SCORE 95 Install (16) level 2 evse vehicle charging stations in parking garage #1 Date: January 17, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14000-00173 | |||||
SCORE 95 12000-01817: deferred submittal for "greenscreen" on pg1 Date: January 3, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00005 | |||||
SCORE 95 12000-01817: deferred submittal for parking garage 1 Date: October 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00607 | |||||
SCORE 95 12000-01817: deferred submittal for new elevator shaft Date: November 21, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00728 | |||||
SCORE 95 Temporary construction trailer: restroom trailer (288 sf). (three separate trailers each with own permit office a 13000-00098, office b 13000-00099) Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Bld - approved | Permit id: 13000-00100 | |||||
SCORE 95 New 3-story commercial parking garage #pg1, 217,279 sf Date: July 26, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01817 | |||||
SCORE 95 12000-00432: revision to canopy bracing Date: October 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00606 | |||||
SCORE 100 Vmware: tenant improvement for building htf. New "war room" conference room fire riser closet ~9 sq ft Permit status: Permit issued | Permit id: 13000-02192 | |||||
SCORE 95 11000-03276: revision to change entry gate at north end of garage. No changes to green screen Date: August 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00496 | |||||
SCORE 95 (ref permit #12-1817) revisions to vmware parking garage #1: relocated the electrical room to 1st floor and reconfigure parking layout accordingly. Bulletin 26, delta 28 plans. Date: July 3, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00425 | |||||
SCORE 95 (ref permit #12-1817) parking garage #1 deferred submittal for precast concrete wall panels Date: June 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00377 | |||||
SCORE 95 (ref permit #11-3128) revisions to bldg htd: add exterior exit signs Date: June 18, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00387 | |||||
SCORE 95 (ref permit #12-432) vmware parking garage #2 deferred submittal for exterior green screen Date: June 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00376 | |||||
SCORE 95 Install (13) electric vehicle charging station in parking garage structure. Date: May 24, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-01412 | |||||
SCORE 95 (ref permit #12-1817) revisions to parking garage pg1: exit sign locations, add two-way communication system at elevator lobbies. Bulletin #20 Date: May 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00306 | |||||
SCORE 95 (ref permit #11-3276) phase 2 parking garage pg2 site revisions: new vehicular entry and driveway at north side of garage (site bulletin #4) p2a-pg2-si-rev2 Date: April 23, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00262 | |||||
SCORE 95 11000-03279: phase 2 site improvement revision to relocate transformers per cpa requirements and revise secondary conduit. Date: April 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00241 | |||||
SCORE 95 11000-03279: phase 2 site work revision to reclaimed water system Date: April 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00240 | |||||
SCORE 95 (ref permit #11-3276)revisions to parking garage pg2 site improvements: relocate fire hydrant and new 4-way fdc and 6" fire line. Date: January 25, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00047 | |||||
SCORE 95 (ref permit #12-432) parking garage pg2 stair revisions per field conditions Date: March 26, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00186 | |||||
SCORE 95 (ref permit #12-432) revisions parking garage pg2 to top of cricket elevations, wall type at elevator, electrical room louver relocation, revised roof plan at elevator and misc details Date: February 22, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00108 | |||||
SCORE 95 (ref permit #12-1817) parking garage pg1 bulletin 14 revisions: revise top of cricket elevations, electrical room wall rating,roof drains, exit lights locations, light fixture layout, plumbing layout changes. Date: April 5, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00214 | |||||
SCORE 95 12000-00432: revision to pg2 parking layout, revised stair #2 at parking garage 2 Date: April 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00206 | |||||
SCORE 95 11-3128: htd building revise mechanical vav at restrooms. Date: April 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00204 | |||||
SCORE 95 (ref permit #11-3128) revisions to building htd (p2a-htd-rev7): revised casework to be handicap accessible, added handrails in auditorium aisles @ existing steps; added vav min design values; emergency power for handicap lift in auditorium Date: March 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00137 | |||||
SCORE 95 11-3128: bldg htd (p2a-htd-rev6) exit sign removal. Bulletin 11 Date: February 1, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00055 | |||||
SCORE 95 11-3128: bldg htd (p2a-htd-rev5), revisions to architectural, electrical and structural drawings. Bulletin 9 Date: January 17, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00024 | |||||
SCORE 95 (ref permit #11-3128) revisions to bldg htd (p2a-htd-rev4): interior architectural, electrical, structural changes. Bulletin 8 Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00007 | |||||
SCORE 95 (ref permit #11-3128) bldg htd, (p2a-htd-rev3) interior room changes including reloaction of lights, hvac diffusers, misc interior changes. Bulletin 7 Date: November 7, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00610 | |||||
SCORE 95 (ref permit #11-3128)vmware project p2a-htd-rev2: minor facade changes, exterior ramp, interior room changes, restroom changes, lighting and misc hvac and plumbing changes. Bulletin 2 Date: June 6, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00312 | |||||
SCORE 95 (ref permit #11-3128)vmware project# p2a-htd-rev1: new lobby building addition to bldg htd, bullletin 1 Date: June 6, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00309 | |||||
SCORE 95 (ref permit #11-3279) phase 2a, site improvements revisions bulletin 8: changes to trash transformer enclosure yard, new access driveway, minor grading and utility changes, revised concrete wall details, electrical vault added.(p2a-si-rev8) Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00646 | |||||
SCORE 95 Vmware: building htd, relocation of the interconnection for the pv system. Date: January 22, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00233 | |||||
SCORE 95 (ref permit #12-432) bldg parking garage pg2 deferred submittal for metal stairs #1 to 4. Date: March 18, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00163 | |||||
SCORE 95 11000-03129: revise bldg htc plans to show additional exit signs per building inspector Date: February 15, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00094 | |||||
SCORE 95 Vmware: construction of a new three level parking garage, with partial basement Date: February 24, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00432 | |||||
SCORE 95 Temporary construction trailer: office trailer a (1914 sf). (three separate trailers each with own permit office b 13000-00099, restroom 13000-00100) Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00098 | |||||
SCORE 95 Temporary construction trailer: office trailer b(792 sf). (three separate trailers each with own permit office a 13000-00098, restroom 13000-00100) Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00099 | |||||
SCORE 95 11-3129: field revisions: revised exiting plan and added notes to exterior ramp. Date: December 21, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00713 | |||||
SCORE 95 11-3129: revision to electric panel Date: November 9, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00618 | |||||
SCORE 95 (ref permit #11-3279) site improvements revisions bulletin 7: exterior light fixtures added Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00647 | |||||
SCORE 95 Vmware: building htf, relocation of the interconnection for the pv system. Pv system was installed under permit 08-2664. Date: October 12, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-02575 | |||||
SCORE 95 (ref permit #11-3279) material change to underground electrical piping elbows to pvc Date: November 7, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00607 | |||||
SCORE 95 (ref permit #11-3279) shotcrete substitution for cast-in-place concrete site retaining walls Date: November 1, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00590 | |||||
SCORE 95 (ref permit #11-3279) revisions to site retaining walls to accommodate permitted revisions to separate landscape permits. Date: August 29, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00489 | |||||
SCORE 95 (ref permit #11-3279) revisions to site improvements for phase 2 to match landscape permit revision 12rev-447. Revisions to include raised sidewalks, area drains changes. Date: August 23, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00475 | |||||
SCORE 95 (ref permit #12-751) revisions to vmware phase 2 site improvements: minor material changes, scope changes to fountain, pavement and tree plantings. Date: August 13, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00447 | |||||
SCORE 95 (ref permit #11-3129) revisions to the main permit: deletion of proposed balcony, exterior finihs change in select areas, deltion of roof canopy panels in select areas, minor interior wall layout changes, minor lighting, hvac and plumbing changes. Date: August 22, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00470 | |||||
SCORE 95 11-3127: building htf revision includes suspended ductwork system Date: July 17, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00396 | |||||
SCORE 95 11000-03128: building htd, revision for duct support details Date: July 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00384 | |||||
SCORE 95 11000-03129: revision for duct bracing Date: July 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00383 | |||||
SCORE 95 Install temporary diesel generator ~1200kva for temp power. Date: July 3, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01559 | |||||
SCORE 95 11000-03127: deferred submittal for plastic sklylight calculations Date: June 27, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00361 | |||||
SCORE 95 11-3127: add stairs clarifications Date: June 21, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00336 | |||||
SCORE 95 (ref permit #11-3127) revise the accessible path of travel to existing building htf. Vmware project #p2a-htf-rev2. Date: June 13, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00323 | |||||
SCORE 95 (ref permit #11-3127) revise interior wall layouts, wall demolition, ceiling changes, exterior sunshade changes, exterior wall finish change extent, waterproofing detail changes, misc. Electrical and new fall arrest system. Vmware project #p2a-htf-rev1. Date: May 16, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00268 | |||||
SCORE 95 (ref permit #11-3279) revise site improvement plan to modify handicap accessible parking stalls to serve existing building htf. Vmware project p2a-si-rev3. Date: June 13, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00322 | |||||
SCORE 95 (ref permit 12-432) vmware project p2a-pg2-rev2: deferrred submittal for structural details and calculations for pre-cast panels in the construction of a new three level parking garage, with partial basement Date: May 31, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00293 | |||||
SCORE 95 Landscape and hardscape work to include concrete sidewalks and stairs Date: April 3, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00751 | |||||
SCORE 95 Demolition of building scs, (approx 5575 sf) ref j#3u185. Cheyenne vega from utilities confirmed that there are no individual city meters for bldg scs. Building inspector to confirm at pre-demo meeting. Date: May 1, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01007 | |||||
SCORE 95 (ref permit #12-432) change to redesign footings from spread footings to partial pier and grade beam Date: May 8, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00260 | |||||
SCORE 95 (ref #11-3279) revisions to phase 2 site work: relocating electrical transformers and creating two transformer yards with enclosures, new loop road design from arastradero entry loop road to bldg htf and future garage 1. Date: May 1, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00241 | |||||
SCORE 95 (ref permit #11-3279) increased scope of work to include changes to the civil drawings and utilities to support the separate landscape permit (ref #12-751) in same area. Work includes new outdoor lighting standards and structural footing details for the fountain and site retaining walls. Date: April 12, 2012 Contractor: Swinerton Builders Permit status: Approved | Permit id: 12rev-00213 | |||||
SCORE 95 Vmware, builing h: single office addition to (e) open office area of (e) commercial office building. Date: April 5, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00773 | |||||
SCORE 95 11-3274: revision is created to replace set of plans dated 12-23-2011. New sets have been reviewed and approved by utilities department. Includes sheets ts1. 0 ts2. 0 c1. 0 cd1. 0 sw1 Date: February 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00078 | |||||
SCORE 95 11-3273:vmware, building hta: revision is created to replace set of plans dated 12-23-2011. New sets have been reviewed and approved by utilities department. Includes sheets ts1. 0 ts2. 0 c1. 0 cd1. 0 sw1 Date: February 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00079 |