Zoning/use permit Date: September 30, 2010 Permit status: Completed | Permit id: 298927 | |||||
Electrical permit Date: April 2, 2014 Permit status: Completed | Permit id: 521751 | |||||
Sign permit Date: October 20, 2010 Permit status: Completed | Permit id: 303963 | |||||
Sign permit Date: October 20, 2010 Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit status: Completed | Permit id: 303963 | |||||
Zoning use permit Date: September 30, 2010 Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit status: Completed | Permit id: 298927 | |||||
Electrical permit Date: April 2, 2014 Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit status: Completed | Permit id: 521751 | |||||
SCORE 84 Exterior lighting replacemnet with new led fixtures to include pole lights wall packs,soffits and drive through canopies as per 2008 nec (east district) Date: April 2, 2014 Contractor: Lin R Rogers Electrical Cont Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Electrical permit | Permit status: Completed | Completion date: September 6, 2014 | Permit id: 521751 | |||||
For use as a day care center within an existing building. No signs on this application. Date: April 25, 2017 Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Use permit | Permit status: Completed | Completion date: April 25, 2017 | Permit id: 775132 | |||||
SCORE 95 Level ii interior alterations with complete change of occupancy to create a day care center on the first floor of an existing building with existing accessory spaces on the mezzanine as per approved plans. Building to be fully sprinklered. Separate permits required for mep & fire suppression work Date: April 25, 2017 Contractor: Phila Suburban Development Cor Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Alteration permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 775137 | |||||
SCORE 100 Removal and closure of (1) 1,0 gallon heating oil tank (heating oil) Date: May 31, 2017 Contractor: Enviromental Maintenance Co In Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Demolition permit | Permit status: Completed | Completion date: June 30, 2017 | Permit id: 787875 | |||||
SCORE 100 For the installation of a 4-inch fire service line for an automatic fire suppression sprinkler system with a backflow prevention assembly in accordance with nfpa 13 Date: May 23, 2017 Contractor: Tri State Fire Protection Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Suppression permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 777255 | |||||
SCORE 100 Install new fire alarm system as per nfpa 72 & install new lighting, switches & receptical & replace one 200amp panel as per nec 2008 east district Date: June 27, 2017 Contractor: Robert O Brien Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Electrical permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 786038 | |||||
Installation of replacement signs - all other signs to be removed. Date: September 30, 2010 Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 30, 2010 | Permit id: 298927 | |||||
SCORE 99 Replace (2) packaged rooftop hvac units, install new ductwork, (6) exhaust fans, (44) grill, registers, & diffusers, (1) electric wall heater, (1) ducted mini split system. Date: June 15, 2017 Contractor: Ja Smith Heating And Ac Inc Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Mechanical permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 787032 | |||||
SCORE 95 For the removal of existing signs and for the placement of one wall sign as shown on the approved plans. This work activity is required to be performed by a licensed contractor registered with the city of philadelphia. A temporary banner will cover the sign until the unveiling. Date: October 20, 2010 Contractor: Icon Identity Solutions Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Sign permit | Permit status: Completed | Completion date: May 18, 2011 | Permit id: 303963 | |||||
SCORE 100 Alterations: interior plumbing; change of occupancy; day care center;first floor - the installation will comply with the philadephia plubming code 2004 Date: June 27, 2017 Contractor: Big Dawgs Plumbing And Heating Client: Peruto Lori N Tr Nicoletti Mark&ferrier Do | Permit type: Plumbing permit | Permit status: Completed | Completion date: August 15, 2017 | Permit id: 789043 |