | Permit id: 254639 | |||||
Underpinning existing wall Date: December 5, 2016 Permit type: Alteration permit | Permit status: Completed | Completion date: May 15, 2017 | Permit id: 717001 | |||||
Installation of hvac system for seventeen (17) dwelling units as per approved plans in existing four (4) story building. Date: January 6, 2017 Permit type: Mechanical permit | Permit status: Completed | Completion date: June 5, 2017 | Permit id: 727836 | |||||
SCORE 100 For the installation of an automatic fire suppression system throughout a four-story mixed-use structure in accordance with nfpa 13 & 13r standards. Permit is also for the installation of a standpipe system in accordance with nfpa 14 standards. System is equipped with a backflow prevention assembly and is serviced via a 4" fire service main line. Date: November 30, 2016 Contractor: Legacy Fire Sprinkler Services Permit type: Suppression permit | Permit status: Completed | Completion date: June 5, 2017 | Permit id: 736220 | |||||
SCORE 100 Temporary certificate of occupancy Date: June 1, 2017 Contractor: Venco Building Group Inc Permit type: Administrative permit | Permit status: Completed | Completion date: June 1, 2017 | Permit id: 787653 | |||||
Consolidation of four lots into one lot. Erection of a new mixed use building with commercial on the first flr and 4 residential apartments on flrs 1-4, with roof deck. Cantilever awnings over commercail and shared residential entrances. Date: July 16, 2015 Permit type: Zoning permit | Permit status: Completed | Completion date: July 16, 2015 | Permit id: 623799 | |||||
SCORE 100 Install 200amp single phase temporary service for job trailer. Install outdoor electrical panel with gfci. Install power to existing trailer panel from 5 3 16 to 12 31 16 as per 2008 nec (east district) Date: June 9, 2016 Contractor: Baldwin Electrical Const Llc Permit type: Electrical permit | Permit status: Completed | Completion date: September 9, 2016 | Permit id: 697891 | |||||
SCORE 100 Seal 5" sewer lateral pa one call #2015-281174 Date: October 19, 2015 Contractor: Mr Ds Plumbing And Heating Permit type: Plumbing permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 645842 | |||||
For the erection of a four (4) story above grade plane, w. Strge. Utlty bsmnt. & assembly roof deck & rooftop structures, mixed use building with 1st flr vacant commercial space & multi-family residential of cast-in-place concrete shallow footing foundation system, pre-engineered wood & structural steel framed building w. Low-slope roof construction; building to be fully sprinklered. Separate permits reqd for comm space fitout & any mech., elec., plumb., & firesupp work. Site to be excavated at areas adjacent to existing structure(s) not within the scope of this permit. Permit holder to notify owner(s) of adjoining property(ies) no less than ten (10) days prior to commencement of permitted work. Date: May 16, 2016 Permit type: New construction permit | Permit status: Completed | Completion date: July 19, 2017 | Permit id: 651908 | |||||
SCORE 100 Roof pv sys, 2 arrays 2 strings ea of 9 modules to inverter system size-120 2 single phase, main breaker 200a, bus size 225a, 50a backfed breaker from pv sys installed at main panel, system includes all associated wiring and equipt as per the nec (east district) Date: December 30, 2009 Contractor: Robert Monk Permit type: Electrical permit | Permit status: Expired | Completion date: December 30, 2009 | Permit id: 254639 | |||||
SCORE 82 Eos energy solutions has been contracted to install 7 photovoltaic solar array, roof mounted, grid tied. Date: February 1, 2010 Contractor: Eos Energy Solutions Llc Permit type: Alteration permit | Permit status: Completed | Completion date: February 9, 2010 | Permit id: 254631 | |||||
SCORE 100 For complete demolition of three (3) existing attached structure to include foundation removal. Pedestrian protection to be provided in accordance with section b-3306. Active, valid sidewalk closure permit to be secured for installation of temporary site fencing. Asbestos abatement & removal to be completed prior to commencement of demolition work. Date: February 26, 2016 Contractor: Gama Wrecking Inc Permit type: Demolition permit | Permit status: Completed | Completion date: April 5, 2016 | Permit id: 657519 | |||||
SCORE 100 Install 10 amp 1 phase service. Install 18 gang meter and panels for 17 apts and house. Install 4 amp 3 phase. Install 3 gang meter and panels for com1, com2, elevator install all wiring thru out mixed use building as per nec 2008 install fire alarm system throughout as per nfpa 72 Date: May 26, 2017 Contractor: Baldwin Electrical Const Llc Permit type: Electrical permit | Permit status: Completed | Completion date: July 18, 2017 | Permit id: 747564 | |||||
SCORE 86 New construction:interior;plumbing for mixed use 4 story building with 1st flr vacant commercial space & multi-family 17 residential units; roof deck - the installation will comply with the philadephia plumbing code 2004 Date: October 7, 2016 Contractor: Tom Campbell Plumbing Llc Permit type: Plumbing permit | Permit status: Completed | Completion date: June 5, 2017 | Permit id: 701110 | |||||
Consolidation of four lots into one lot. Erection of a new mixed use building with commercial on the first flr and 4 residential apartments on flrs 1-4, with roof deck. Cantilever awnings over commercail and shared residential entrances. Date: March 10, 2016 Permit type: Zoning/use permit | Permit status: Completed | Completion date: March 10, 2016 | Permit id: 623810 | |||||
SCORE 100 New construction:four (4) story mixed use building with 1st flr vacant commercial space & multi-family residential; roof deck; exterior plumbing; 6 "lateral, ct, fai md 4 area drain pa1# 2016-3390033 - the installation will comply with the philadephia plubming code 2004 Date: December 20, 2016 Contractor: Big Dawgs Plumbing And Heating Permit type: Plumbing permit | Permit status: Completed | Completion date: January 24, 2017 | Permit id: 741377 | |||||
SCORE 93 3 1,0 gallon underground storage tank. Collection of soil sample, lab analysis and a closure report will be prepared and submitted to city of phila. All tank removal work will be completed in accordance with padep and city of phila regulations. Date: September 6, 2016 Contractor: Superior Tank And Energy Co Permit type: Demolition permit | Permit status: Completed | Completion date: May 22, 2017 | Permit id: 719740 | |||||
Zoning permit Date: July 16, 2015 Permit status: Completed | Permit id: 623800 | |||||
Plumbing permit Date: October 19, 2015 Permit status: Completed | Permit id: 645839 | |||||
SCORE 100 Seal 5" sewer lateral pa one call #2015-2811757 Date: October 19, 2015 Contractor: Mr Ds Plumbing And Heating Permit type: Plumbing permit | Permit status: Completed | Completion date: October 28, 2015 | Permit id: 645839 | |||||
Consolidation of four lots into one lot. Erection of a new mixed use building with commercial on the first flr and 4 residential apartments on flrs 1-4, with roof deck. Cantilever awnings over commercail and shared residential entrances. Date: July 16, 2015 Permit type: Zoning permit | Permit status: Completed | Completion date: July 16, 2015 | Permit id: 623800 |