Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 95 Client: Rouse F S L L C | Permit type: Bu5 | Permit id: 01-30497 | |||||
SCORE 95 Client: Rouse F S L L C | Permit type: Bu4 | Permit id: 01-24762 | |||||
SCORE 95 Client: 3960 H H P L L C | Permit type: Bu1 | Permit id: 04-39631 | |||||
SCORE 95 8 5th Ave Seattle Wa Construct interior non-structural alterations to 23rd floor for attorney general offices per plan, and subject to field inspection. Applicant: Berry, Matthew | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6434199 | |||||
SCORE 95 701 Pike St Seattle Wa Alterations to existing mixed use building to add exit passageway and partition to 9th floor, per plan Applicant: Stormont, John | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6376724 | |||||
SCORE 95 9709 3rd Ave Ne Seattle Wa Change use from office to vocational school (pima medical institute) and construct interior alterations at first floor, northeast corner, of existing commercial building, per plans. Applicant: Golla, Nixon | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6323653 | |||||
SCORE 95 4627 37th Ave Sw Seattle Wa Establish playground accessory to child care center (bright horizons west seattle #6258828), per plan. Applicant: Wood, Stephen | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6258825 | |||||
SCORE 95 45 38th Ave Sw Seattle Wa Initial tenant improvement to portion of 1st floor as an e day care facility, occupy per plan. Applicant: Wood, Stephen | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6258828 | |||||
SCORE 95 2688 Ne University Village St Seattle Wa Alterations to rooftop play area of existing commercial building to install shade canopies for summertime use, per plan Applicant: Erickson, Steve | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6236943 | |||||
SCORE 95 16 Pearl St Boulder Co Phase i -- tenant remodel of western portion of second floor for offices for inchsolidfireinch. Scope of work includes adjustment of interior non-bearing walls, installation of 4 accessible showers, associated electrical, mechanical and plumbing work. Phase ii work by separate review and separate permit at a later date. Client: Pearl 1600.0 | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Office - profes | |||||
SCORE 95 16 Pearl St Boulder Co Interior non-structural only demolition associated with remodel for solidfire proposed in pmt2013-07043. Date: December 16, 2013 Contractor: Swinerton Builders Client: Pearl 1600.0 | Applicant: Swinerton Builders | Permit type: Demolition | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Office - profes | |||||
SCORE 95 16 Pearl St Boulder Co Phase ii of project. Renovation of existing office space. The work shall consist of the removal of open space ceilings, remodel of lighting, and removal and reinstallation of hvac dustwork.. Includes new finishes. Client: Pearl 1600.0 | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Office - profes | |||||
SCORE 95 16 Pearl St Boulder Co Interior non-structural demolition in preparation for tenant remodel pmt2014-01241. Date: March 21, 2014 Contractor: Swinerton Builders Client: Pearl 1600.0 | Applicant: Swinerton Builders | Permit type: Demolition | Permit status: N&v | Current use: Office - profes | |||||
SCORE 95 5665 Flatiron Py Boulder Co Tenant remodel of two floors of office suite. Scope includes remodel of offices, server room, storage and admin. Rooms, relocation of partition walls, remodel of bathrooms, and associated mepfoots. Suite 100 Client: Flatiron 5665.0 | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 11, 2014 | Current use: Office - profes | |||||
SCORE 95 5665 Flatiron Py Boulder Co Interior non-structural demolition of office suite finishes in preparation for tenant remodel pmt2014-01244. Date: March 21, 2014 Contractor: Swinerton Builders Client: Flatiron 5665.0 | Applicant: Swinerton Builders | Permit type: Demolition | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 25 Pearl St Boulder Co Tenant interior remodel of google office space, scope includes creating larger open office space to portion of the suite and work to lobby and breakroom. Client: Llc Bluebell | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Iss | Current use: Office - profes | |||||
SCORE 95 2525 28th St Boulder Co Reconfiguration of interior walls primarily at break room and reception areas. Includes related minor plumbing, electrical and reconfiguration of hvac ductwork. - additional mechanical and electrical scope - submitted 3 12 15 Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: June 15, 2015 | Current use: Office - profes | |||||
SCORE 95 1738 Pearl St Boulder Co Tenant interior finish in the now empty second floor of a new building. Scope will include installation of offices, conference space, and breakroom with associated mepfoots. Client: Pearl 1738.0 | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Cmp | Completion date: August 25, 2015 | Current use: Office - profes | |||||
SCORE 95 53 Airport Bl Boulder Co Tenant interior remodel to common office and break space for it r & d company. Client: Highpoint Upip7 | Applicant: Swinerton Builders | Permit type: Building, electrical | Permit status: Iss | Current use: Office - techni | |||||
SCORE 95 53 Airport Bl Boulder Co Interior non-structural demolition in preparation for tenant interior remodel under pmt2015-03199. Date: August 20, 2015 Contractor: Swinerton Builders Client: Highpoint Upip7 | Applicant: Swinerton Builders | Permit type: Demolition | Permit status: Iss | Current use: Office - techni | |||||
SCORE 95 22 Lincoln Av Altadena Ca 91001 New 370 sf. One story market w/ two attached commercial buildings,that consists of 7 sf & 788 sf. Applicant: Dnyx Architects,Inc | Permit status: Finaled | Completion date: June 29, 2006 | Permit id: 0412020062 | |||||
SCORE 95 Applicant: Onyx Architects,Inc | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: 0412020064 | |||||
SCORE 95 Applicant: Onyx Architects | Permit status: Finaled | Completion date: March 22, 2006 | Permit id: 0501100009 | |||||
SCORE 95 Applicant: Onyx Architects | Permit status: Finaled | Completion date: March 22, 2006 | Permit id: 0501100012 | |||||
SCORE 95 Applicant: Paley Lester | Permit status: Finaled | Completion date: June 29, 2006 | Permit id: 0506130081 | |||||
SCORE 95 Applicant: Onyx Architects | Permit status: Finaled | Completion date: January 4, 2006 | Permit id: 0508040077 | |||||
SCORE 95 Applicant: Dnyx Architects,Inc | Permit status: Finaled | Completion date: January 31, 2006 | Permit id: 0508040079 | |||||
SCORE 95 22 Lincoln Av Los Angeles Ca Revised building:approved under permit #bl0412020064 change footprint & reduce building floor area from 4760sq. Ft. To 4556sq. Ft.&change structual lateral system from Applicant: Ken Mand | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: 0512200051 | |||||
SCORE 95 Applicant: Ken Mand | Permit status: Finaled | Completion date: June 29, 2006 | Permit id: 0602130072 | |||||
SCORE 95 Applicant: Ken Mand | Permit status: Finaled | Completion date: March 22, 2006 | Permit id: 0602130073 | |||||
SCORE 95 Applicant: Raey Nina | Permit status: Finaled | Completion date: March 22, 2006 | Permit id: 0509210005 | |||||
SCORE 95 Date: September 13, 2005 Contractor: Swinerton Builders Applicant: Onyx Architects | Permit status: Permisud | Permit id: 0505030001 | |||||
SCORE 95 Date: September 13, 2005 Contractor: Swinerton Builders Applicant: Onyx Architects | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: 0505030002 | |||||
SCORE 95 2226 Lincoln Av Altadena Ca 91001 49 sf commercial building,install (6) misc conduits and conductors. Date: February 7, 2006 Contractor: Swinerton Builders Applicant: Mand Ken | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: 0602070042 | |||||
SCORE 95 Date: February 9, 2006 Contractor: Swinerton Builders Applicant: Rhonda Robinson | Permit status: Finaled | Completion date: November 22, 2011 | Permit id: 0507070006 | |||||
SCORE 95 Date: February 9, 2006 Contractor: Swinerton Builders Applicant: Rhonda Robinson | Permit status: Finaled | Completion date: November 22, 2011 | Permit id: 0507070007 | |||||
SCORE 95 Date: September 13, 2005 Contractor: Swinerton Builders Applicant: Onyx Architects | Permit status: Permisud | Permit id: 0508040025 | |||||
SCORE 95 2226 Lincoln Av Altadena Ca 91001 Owner/contractors risk to install (2) grease interceptors w/o environmental programs approval. No piping allowed. Date: February 9, 2006 Contractor: Swinerton Builders Applicant: Mand Ken | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: 0602090016 | |||||
SCORE 95 Date: March 2, 2006 Contractor: Swinerton Builders Applicant: Sarin Suket | Permit status: Finaled | Completion date: June 29, 2006 | Permit id: 0603020024 | |||||
SCORE 95 Date: February 16, 2006 Contractor: Swinerton Builders Applicant: Mand Ken | Permit status: Finaled | Completion date: October 23, 2006 | Permit id: 0602160008 | |||||
SCORE 95 Date: February 16, 2006 Contractor: Swinerton Builders Applicant: Dnyx Architects,Inc | Permit status: Finaled | Completion date: June 29, 2006 | Permit id: 0602160009 | |||||
SCORE 95 Date: February 16, 2006 Contractor: Swinerton Builders Applicant: Onyx Architects | Permit status: Finaled | Completion date: March 22, 2006 | Permit id: 0602160010 | |||||
SCORE 95 Date: November 15, 2006 Contractor: Swinerton Builders Applicant: Swinerton Builders | Permit status: Finaled | Completion date: February 28, 2007 | Permit id: 0611150029 | |||||
SCORE 95 Date: December 10, 2013 Contractor: Swinerton Builders Applicant: Swinerton Builders | Permit status: Finaled | Completion date: December 31, 2013 | Permit id: 1312100004 | |||||
SCORE 95 Date: August 4, 2006 Contractor: Swinerton Builders Applicant: Mario Manansala | Permit status: Finaled | Completion date: September 29, 2006 | Permit id: 0608040034 | |||||
SCORE 95 Date: October 2, 2008 Contractor: Swinerton Builders Applicant: Swinerton Builders | Permit status: Finaled | Completion date: April 23, 2009 | Permit id: 0810020018 | |||||
SCORE 95 Date: August 4, 2006 Contractor: Swinerton Builders Applicant: Mario Manansala | Permit status: Finaled | Completion date: September 29, 2006 | Permit id: 0608040017 | |||||
SCORE 95 Date: September 26, 2013 Contractor: Swinerton Builders Permit type: Electrical permit | Permit status: Filed | Permit id: E201309263946 | |||||
SCORE 95 8 5th Ave Seattle Wa Construct tenant improvements to south portion of existing office on the 19th floor (suite 1900) per plan, and subject to field inspection. Applicant: Berry, Matthew | Permit type: Construction | Permit status: Permit closed | Current use: Commercial | Permit id: 6476374 | |||||
SCORE 95 611 Cowper St, Palo Alto, Ca 94301 U&o and office tenant improvement for "a9". Tenant to occupy 255 sf total on 1st 3 floors. Permit type: Project - building permit | Permit status: Permit issued | Permit id: 15000-02849 | |||||
SCORE 95 Date: March 24, 2014 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Void | Permit id: 14000-00675 | |||||
SCORE 95 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03396 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 12000-01801: deferred submittal for plumbing seismic restraint Date: February 25, 2014 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00116 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 12000-01784: deferred submittal--plumbing seismic restraint for building htb Date: February 25, 2014 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00113 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 12000-01778: deferred submittal for plumbing seismic restraints Date: February 25, 2014 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00115 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 12000-01799: deferred submittal for plumbing seismic restraint Date: February 25, 2014 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00114 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Install (16) level 2 evse vehicle charging stations in parking garage #1 Date: January 17, 2014 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00173 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Install (15) level 2 evse vehicle chargers in parking garage #3 Date: January 17, 2014 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 14000-00174 | |||||
SCORE 95 Date: January 3, 2014 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00006 | |||||
SCORE 95 Date: January 3, 2014 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 14rev-00005 | |||||
SCORE 95 Date: October 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00607 | |||||
SCORE 95 Date: December 13, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00775 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-01813: revision, deferred submittal for stairs in parking garage 3 Date: October 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00608 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-00596: new roofing and waterproofing at penthouse roof in conjunction with work by others under separate permit 12000-03027 consisting of pv panel relocation. Delta 14 and delta 14r1 Date: December 19, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00784 | |||||
SCORE 95 Date: November 21, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00728 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-01505: revise pathway connection at htb east entrance site bulletin 18, delta 19 Date: November 12, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00702 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (12000-00596) accessability detail and directional signage changes. Date: November 19, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00720 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-00596: delta includes architectural, mechanical, electrical and plumbing changes and clarifications. No exterior work. Bulletin 8 Date: October 15, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00632 | |||||
SCORE 95 Date: October 24, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00661 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-01505: changes to grading and drainage, extend rolled curb Date: October 15, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Completed | Permit id: 13rev-00633 | |||||
SCORE 95 Date: October 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00606 | |||||
SCORE 95 Date: September 12, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00565 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11000-03276: revision to change entry gate at north end of garage. No changes to green screen Date: August 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00496 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-01505: revision to pg2 garage approach, sitework revision to accessible parking at htg Date: August 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00497 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 12000-01256: revision to roof attachment for stanchions for pv structure (vmware project p2a-f-pv: installation of commercial pv panels on existing building prom-f) Date: July 31, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00489 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1813) vmware parking garage #3 deferred submittal for precast concrete wall panels Date: June 12, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00378 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1817) parking garage #1 deferred submittal for precast concrete wall panels Date: June 12, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00377 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-432) vmware parking garage #2 deferred submittal for exterior green screen Date: June 12, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00376 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) revisions to vmware bldg csf: detail changes to the exterior light gauge steel framing Date: June 17, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00386 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-596) revisions to bldg hte: provide seismic bracing details and locations for plumbing systems Date: July 3, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00426 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1817) revisions to vmware parking garage #1: relocated the electrical room to 1st floor and reconfigure parking layout accordingly. Bulletin 26, delta 28 plans. Date: July 3, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00425 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11000-03279: phase 2 site improvement revision to relocate transformers per cpa requirements and revise secondary conduit. Date: April 16, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00241 | |||||
SCORE 95 499 Hamilton Av, Palo Alto, Ca 94301 13-652: revise electrical plans to include switching with 6 amps service. Date: June 21, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00395 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3128) revisions to bldg htd: add exterior exit signs Date: June 18, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00387 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) bldg cse deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00354 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) bldg csf deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00355 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 (ref permit #12-1778) bldg csd, deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00352 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) bldg htb deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00353 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) deferred submittal to bldg cse for metal stairs Date: May 23, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00345 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) deferred submittal to bldg csf for metal stairs Date: May 23, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00344 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 12-1799: revisions to bldg csf, install accessible 2-way communications system at elevator. Bulletin #23 Date: May 31, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00359 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 12-1801: revisions to bldg cse, install accessible 2-way communication at elevator. Bulletin 22 Date: May 31, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00358 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1813) revisions to parking garage pg3: exit sign locations, add two-way communications at elevator landings. Bulletin #21 Date: May 7, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00307 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1817) revisions to parking garage pg1: exit sign locations, add two-way communication system at elevator lobbies. Bulletin #20 Date: May 7, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00306 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Vmware: revisions to clarify and detail extent of firewall and revisions to firewall termination requirements 12000-00596: project p2b-hte-ti: bldg hte tenant improvements and exterior renovation of existing building. Date: May 13, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00322 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Install (13) electric vehicle charging station in parking garage structure. Date: May 24, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01412 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1505) revisions to phase 3 site improvements: revise existing stairs with new stair additions. (bulletin 8, vmware file: p3-si-rev3) Date: May 16, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00329 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Vmware: building htd, relocation of the interconnection for the pv system. Date: January 22, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00233 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 Vmware building prom e, close-out one exit on first floor, add re-directional exit signs. Date: April 29, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01151 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) bldg htb deferred submittal for metal stairs Date: May 1, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00287 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) revisions to vmware bldg htb: revise the exterior light gauge steel framing to support the building facade Date: May 8, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00312 | |||||
SCORE 95 1 El Camino, Palo Alto, Ca 94304 (ref permit #12-1078) revisions to the site utilities reroute for sewer alignment changes and electrical duct bank changes Date: April 25, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00267 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1813) parking garage pg3 revisions: revise top cricket elevations, electrical room wall rating, roof drains, exit light locations, light fixture locations, plumbing line layout, revise elevator shaft size for bulletin 15. Date: April 5, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00216 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801):structural revisions to bldg cse for bulletin 17 Date: April 5, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00213 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 (ref permit #12-1778) revisions to vmware bldg csd: revise exterior light gauge steel metal framing to support building facade. Date: May 8, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00310 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1817) parking garage pg1 bulletin 14 revisions: revise top of cricket elevations, electrical room wall rating,roof drains, exit lights locations, light fixture layout, plumbing layout changes. Date: April 5, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00214 | |||||
SCORE 95 Date: May 1, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01177 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-596) revisions to vmware bldg hte: relocation of (e) roof top cell equipment Date: March 19, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00165 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) structural revisions to bldg htb for field conditions. Bulletin 16 Date: April 16, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00239 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) structural revisions to bldg csf for bulletin 18 Date: April 16, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00242 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3276) phase 2 parking garage pg2 site revisions: new vehicular entry and driveway at north side of garage (site bulletin #4) p2a-pg2-si-rev2 Date: April 23, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00262 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #11-596) revisions to bldg hte: interior architectural and electrical changes. Bulletin 5. Date: March 7, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00138 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11000-03279: phase 2 site work revision to reclaimed water system Date: April 16, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00240 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) bldg cse deferred submittal for roof trusses Date: April 8, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00219 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-432) bldg parking garage pg2 deferred submittal for metal stairs #1 to 4. Date: March 18, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00163 | |||||
SCORE 95 Date: April 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00204 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 12000-00432: revision to pg2 parking layout, revised stair #2 at parking garage 2 Date: April 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00206 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-01505: added storm pipes (site bulletin #5) to pick up foundation wall base drain discharge pipe Date: April 2, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00207 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 12000-01784: phase 3, bldg htb, bulletin 2, added drains and changed the size of the sanity sewer pipe within the campus from 4-inches to 6-inches (p3-htb-rev6). Date: March 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00195 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 12000-01801: phase 3, bldg cse, bulletin 2, added drains and changed the size of the sanity sewer pipe within the campus from 4-inches to 6-inches. (p3-cse-rev6) Date: March 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00197 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 12000-01799: pahse 3, bldg csf, bulletin 2, added drains and changed the size of the sanity sewer pipe within the campus from 4-inches to 6-inches. (p3-csf-rev6) Date: March 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00196 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-432) parking garage pg2 stair revisions per field conditions Date: March 26, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00186 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-596) bldg hte revisions: roofing changes (bulletins 6 & 6r1) Date: March 7, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00139 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) revisions to bldg csf: architectural floor plan changes and the associated lighting, power and data changes Date: February 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00122 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 (ref permit #12-1778) change storm drain size from 10" to 8" diameter. Date: February 26, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00117 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) revisions to bldg cse: interior floor plan changes and the associated electrical, lighting and data changes. Bulletin #8 Date: February 28, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00123 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 (ref permit #12-1778) bldg csd revisions: kitchen equipment changes, center island change, dining room changes, associated electrical, lighting, mechanical, plumbing and ceiling changes. Health dept approval received 3-21-13. Date: February 21, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00102 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) bldg htb deferred submittal for trus-joist floor and roof trusses Date: March 13, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00154 | |||||
SCORE 95 499 Hamilton Av, Palo Alto, Ca 94301 Interior non-structural demo in preparation for tenant improvement. Date: March 12, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00688 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3128) revisions to building htd (p2a-htd-rev7): revised casework to be handicap accessible, added handrails in auditorium aisles @ existing steps; added vav min design values; emergency power for handicap lift in auditorium Date: March 7, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00137 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-432) revisions parking garage pg2 to top of cricket elevations, wall type at elevator, electrical room louver relocation, revised roof plan at elevator and misc details Date: February 22, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00108 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) interior furniture, cubicle layout changes and the associated power and data layout changes Date: February 11, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00082 | |||||
SCORE 95 Date: February 8, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00079 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11000-03129: revise bldg htc plans to show additional exit signs per building inspector Date: February 15, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00094 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) site improvements revisions bulletin 7: exterior light fixtures added Date: November 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00647 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3276)revisions to parking garage pg2 site improvements: relocate fire hydrant and new 4-way fdc and 6" fire line. Date: January 25, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00047 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11-3128: bldg htd (p2a-htd-rev6) exit sign removal. Bulletin 11 Date: February 1, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00055 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Vmware: building htf, relocation of the interconnection for the pv system. Pv system was installed under permit 08-2664. Date: October 12, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02575 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11-3128: bldg htd (p2a-htd-rev5), revisions to architectural, electrical and structural drawings. Bulletin 9 Date: January 17, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00024 | |||||
SCORE 95 Date: January 15, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00016 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1505) site improvements revisions bulletin 2 to include msic civil, sewer, storm water, fire hydrant service line changes. Date: November 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00645 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-596) revisions to bldg hte: interior architectural, mechanical and electical changes. Date: January 10, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00008 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Temporary construction trailer: restroom trailer (288 sf). (three separate trailers each with own permit office a 13000-00098, office b 13000-00099) Date: January 10, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Bld - approved | Permit id: 13000-00100 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3128) revisions to bldg htd (p2a-htd-rev4): interior architectural, electrical, structural changes. Bulletin 8 Date: January 10, 2013 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 13rev-00007 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Temporary construction trailer: office trailer b(792 sf). (three separate trailers each with own permit office a 13000-00098, restroom 13000-00100) Date: January 10, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00099 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Temporary construction trailer: office trailer a (1914 sf). (three separate trailers each with own permit office b 13000-00099, restroom 13000-00100) Date: January 10, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00098 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799)building csf exterior sun shade deletion, reduction in amount of operable windows, misc mechanical and electrical changes Date: December 4, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00665 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) bldg htb deferred submittal for structural brace frames Date: December 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00705 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) bldg cse deferred submittal for structural brace frames Date: December 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00707 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) building cse changes: deletion of exterior sun shades, reduction of operable windows, misc changes to mechanical and electrical. Date: December 4, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00666 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-1784) building htb changes: deletion of sun shades, reduction in amount of operable windows, misc changes to hvac, electrical Date: December 4, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00667 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) bldg csf deferred submittal for structural brace frames Date: December 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00708 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) building cse revisions bulletin 6: revision to foundation. Change to all piers. Date: November 27, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00654 | |||||
SCORE 95 1 El Camino, Palo Alto, Ca 94304 Site improvements including utility relocation in preparation for future projects. Date: May 10, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01078 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11-3129: field revisions: revised exiting plan and added notes to exterior ramp. Date: December 21, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00713 | |||||
SCORE 95 Date: July 30, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01847 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1799) building csf revisions bulletin 3: structural brace frame change and misc concrete slab thickness info. Date: November 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00643 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 (ref permit #12-1801) bldg cse revisions bulletin 3: structural changes to brace frame and misc concrete slab thickness info. Date: November 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00642 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12000-00596: p2b-hte-ti: misc revisions; exit signs location, finishes, detail clarifications and associated mep items. Date: October 9, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00555 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) revisions to site improvements for phase 2 to match landscape permit revision 12rev-447. Revisions to include raised sidewalks, area drains changes. Date: August 23, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00475 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3128) bldg htd, (p2a-htd-rev3) interior room changes including reloaction of lights, hvac diffusers, misc interior changes. Bulletin 7 Date: November 7, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00610 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Demolition of central plant building. Baaqmd application j#3u185 Date: September 11, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02261 | |||||
SCORE 95 Date: November 7, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00608 | |||||
SCORE 95 Date: November 9, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00616 | |||||
SCORE 95 Date: November 9, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00618 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) material change to underground electrical piping elbows to pvc Date: November 7, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00607 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) shotcrete substitution for cast-in-place concrete site retaining walls Date: November 1, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00590 | |||||
SCORE 95 Date: July 26, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01817 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 New single-story commercial cafeteria building #csd with 15,036 sf. County health dept approval letter received 10-1-12 (see attachments). [deh #sr0839057 & sr0839058] Date: July 24, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01778 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 New 4-story commercial parking garage #pg3, 230,504 sf (to be 9 arastradero rd) Date: July 26, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01813 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 12-00596: revision to revise the size of four (4) previously approved skylights. Skylights are getting smaller and are below the height of the parapet. Date: October 17, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00566 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Site improvements to include landscaping, grading, utility routing, lighting, surface parking, fountains, retaining walls, hardscape improvements. Date: June 26, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01505 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3128)vmware project p2a-htd-rev2: minor facade changes, exterior ramp, interior room changes, restroom changes, lighting and misc hvac and plumbing changes. Bulletin 2 Date: June 6, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00312 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3128)vmware project# p2a-htd-rev1: new lobby building addition to bldg htd, bullletin 1 Date: June 6, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00309 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Vmware: construction of a new three level parking garage, with partial basement Date: February 24, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00432 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Demolition of commercial building r-5, baaqmd application: j#3u185 Date: September 11, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02258 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Demolition of commercial building r-4, baaqmd application: j#3u185 Date: September 11, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-02257 | |||||
SCORE 95 3421 Hillview Av, Palo Alto, Ca 94304 New city secondary electrical transformer, service entrance switchboard. Exiting upgrade for electric room. Date: January 31, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00248 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) revisions to site retaining walls to accommodate permitted revisions to separate landscape permits. Date: August 29, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00489 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-751) revisions to vmware phase 2 site improvements: minor material changes, scope changes to fountain, pavement and tree plantings. Date: August 13, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00447 | |||||
SCORE 95 3421 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-431) revision to show accessible route to bus stop from bldg hta, civil details for accessible parking shown under main permit Date: August 22, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00471 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3129) revisions to the main permit: deletion of proposed balcony, exterior finihs change in select areas, deltion of roof canopy panels in select areas, minor interior wall layout changes, minor lighting, hvac and plumbing changes. Date: August 22, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00470 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 Vmware project p2a-f-pv: installation of commercial pv panels on existing building prom-f Date: May 31, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01256 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11-3127: building htf revision includes suspended ductwork system Date: July 17, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00396 | |||||
SCORE 95 Date: July 10, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00384 | |||||
SCORE 95 Date: July 10, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00383 | |||||
SCORE 95 Date: July 3, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01559 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11000-03127: deferred submittal for plastic sklylight calculations Date: June 27, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00361 | |||||
SCORE 95 Date: June 21, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00336 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3127) revise the accessible path of travel to existing building htf. Vmware project #p2a-htf-rev2. Date: June 13, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00323 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3127) revise interior wall layouts, wall demolition, ceiling changes, exterior sunshade changes, exterior wall finish change extent, waterproofing detail changes, misc. Electrical and new fall arrest system. Vmware project #p2a-htf-rev1. Date: May 16, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00268 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) revise site improvement plan to modify handicap accessible parking stalls to serve existing building htf. Vmware project p2a-si-rev3. Date: June 13, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00322 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit 12-432) vmware project p2a-pg2-rev2: deferrred submittal for structural details and calculations for pre-cast panels in the construction of a new three level parking garage, with partial basement Date: May 31, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00293 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Landscape and hardscape work to include concrete sidewalks and stairs Date: April 3, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00751 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Demolition of commercial building r-6 (135,0 sf). Ref j#3u185. Cheyenne vega from utilities confirmed that there are no individual city meters for bldg scs. Building inspector to confirm at pre-demo inpsection. Date: May 10, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01090 | |||||
SCORE 95 Date: May 14, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01116 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Demolition of building scs, (approx 5575 sf) ref j#3u185. Cheyenne vega from utilities confirmed that there are no individual city meters for bldg scs. Building inspector to confirm at pre-demo meeting. Date: May 1, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01007 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #12-432) change to redesign footings from spread footings to partial pier and grade beam Date: May 8, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00260 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref #11-3279) revisions to phase 2 site work: relocating electrical transformers and creating two transformer yards with enclosures, new loop road design from arastradero entry loop road to bldg htf and future garage 1. Date: May 1, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00241 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) increased scope of work to include changes to the civil drawings and utilities to support the separate landscape permit (ref #12-751) in same area. Work includes new outdoor lighting standards and structural footing details for the fountain and site retaining walls. Date: April 12, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Approved | Permit id: 12rev-00213 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 Vmware, builing h: single office addition to (e) open office area of (e) commercial office building. Date: April 5, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00773 | |||||
SCORE 95 Date: January 20, 2016 Contractor: Swinerton Builders Permit type: Electrical permit | Permit status: Issued | Permit id: E201601083987 | |||||
SCORE 95 | |||||
SCORE 95 Permit type: Ti | |||||
SCORE 95 | |||||
SCORE 95 | |||||
SCORE 95 | |||||
SCORE 95 Date: April 1, 2014 Contractor: Swinerton Builders Permit type: Plumbing permit | Permit status: Complete | Permit id: Pm20140401543 | |||||
SCORE 95 | |||||
SCORE 95 | |||||
SCORE 95 | |||||
SCORE 95 Permit type: Ti | |||||
SCORE 95 | |||||
SCORE 95 2343 California Ave Sw Seattle Wa Construct alterations to existing motion picture theater, including conversion of 2 theaters into 4 theaters, occupy per plan. Applicant: Pirscher, Carl | Permit type: Construction | Permit status: Permit issued | Expiration date: March 15, 2018 | Current use: Commercial | Permit id: 6512858 | |||||
SCORE 95 701 Pike St Seattle Wa Construct interior alterations to existing office space, floor 19, per floor plans, subject to field inspection (stfi). Applicant: Weyand, Tim | Permit type: Construction | Permit status: Permit closed | Completion date: April 1, 2009 | Expiration date: August 20, 2010 | Current use: Commercial | Permit id: 6208868 | |||||
SCORE 95 1601 3rd Ave Seattle Wa Tenant improvements including mezzanine addition for columbia sportswear and mountain hardware and occupy per plan. Applicant: Bartholomew, Thomas | Permit type: Construction | Permit status: Permit finaled | Completion date: November 26, 2008 | Expiration date: January 17, 2010 | Current use: Commercial | Permit id: 6172716 | |||||
SCORE 95 Applicant: Mcallister, Greg | Permit type: Construction | Permit status: Permit closed | Completion date: July 24, 2008 | Expiration date: November 14, 2009 | Current use: Commercial | Permit id: 6174767 | |||||
SCORE 95 2301 5th Ave Seattle Wa Initial ti to construct office space on majority of 5th floor (approximately 20,0 sq, ft. Except 5,0 sq. Ft. Located in the northwest corner) and occupy per plans. Applicant: Belcher, Craig | Permit type: Construction | Permit status: Permit closed | Completion date: August 13, 2007 | Expiration date: November 30, 2008 | Current use: Commercial | Permit id: 6135559 | |||||
SCORE 95 4326 University Way Ne Seattle Wa Interior alterations to existing retail building (university book store) on 2nd and 3rd floors, structural headers included, all per plans. Inspector authorized permit, Applicant: Mueller, Gary | Permit type: Construction | Permit status: Permit closed | Completion date: October 3, 2007 | Expiration date: October 25, 2008 | Current use: Commercial | Permit id: 6134938 | |||||
SCORE 95 Applicant: Jaschek, Derek | Permit type: Mechanical | Permit status: Permit closed | Completion date: April 1, 2009 | Expiration date: August 20, 2010 | Current use: Commercial | Permit id: 6208873 | |||||
SCORE 95 Date: August 13, 2002 Contractor: Swinerton Builders Applicant: Swinerton Builders | Permit type: Boiler / pressure vessel | Permit status: Permit finaled | Completion date: October 31, 2002 | Expiration date: February 13, 2004 | Current use: Institutional | Permit id: 6002365 | |||||
SCORE 95 Date: September 13, 2005 Contractor: Swinerton Builders Engineer: Onyx Architects | Applicant: Onyx Architects | Permit status: Finaled | Completion date: October 23, 2006 | Expiration date: March 12, 2006 | Permit id: 505030002 | |||||
SCORE 95 Engineer: Stdr Architects | Applicant: Raey Nina | Permit status: Finaled | Completion date: March 22, 2006 | Expiration date: September 5, 2006 | Permit id: 509210005 | |||||
SCORE 95 Date: February 7, 2006 Contractor: Swinerton Builders Engineer: Onyx Architects, Inc. | Applicant: Mand Ken | Permit status: Finaled | Completion date: October 23, 2006 | Expiration date: August 6, 2006 | Permit id: 602070042 | |||||
SCORE 95 Date: February 9, 2006 Contractor: Swinerton Builders Applicant: Rhonda Robinson | Permit status: Finaled | Completion date: November 22, 2011 | Expiration date: August 8, 2006 | Permit id: 507070006 | |||||
SCORE 95 Date: February 9, 2006 Contractor: Swinerton Builders Applicant: Rhonda Robinson | Permit status: Finaled | Completion date: November 22, 2011 | Expiration date: August 8, 2006 | Permit id: 507070007 | |||||
SCORE 95 Date: September 13, 2005 Contractor: Swinerton Builders Engineer: Onyx Architects | Applicant: Onyx Architects | Permit status: Permisud | Expiration date: March 12, 2006 | Permit id: 508040025 | |||||
SCORE 95 Date: March 2, 2006 Contractor: Swinerton Builders Engineer: Lester Paley | Applicant: Sarin Suket | Permit status: Finaled | Completion date: June 29, 2006 | Expiration date: August 29, 2006 | Permit id: 603020024 | |||||
SCORE 95 Date: February 16, 2006 Contractor: Swinerton Builders Engineer: Onyx Architects, Inc. | Applicant: Dnyx Architects, Inc | Permit status: Finaled | Completion date: June 29, 2006 | Expiration date: August 15, 2006 | Permit id: 602160009 | |||||
SCORE 95 Date: February 16, 2006 Contractor: Swinerton Builders Engineer: Onyx Architects | Applicant: Onyx Architects | Permit status: Finaled | Completion date: March 22, 2006 | Expiration date: August 15, 2006 | Permit id: 602160010 | |||||
SCORE 95 Engineer: Onyx Architects | Applicant: Onyx Architects | Permit status: Finaled | Completion date: March 22, 2006 | Expiration date: September 7, 2006 | Permit id: 501100009 | |||||
SCORE 95 Engineer: Lester Paley | Applicant: Paley Lester | Permit status: Finaled | Completion date: June 29, 2006 | Expiration date: November 30, 2006 | Permit id: 506130081 | |||||
SCORE 95 Engineer: Onyx Architects | Applicant: Onyx Architects | Permit status: Finaled | Completion date: January 4, 2006 | Expiration date: July 30, 2006 | Permit id: 508040077 | |||||
SCORE 95 Engineer: Onyx Architects, Inc. | Applicant: Dnyx Architects, Inc | Permit status: Finaled | Completion date: January 31, 2006 | Expiration date: July 30, 2006 | Permit id: 508040079 | |||||
SCORE 95 Applicant: Ken Mand | Permit status: Finaled | Completion date: June 29, 2006 | Expiration date: February 8, 2007 | Permit id: 602130072 | |||||
SCORE 95 Applicant: Ken Mand | Permit status: Finaled | Completion date: March 22, 2006 | Expiration date: February 8, 2007 | Permit id: 602130073 | |||||
SCORE 95 1st & 2nd / 5105 Goldleaf Cr Los Angeles Ca Tenant improvements - 1st flr expansion & remodeling;2nd flr office addition Engineer: Tetra Design Inc. | Applicant: Mario Manansala | Permit status: Finaled | Completion date: September 29, 2006 | Expiration date: July 30, 2007 | Permit id: 607250031 | |||||
SCORE 95 Engineer: Gmpa Architects, Inc. | Applicant: Gmpa Architects - Robert Wehrli | Permit status: Finaled | Completion date: May 14, 2009 | Expiration date: March 31, 2009 | Permit id: 805060009 | |||||
SCORE 95 Engineer: Gmpa Architects, Inc. | Applicant: Gmpa Architects - Robert Wehrli | Permit status: Finaled | Completion date: May 14, 2009 | Expiration date: March 31, 2009 | Permit id: 805060010 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Patel Mike | Permit status: Permisud | Expiration date: March 21, 2013 | Permit id: 1109270067 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Patel Mike | Permit status: Permisud | Expiration date: March 21, 2013 | Permit id: 1109270068 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1111080092 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1111080093 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1111080094 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Patel Mike | Permit status: Permisud | Expiration date: March 21, 2013 | Permit id: 1203210016 | |||||
SCORE 95 Engineer: Mcallister, Lionakis | Applicant: Patel Mike | Permit status: Permisud | Expiration date: March 21, 2013 | Permit id: 1203210019 | |||||
SCORE 95 335 Avenue I Lancaster Ca Foundation & framing for new multi-service ambulatory clinic building. Building hd macc Engineer: Mcallister, Lionakis | Applicant: Patel Mike | Permit status: Permisud | Expiration date: March 21, 2013 | Permit id: 1203210020 | |||||
SCORE 95 Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503120065 | |||||
SCORE 95 Applicant: Steven La | Permit status: Permisud | Expiration date: August 17, 2016 | Permit id: 1508180075 | |||||
SCORE 95 Applicant: Steven La | Permit status: Permisud | Expiration date: August 31, 2016 | Permit id: 1508260062 | |||||
SCORE 95 50 Avenue M 2 Quartz Hill Ca 25. 77 kw solar pv system for quartz hill public library. Plans reviewed as part of el1503310041 Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1504070009 | |||||
SCORE 95 Date: August 20, 2015 Contractor: Swinerton Builders Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503310041 | |||||
SCORE 95 Date: February 13, 2012 Contractor: Swinerton Builders Applicant: Terry Gee | Permit status: Permisud | Expiration date: February 12, 2013 | Permit id: 1109270003 | |||||
SCORE 95 Date: August 7, 2012 Contractor: Swinerton Builders Applicant: Jeffrey Hao Wuo | Permit status: Permisud | Expiration date: August 7, 2013 | Permit id: 1208070002 | |||||
SCORE 95 50 Avenue M 2 Quartz Hill Ca 1135 c. Y. Rough grading only for 12,5 sq ft library & community meeting room. Date: July 16, 2015 Contractor: Swinerton Builders Engineer: Vca Engineers, Inc. | Applicant: Mike Monosky | Permit status: Permisud | Expiration date: July 15, 2016 | Permit id: 1410220006 | |||||
SCORE 95 Date: September 1, 2015 Contractor: Swinerton Builders Engineer: Vca Engineers, Inc. | Applicant: Mike Monosky | Permit status: Permisud | Expiration date: August 31, 2016 | Permit id: 1507130003 | |||||
SCORE 95 Date: November 19, 2015 Contractor: Swinerton Builders Engineer: Vca Engineers, Inc. | Applicant: Steven La | Permit status: Permisud | Expiration date: November 18, 2016 | Permit id: 1511190005 | |||||
SCORE 95 Date: April 9, 2012 Contractor: Swinerton Builders Applicant: Wuo, Jeff Jason | Permit status: Permisud | Expiration date: April 9, 2013 | Permit id: 1204090020 | |||||
SCORE 95 335 Avenue I Lancaster Ca Mechanical for new multi-ambulatory care center, central utility plant, materials management building & craft bldg. Date: July 25, 2012 Contractor: Swinerton Builders Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1207250032 | |||||
SCORE 95 Date: July 25, 2012 Contractor: Swinerton Builders Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1207250033 | |||||
SCORE 95 Date: July 25, 2012 Contractor: Swinerton Builders Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1207250034 | |||||
SCORE 95 Date: August 20, 2015 Contractor: Swinerton Builders Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503120023 | |||||
SCORE 95 Date: April 9, 2012 Contractor: Swinerton Builders Applicant: Wuo, Jeff | Permit status: Permisud | Expiration date: April 9, 2013 | Permit id: 1204090030 | |||||
SCORE 95 Date: July 25, 2012 Contractor: Swinerton Builders Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1207250040 | |||||
SCORE 95 Date: July 25, 2012 Contractor: Swinerton Builders Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1207250042 | |||||
SCORE 95 Date: July 25, 2012 Contractor: Swinerton Builders Engineer: Mcallister, Lionakis | Applicant: Jeffery Hao Wuo | Permit status: Permisud | Expiration date: July 25, 2013 | Permit id: 1207250043 | |||||
SCORE 95 Date: August 20, 2015 Contractor: Swinerton Builders Engineer: Sva Architects, Inc. | Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503310010 | |||||
SCORE 95 Date: December 22, 2015 Contractor: Swinerton Builders Engineer: Sva Architects, Inc. | Applicant: Steven La | Permit status: Permisud | Expiration date: December 21, 2016 | Permit id: 1512220004 | |||||
SCORE 95 Date: February 8, 2016 Contractor: Swinerton Builders Permit type: Plumbing permit | Permit status: Issued | Permit id: Pp20160208726 | |||||
SCORE 95 Date: April 12, 2016 Contractor: Swinerton Builders Permit type: Revision-building permit | Permit status: Completed | Permit id: 16rev-00233 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11-3273:vmware, building hta: revision is created to replace set of plans dated 12-23-2011. New sets have been reviewed and approved by utilities department. Includes sheets ts1. 0/ts2. 0/c1. 0/cd1. 0/sw1 Date: February 10, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00079 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 New 2-story office building cse, with 85,013 sf (to be 904 arastradero rd. U&o sent 6/12/14 Date: July 25, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01801 | |||||
SCORE 95 Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503120065 | |||||
SCORE 95 Applicant: Steven La | Permit status: Permisud | Expiration date: August 17, 2016 | Permit id: 1508180075 | |||||
SCORE 95 Applicant: Steven La | Permit status: Permisud | Expiration date: August 31, 2016 | Permit id: 1508260062 | |||||
SCORE 95 50 Avenue M2 Quartz Hill Ca 25. 77 kw solar pv system for quartz hill public library. Plans reviewed as part of el1503310041 Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1504070009 | |||||
SCORE 95 Date: August 20, 2015 Contractor: Swinerton Builders Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503310041 | |||||
SCORE 95 50 Avenue M2 Quartz Hill Ca 1135 c. Y. Rough grading only for 12,5 sq ft library & community meeting room. Date: July 16, 2015 Contractor: Swinerton Builders Engineer: Vca Engineers, Inc. | Applicant: Mike Monosky | Permit status: Permisud | Expiration date: July 15, 2016 | Permit id: 1410220006 | |||||
SCORE 95 Date: September 1, 2015 Contractor: Swinerton Builders Engineer: Vca Engineers, Inc. | Applicant: Mike Monosky | Permit status: Permisud | Expiration date: August 31, 2016 | Permit id: 1507130003 | |||||
SCORE 95 Date: November 19, 2015 Contractor: Swinerton Builders Engineer: Vca Engineers, Inc. | Applicant: Steven La | Permit status: Permisud | Expiration date: November 18, 2016 | Permit id: 1511190005 | |||||
SCORE 95 Date: August 20, 2015 Contractor: Swinerton Builders Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503120023 | |||||
SCORE 95 Date: August 20, 2015 Contractor: Swinerton Builders Engineer: Sva Architects, Inc. | Applicant: Steven La | Permit status: Permisud | Expiration date: August 19, 2016 | Permit id: 1503310010 | |||||
SCORE 95 Date: December 22, 2015 Contractor: Swinerton Builders Engineer: Sva Architects, Inc. | Applicant: Steven La | Permit status: Permisud | Expiration date: December 21, 2016 | Permit id: 1512220004 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 11-3274: revision is created to replace set of plans dated 12-23-2011. New sets have been reviewed and approved by utilities department. Includes sheets ts1. 0/ts2. 0/c1. 0/cd1. 0/sw1 Date: February 10, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00078 | |||||
SCORE 95 2525 28th St Boulder Co Google-tenant remodel to create new office spaces and large break room. Scope includes associated mepfoots. Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 16, 2016 | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-00497 | |||||
SCORE 95 Date: March 1, 2016 Contractor: Swinerton Builders Permit type: Demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2016-00890 | |||||
SCORE 95 53 Airport Bl Boulder Co 1st floor (suite 100) remodel project to remove raised floor system, mechanical and electrical equipment from former tenant cisco systems including back-up genrator and power systems and air condioning units, in preparation for landlord inchwhite boxinch proposed in separate permit pmt2016-01488. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-01549 | |||||
SCORE 95 54 Airport Bl Boulder Co Tenant remodel of third floor, suite 300, for netapp (use installed through pmt2014-00771), including installation of non-bearing walls and rooftop platform and mechanical screening, mechanical work including new condensers on roof, 3rd floor split cooling system; electrical including power distribution panels, transformers and distribution bussway for increased electrical load. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Iss | Current use: Office - technical, tenant remodel | Permit id: Pmt2016-01635 | |||||
SCORE 95 1023 Walnut St 2 Boulder Co First time office space t. I. For third floor. Scope of work includes associated meps. Client: Eleven Ten | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - professional, tenant finish | Permit id: Pmt2016-01994 | |||||
SCORE 95 1048 Pearl St Boulder Co 2nd and 3rd floor first-time ti finish for a new office (solidfire netapp). Scope of work includes associated meps. Client: Eleven Ten | Permit type: Building, electrical, mechanical, plumbing | Permit status: Co | Current use: Office - administrative, tenant finish | Permit id: Pmt2016-01999 | |||||
SCORE 95 54 Airport Bl Boulder Co Suite 300: interior non-structural demolition in preparation for tenant interior remodel under pmt2016-01635. Date: May 26, 2016 Contractor: Swinerton Builders Client: Highpoint | Permit type: Demolition | Permit status: Iss | Current use: Office - technical, existing | Permit id: Pmt2016-02411 | |||||
SCORE 95 1048 Pearl St Boulder Co 2nd floor interior ti to expand and office to create an open office and conference rooms. Scope of work includes associated mes (no plumbing work). Client: Eleven Ten | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: November 17, 2016 | Current use: Office - professional, tenant finish | Permit id: Pmt2016-03054 | |||||
SCORE 95 16 Pearl St Boulder Co Phase i -- tenant remodel of western portion of second floor for offices for inchsolidfireinch. Scope of work includes adjustment of interior non-bearing walls, installation of 4 accessible showers, associated electrical, mechanical and plumbing work. Phase ii work by separate review and separate permit at a later date. Client: Pearl | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 6, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2013-07043 | |||||
SCORE 95 16 Pearl St Boulder Co Phase ii of project. Renovation of existing office space. The work shall consist of the removal of open space ceilings, remodel of lighting, and removal and reinstallation of hvac dustwork.. Includes new finishes. Client: Pearl | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: May 22, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-01241 | |||||
SCORE 95 5665 Flatiron Py Boulder Co Tenant remodel of two floors of office suite. Scope includes remodel of offices, server room, storage and admin. Rooms, relocation of partition walls, remodel of bathrooms, and associated mepfoots. Suite 100 Client: Flatiron | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 11, 2014 | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-01244 | |||||
SCORE 95 25 Pearl St Boulder Co Tenant interior remodel of google office space, scope includes creating larger open office space to portion of the suite and work to lobby and breakroom. Client: Llc Bluebell | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-03823 | |||||
SCORE 95 2525 28th St Boulder Co Reconfiguration of interior walls primarily at break room and reception areas. Includes related minor plumbing, electrical and reconfiguration of hvac ductwork. - additional mechanical and electrical scope - submitted 3 12 15 Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: June 15, 2015 | Current use: Office - professional, tenant remodel | Permit id: Pmt2014-03824 | |||||
SCORE 95 1738 Pearl St Boulder Co Tenant interior finish in the now empty second floor of a new building. Scope will include installation of offices, conference space, and breakroom with associated mepfoots. Client: Pearl | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: August 25, 2015 | Current use: Office - professional, tenant finish | Permit id: Pmt2015-01076 | |||||
SCORE 95 53 Airport Bl Boulder Co Tenant interior remodel to common office and break space for it r & d company. Client: Highpoint | Permit type: Building, electrical, mechanical | Permit status: Cmp | Completion date: July 28, 2016 | Current use: Office - technical, tenant remodel | Permit id: Pmt2015-03199 | |||||
SCORE 95 25 Pearl St Boulder Co Google-tenant remodel of break area cafe on the second floor. Includes mechanical, electrical, and plumbing. Client: Llc Bluebell | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: December 9, 2015 | Current use: Office - professional, tenant remodel | Permit id: Pmt2015-03949 | |||||
SCORE 95 422 Yale Ave N Seattle Wa Install 1 non-illum wall sign & 1 non-illum awning sign for "cafe torino inc" Date: October 11, 2012 Contractor: Swinerton Builders Applicant: Swinerton Builders | Permit type: Sign/billboard/awning | Permit status: Permit closed | Completion date: November 14, 2012 | Expiration date: April 11, 2014 | Current use: Commercial | Permit id: 6336837 | |||||
SCORE 95 3421 Hillview Av, Palo Alto, Ca 94304 Vmware: building hta, new roof well for relocated chiller. Relocation of (2) boilers to (e)basement mechanical room. U&o sent 10/15/13 Date: February 24, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00431 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 (ref permit #11-3279) phase 2a, site improvements revisions bulletin 8: changes to trash/ transformer enclosure yard, new access driveway, minor grading and utility changes, revised concrete wall details, electrical vault added.(p2a-si-rev8) Date: November 20, 2012 Contractor: Swinerton Builders Permit type: Building/revision/revision/revision | Permit status: Permit issued | Permit id: 12rev-00646 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 Vmware: u&o and ti for project p2b-hte-ti: bldg hte tenant improvements and exterior renovation of existing building. U&o sent 12/30/13 Date: March 16, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-00596 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 New 2-story office building csf, 84,721 sf (to be 906 arastradero rd). U&o sent 8/14/15 Date: July 25, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01799 | |||||
SCORE 95 245 Lytton Av, Palo Alto, Ca 94301 T. I. And u&o for "city national bank" (2672 sf), suite 175: remodel of office space, new non-structural partitions. U&o sent 2/12/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01578 | |||||
SCORE 95 245 Lytton Av, Palo Alto, Ca 94301 T. I. And u&o for "city national bank" (2295 sf), suite 100: interior partitions, ceilings and new exterior walk up atm, ab244 lighting. U&o sent 2/12/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-01577 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 New 2-story office building htb with 85,773 sf (to be 3419 hillview ave). U&o sent 5/13/14 Date: July 24, 2012 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 12000-01784 | |||||
SCORE 95 499 Hamilton Av, Palo Alto, Ca 94301 U&o and office tenant improvement for "verizon". Firm to occupy ~15000sf on (2) floors. Project includes electric service upgrade to 8 amps from 6 amps. U&o sent 4/14/14 Date: March 8, 2013 Contractor: Swinerton Builders Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-00652 | |||||
SCORE 95 A / 455 Portage Av, Unit A, Palo Alto, Ca 94306 U&o and t. I for samsung palo alto approx 55 sq ft all interior work, includes new rooftop hvac unit, upgrade of accessible toilets u&o sent 4/14/14 Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03231 | |||||
SCORE 95 Unit 203 / 3251 Hanover St, Unit 203, Palo Alto, Ca 94304 Existing firm "lock heed martin" tenent improvement ~5000sf. Includes relocation of workshop and construction of new fenced mechanical / service yard. New freight container yard at b202 lower. (concurrent arb) Permit type: Project - building permit | Permit status: Permit issued | Permit id: 13000-03292 | |||||
SCORE 95 Client: Highpoint | Permit type: Building, mechanical | Permit status: Cmp | Completion date: May 5, 2017 | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-00294 | |||||
SCORE 95 3333 Walnut St Boulder Co Tenant interior remodel for an existing technical office space to create new office space, conference areas, kitchen, reception and break areas. Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: May 4, 2017 | Current use: Office - technical, tenant remodel | Permit id: Pmt2017-00325 | |||||
SCORE 95 3333 Walnut St Boulder Co Demolition permit to perform non-structural, interior demolition in association with pmt2017-00325. Date: February 1, 2017 Contractor: Swinerton Builders Permit type: Demolition | Permit status: Cmp | Completion date: March 20, 2017 | Current use: Office - technical, existing | Permit id: Pmt2017-00352 | |||||
SCORE 95 5665 Flatiron Py Boulder Co Interior non-structural demolition of office suite finishes in preparation for tenant remodel pmt2014-01244. Contractor: Swinerton Builders Client: Flatiron | Permit type: Demolition | Permit status: N&v | Current use: Office - professional, existing | Permit id: Pmt2014-01245 | |||||
SCORE 95 29 Pearl St Boulder Co Interior tenant finish of floors 1, 3, and 4 of buildings a and b (interconnected), with limited scope of work on level 2, as office space and internal work campus that includes gym space, locker rooms, climbing wall, kitchens and micro-kitchens. Scope includes associated mep. Plan set has two volumes. Previous core and shell under one permit. Resubmittal on 8 14 17 to address electrical, water heater, and architectural changes. Resubmittal on 9 8 17 updates to electrical one-line drawings Client: Inc Google | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - technical, tenant finish | Permit id: Pmt2016-04184 | |||||
SCORE 95 29 Pearl St Boulder Co First time tenant finish - scope of work is for level 2a and 2b for google, work includes office space rooms restrooms and offices (two buildings connected by a walkway - under one permit for previous tenant finish, pmt2016-04184). Resubmittal on 8 14 17 to add hot water dispensers, changes to lighting, and architectural changes. Client: Inc Google | Permit type: Building, electrical, mechanical, plumbing | Permit status: Iss | Current use: Office - professional, tenant finish | Permit id: Pmt2017-00722 | |||||
SCORE 95 1023 Walnut St Boulder Co Permit for replacement of an existing half height swing gate with a full height gate for additional security for an exterior patio connecting to an exterior stairway on a commercial mixed use building. See his2017-0051 and adr2017-00058 for previous approvals. Client: Eleven Ten | Permit type: Electrical, fence | Permit status: Iss | Current use: Office - professional, existing | Permit id: Pmt2017-02997 | |||||
SCORE 95 1738 Pearl St Boulder Co Suite 200: construction of a concerence room in an open office space for netapp Value: $82,152 Contractor: Swinerton Builders Client: Pearl | Permit type: Building, electrical, mechanical | Permit status: Act | Current use: Office - professional, tenant remodel | Permit id: Pmt2017-04457 | |||||
SCORE 95 1001 Alaskan Way Seattle Wa Mechanical hvac equipment and ductwork, including (2) type 1 commercial kitchen hoods, to occupy restaurant, per plans Applicant: Smith, Justin | Permit type: Mechanical | Permit status: Permit issued | Expiration date: November 19, 2018 | Current use: Commercial | Permit id: 6579268 | |||||
SCORE 95 1601 5th Ave Seattle Wa Relocate existing vav terminal units, add three exhaust fans, relocate one wshp and add two wshps. Contractor: Swinerton Builders Applicant: Vollmoeller, Scott | Permit type: Mechanical | Current use: Commercial | Permit id: 6430115 | |||||
SCORE 95 1275 Mercer St Seattle Wa Interior demolition of non-structural partitions on 2nd (main) floor and mezzanine, subject to field inspection (change of use / change of occupancy under permit 6221307) Applicant: Furukawa, Arthur | Permit type: Construction | Permit status: Permit closed | Completion date: April 19, 2010 | Expiration date: August 24, 2011 | Current use: Commercial | Permit id: 6241544 | |||||
SCORE 95 74 Sand Point Way Ne Seattle Wa Cancel per customer log 13-867 tenant improvements in south end space of bldg. 11 at sandpoint to change use to daycare and accessory office, levels 1 and 2, with alterations to parking area for playground, per plans. Applicant: Vincent, Kate | Permit type: Construction | Permit status: Cancelled | Current use: Commercial | Permit id: 6283303 | |||||
SCORE 95 1124 Columbia St Seattle Wa Change of use from storage to physical therapy (medical services) and construct alterations for same on portion of p1 p2 level of the first hill medical pavilion, occupy per plans. Applicant: Rice, Scott | Permit type: Construction | Permit status: Permit closed | Completion date: September 5, 2017 | Expiration date: December 28, 2018 | Current use: Commercial | Permit id: 6572005 | |||||
SCORE 95 401 Dexter Ave N Seattle Wa Construct alterations to existing office building including window replacement, relocation of exterior door and interior alterations, per plan. Applicant: Knebel, Craig | Permit type: Construction | Permit status: Permit issued | Expiration date: June 1, 2019 | Current use: Commercial | Permit id: 6598758 | |||||
SCORE 95 333 Dexter Ave N Seattle Wa Shoring and excavation for future construction of an office and retail building with two connected office towers and below grade parking, per plan. Applicant: Patterson-Ohare, Jodi | Permit type: Construction | Permit status: Permit issued | Expiration date: November 4, 2018 | Current use: Commercial | Permit id: 6515960 | |||||
SCORE 95 1275 Mercer St Seattle Wa Change of use from office/retail to institutional daycare and substantial alterations to main floor of existing commercial building and adjacent exterior play ground for bright horizons child care center and occupy per plan. Mechanical included. Applicant: Furukawa, Arthur | Permit type: Construction | Permit status: Cert of occupancy authori | Completion date: August 10, 2010 | Expiration date: September 26, 2011 | Current use: Commercial | Permit id: 6221307 | |||||
SCORE 95 1201 9th Ave Seattle Wa Tenant improvements to the ground floor of the existing commercial building subject to field inspection (stfi). Applicant: Faust, Eric | Permit type: Construction | Permit status: Permit closed | Completion date: August 11, 2017 | Expiration date: October 10, 2018 | Current use: Commercial | Permit id: 6590921 | |||||
SCORE 95 401 Dexter Ave N Seattle Wa Tenant improvements to existing office building subject to field inspection (stfi). Applicant: Levy, Nicole | Permit type: Construction | Permit status: Permit closed | Completion date: October 6, 2017 | Expiration date: January 6, 2019 | Current use: Commercial | Permit id: 6606418 | |||||
SCORE 95 3 Dexter Ave N Seattle Wa Temporary use as construction offices and storage and temporary structure to locate 12 factory-constructed trailers on an existing parking lot, per plans. Date: October 6, 2017 Contractor: Swinerton Builders Applicant: Berry, Matthew | Permit type: Construction | Permit status: Application accepted | Current use: Commercial | Permit id: 6615934 | |||||
SCORE 95 Engineer: Behr Browers Architects | Applicant: Althaus Andrew | Permit status: Permisud | Expiration date: December 5, 2017 | Permit id: 1608150025 | |||||
SCORE 95 Date: November 3, 2016 Contractor: Swinerton Builders Engineer: Behr Browers Architects | Applicant: Althaus Andrew | Permit status: Permisud | Expiration date: November 3, 2017 | Permit id: 1610190026 | |||||
SCORE 95 Payson Lib / 24255 Pacific Coast Malibu Ca Remodel (e) 77,967sq ft 3-story library learning center w 654sf basement utility enclosure addition 1199sf attached trellis Engineer: Kim Caravalho Brandow And Johnston, Inc. | Applicant: Hutcherman David | Permit status: Permisud | Expiration date: August 11, 2017 | Permit id: 1601190082 | |||||
SCORE 95 Date: August 11, 2016 Contractor: Swinerton Builders Engineer: Kim Caravalho Brandow And Johnston, Inc. | Applicant: Hutcherman David | Permit status: Permisud | Expiration date: August 11, 2017 | Permit id: 1601190065 | |||||
SCORE 95 Payson Lib / 24255 Pacific Coast Malibu Ca Temporarily relocate elec items listed to accomodate (n) const (n) branch circuit will be removed when (n) central plant bldg constructed Date: September 6, 2016 Contractor: Swinerton Builders Engineer: Kim Caravalho Brandow And Johnston, Inc. | Applicant: Hutcherman David | Permit status: Permisud | Expiration date: September 6, 2017 | Permit id: 1609060014 | |||||
SCORE 95 Payson Lib / 24255 Pacific Coast Malibu Ca Mechanical for major renovation and remodel @ payson library Date: August 11, 2016 Contractor: Swinerton Builders Engineer: Kim Caravalho Brandow And Johnston, Inc. | Applicant: Hutcherman David | Permit status: Permisud | Expiration date: August 11, 2017 | Permit id: 1601190028 | |||||
SCORE 95 Payson Lib / 24255 Pacific Coast Malibu Ca Plumbing for major renovation and remodel @ payson library Date: August 11, 2016 Contractor: Swinerton Builders Engineer: Kim Caravalho Brandow And Johnston, Inc. | Applicant: Hutcherman David | Permit status: Permisud | Expiration date: August 11, 2017 | Permit id: 1601190039 | |||||
SCORE 95 22 Lincoln Av Altadena Ca New 370 sf. One story market w/ two attached commercial buildings, that consists of 7 sf & 788 sf. Engineer: Onyx Architects, Inc. | Applicant: Dnyx Architects, Inc | Permit status: Finaled | Completion date: June 29, 2006 | Expiration date: September 7, 2006 | Permit id: 412020062 | |||||
SCORE 95 Date: September 13, 2005 Contractor: Swinerton Builders Engineer: Onyx Architects | Applicant: Onyx Architects | Permit status: Permisud | Expiration date: March 12, 2006 | Permit id: 505030001 | |||||
SCORE 95 2226 Lincoln Av Altadena Ca Owner/contractors risk to install (2) grease interceptors w/o environmental programs approval. No piping allowed. Date: February 9, 2006 Contractor: Swinerton Builders Engineer: Onyx Architects, Inc. | Applicant: Mand Ken | Permit status: Finaled | Completion date: October 23, 2006 | Expiration date: August 8, 2006 | Permit id: 602090016 | |||||
SCORE 95 Date: December 10, 2013 Contractor: Swinerton Builders Engineer: N, A | Applicant: Swinerton Builders | Permit status: Finaled | Completion date: December 31, 2013 | Expiration date: December 10, 2014 | Permit id: 1312100004 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca New 2-story office building cse, with 85,013 sf (to be 904 arastradero rd. U&o sent 6 12 14 Date: July 25, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01801 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca New 2-story office building htb with 85,773 sf (to be 3419 hillview ave). U&o sent 5 13 14 Date: July 24, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01784 | |||||
SCORE 95 Unit 203 / 3251 Hanover St, Unit 203, Palo Alto, Ca 94304 San Diego Ca Existing firm "lock heed martin" tenent improvement ~5000sf. Includes relocation of workshop and construction of new fenced mechanical service yard. New freight container yard at b202 lower. (concurrent arb) Permit status: Permit issued | Permit id: 13000-03292 | |||||
SCORE 95 499 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca U&o and office tenant improvement for "verizon". Firm to occupy ~15000sf on (2) floors. Project includes electric service upgrade to 8 amps from 6 amps. U&o sent 4 14 14 Date: March 8, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00652 | |||||
SCORE 95 A / 455 Portage Av, Unit A, Palo Alto, Ca 94306 San Diego Ca U&o and t. I for samsung palo alto approx 55 sq ft all interior work, includes new rooftop hvac unit, upgrade of accessible toilets u&o sent 4 14 14 Permit status: Permit issued | Permit id: 13000-03231 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Site improvements to include landscaping, grading, utility routing, lighting, surface parking, fountains, retaining walls, hardscape improvements. Date: June 26, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01505 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 San Diego Ca 12000-01778: deferred submittal for plumbing seismic restraints Date: February 25, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00115 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01799: deferred submittal for plumbing seismic restraint Date: February 25, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00114 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01801: deferred submittal for plumbing seismic restraint Date: February 25, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00116 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-01784: deferred submittal--plumbing seismic restraint for building htb Date: February 25, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00113 | |||||
SCORE 95 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca T. I. And u&o for "city national bank" (2672 sf), suite 175: remodel of office space, new non-structural partitions. U&o sent 2 12 14 Permit status: Permit issued | Permit id: 13000-01578 | |||||
SCORE 95 245 Lytton Av, Palo Alto, Ca 94301 San Diego Ca T. I. And u&o for "city national bank" (2295 sf), suite 100: interior partitions, ceilings and new exterior walk up atm, ab244 lighting. U&o sent 2 12 14 Permit status: Permit issued | Permit id: 13000-01577 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Install (15) level 2 evse vehicle chargers in parking garage #3 Date: January 17, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14000-00174 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Install (16) level 2 evse vehicle charging stations in parking garage #1 Date: January 17, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14000-00173 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01813: deferred submittal for greenscreen for pg3 Date: January 3, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00006 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-01817: deferred submittal for "greenscreen" on pg1 Date: January 3, 2014 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 14rev-00005 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12-1813: deferred exterior framing for light gauge. Date: December 13, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00775 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Vmware: u&o and ti for project p2b-hte-ti: bldg hte tenant improvements and exterior renovation of existing building. U&o sent 12 30 13 Date: March 16, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00596 | |||||
SCORE 95 345 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca At&t: remodel for (e) tenant on the fourth floor. (2141 sf) Permit status: Permit issued | Permit id: 13000-03396 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-00596: new roofing and waterproofing at penthouse roof in conjunction with work by others under separate permit 12000-03027 consisting of pv panel relocation. Delta 14 and delta 14r1 Date: December 19, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00784 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-01817: deferred submittal for parking garage 1 Date: October 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00607 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01813: revision, deferred submittal for stairs in parking garage 3 Date: October 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00608 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-01817: deferred submittal for new elevator shaft Date: November 21, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00728 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01505: revise pathway connection at htb east entrance site bulletin 18, delta 19 Date: November 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00702 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (12000-00596) accessability detail and directional signage changes. Date: November 19, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00720 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Temporary construction trailer: restroom trailer (288 sf). (three separate trailers each with own permit office a 13000-00098, office b 13000-00099) Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Bld - approved | Permit id: 13000-00100 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01505: changes to grading and drainage, extend rolled curb Date: October 15, 2013 Contractor: Swinerton Builders Permit status: Completed | Permit id: 13rev-00633 | |||||
SCORE 95 Date: October 24, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00661 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-00596: delta includes architectural, mechanical, electrical and plumbing changes and clarifications. No exterior work. Bulletin 8 Date: October 15, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00632 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca New 3-story commercial parking garage #pg1, 217,279 sf Date: July 26, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01817 | |||||
SCORE 95 Date: October 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00606 | |||||
SCORE 95 3421 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Revision includes steel stairs detail to boiler room. Date: September 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00565 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01505: revision to pg2 garage approach, sitework revision to accessible parking at htg Date: August 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00497 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11000-03276: revision to change entry gate at north end of garage. No changes to green screen Date: August 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00496 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-01256: revision to roof attachment for stanchions for pv structure (vmware project p2a-f-pv: installation of commercial pv panels on existing building prom-f) Date: July 31, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00489 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-596) revisions to bldg hte: provide seismic bracing details and locations for plumbing systems Date: July 3, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00426 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1817) revisions to vmware parking garage #1: relocated the electrical room to 1st floor and reconfigure parking layout accordingly. Bulletin 26, delta 28 plans. Date: July 3, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00425 | |||||
SCORE 95 499 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca 13-652: revise electrical plans to include switching with 6 amps service. Date: June 21, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00395 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1817) parking garage #1 deferred submittal for precast concrete wall panels Date: June 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00377 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1505) revisions to phase 3 site improvements: revise existing stairs with new stair additions. (bulletin 8, vmware file: p3-si-rev3) Date: May 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00329 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3128) revisions to bldg htd: add exterior exit signs Date: June 18, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00387 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) revisions to vmware bldg csf: detail changes to the exterior light gauge steel framing Date: June 17, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00386 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1813) vmware parking garage #3 deferred submittal for precast concrete wall panels Date: June 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00378 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-432) vmware parking garage #2 deferred submittal for exterior green screen Date: June 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00376 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12-1799: revisions to bldg csf, install accessible 2-way communications system at elevator. Bulletin #23 Date: May 31, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00359 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12-1801: revisions to bldg cse, install accessible 2-way communication at elevator. Bulletin 22 Date: May 31, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00358 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) bldg cse deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00354 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) bldg csf deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00355 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-1778) bldg csd, deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00352 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) bldg htb deferred submittal for curtain wall construction Date: May 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00353 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Install (13) electric vehicle charging station in parking garage structure. Date: May 24, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-01412 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) deferred submittal to bldg cse for metal stairs Date: May 23, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00345 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) deferred submittal to bldg csf for metal stairs Date: May 23, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00344 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Vmware: revisions to clarify and detail extent of firewall and revisions to firewall termination requirements 12000-00596: project p2b-hte-ti: bldg hte tenant improvements and exterior renovation of existing building. Date: May 13, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00322 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) revisions to vmware bldg htb: revise the exterior light gauge steel framing to support the building facade Date: May 8, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00312 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-1778) revisions to vmware bldg csd: revise exterior light gauge steel metal framing to support building facade. Date: May 8, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00310 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1813) revisions to parking garage pg3: exit sign locations, add two-way communications at elevator landings. Bulletin #21 Date: May 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00307 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1817) revisions to parking garage pg1: exit sign locations, add two-way communication system at elevator lobbies. Bulletin #20 Date: May 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00306 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) bldg htb deferred submittal for metal stairs Date: May 1, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00287 | |||||
SCORE 95 Date: May 1, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-01177 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Vmware building prom e, close-out one exit on first floor, add re-directional exit signs. Date: April 29, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-01151 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801):structural revisions to bldg cse for bulletin 17 Date: April 5, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00213 | |||||
SCORE 95 1 El Camino, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1078) revisions to the site utilities reroute for sewer alignment changes and electrical duct bank changes Date: April 25, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00267 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3276) phase 2 parking garage pg2 site revisions: new vehicular entry and driveway at north side of garage (site bulletin #4) p2a-pg2-si-rev2 Date: April 23, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00262 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11000-03279: phase 2 site improvement revision to relocate transformers per cpa requirements and revise secondary conduit. Date: April 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00241 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11000-03279: phase 2 site work revision to reclaimed water system Date: April 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00240 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) structural revisions to bldg csf for bulletin 18 Date: April 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00242 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) structural revisions to bldg htb for field conditions. Bulletin 16 Date: April 16, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00239 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3276)revisions to parking garage pg2 site improvements: relocate fire hydrant and new 4-way fdc and 6" fire line. Date: January 25, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00047 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-432) parking garage pg2 stair revisions per field conditions Date: March 26, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00186 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-432) revisions parking garage pg2 to top of cricket elevations, wall type at elevator, electrical room louver relocation, revised roof plan at elevator and misc details Date: February 22, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00108 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) bldg cse deferred submittal for roof trusses Date: April 8, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00219 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1813) parking garage pg3 revisions: revise top cricket elevations, electrical room wall rating, roof drains, exit light locations, light fixture locations, plumbing line layout, revise elevator shaft size for bulletin 15. Date: April 5, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00216 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1817) parking garage pg1 bulletin 14 revisions: revise top of cricket elevations, electrical room wall rating,roof drains, exit lights locations, light fixture layout, plumbing layout changes. Date: April 5, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00214 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01505: added storm pipes (site bulletin #5) to pick up foundation wall base drain discharge pipe Date: April 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00207 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-00432: revision to pg2 parking layout, revised stair #2 at parking garage 2 Date: April 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00206 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11-3128: htd building revise mechanical vav at restrooms. Date: April 2, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00204 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3128) revisions to building htd (p2a-htd-rev7): revised casework to be handicap accessible, added handrails in auditorium aisles @ existing steps; added vav min design values; emergency power for handicap lift in auditorium Date: March 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00137 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11-3128: bldg htd (p2a-htd-rev6) exit sign removal. Bulletin 11 Date: February 1, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00055 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11-3128: bldg htd (p2a-htd-rev5), revisions to architectural, electrical and structural drawings. Bulletin 9 Date: January 17, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00024 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3128) revisions to bldg htd (p2a-htd-rev4): interior architectural, electrical, structural changes. Bulletin 8 Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00007 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3128) bldg htd, (p2a-htd-rev3) interior room changes including reloaction of lights, hvac diffusers, misc interior changes. Bulletin 7 Date: November 7, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00610 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3128)vmware project p2a-htd-rev2: minor facade changes, exterior ramp, interior room changes, restroom changes, lighting and misc hvac and plumbing changes. Bulletin 2 Date: June 6, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00312 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3128)vmware project# p2a-htd-rev1: new lobby building addition to bldg htd, bullletin 1 Date: June 6, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00309 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) phase 2a, site improvements revisions bulletin 8: changes to trash transformer enclosure yard, new access driveway, minor grading and utility changes, revised concrete wall details, electrical vault added.(p2a-si-rev8) Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00646 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 12000-01784: phase 3, bldg htb, bulletin 2, added drains and changed the size of the sanity sewer pipe within the campus from 4-inches to 6-inches (p3-htb-rev6). Date: March 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00195 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01801: phase 3, bldg cse, bulletin 2, added drains and changed the size of the sanity sewer pipe within the campus from 4-inches to 6-inches. (p3-cse-rev6) Date: March 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00197 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-01799: pahse 3, bldg csf, bulletin 2, added drains and changed the size of the sanity sewer pipe within the campus from 4-inches to 6-inches. (p3-csf-rev6) Date: March 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00196 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Vmware: building htd, relocation of the interconnection for the pv system. Date: January 22, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00233 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-1778) bldg csd revisions: kitchen equipment changes, center island change, dining room changes, associated electrical, lighting, mechanical, plumbing and ceiling changes. Health dept approval received 3-21-13. Date: February 21, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00102 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) revisions to bldg cse: interior floor plan changes and the associated electrical, lighting and data changes. Bulletin #8 Date: February 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00123 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) bldg htb deferred submittal for trus-joist floor and roof trusses Date: March 13, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00154 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-596) revisions to vmware bldg hte: relocation of (e) roof top cell equipment Date: March 19, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00165 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca New 2-story office building csf, 84,721 sf (to be 906 arastradero rd) Date: July 25, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01799 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 San Diego Ca New single-story commercial cafeteria building #csd with 15,036 sf. County health dept approval letter received 10-1-12 (see attachments). [deh #sr0839057 & sr0839058] Date: July 24, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01778 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-432) bldg parking garage pg2 deferred submittal for metal stairs #1 to 4. Date: March 18, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00163 | |||||
SCORE 95 499 Hamilton Av, Palo Alto, Ca 94301 San Diego Ca Interior non-structural demo in preparation for tenant improvement. Date: March 12, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00688 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-596) bldg hte revisions: roofing changes (bulletins 6 & 6r1) Date: March 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00139 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-596) revisions to bldg hte: interior architectural and electrical changes. Bulletin 5. Date: March 7, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00138 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) revisions to bldg csf: architectural floor plan changes and the associated lighting, power and data changes Date: February 28, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00122 | |||||
SCORE 95 902 Arastradero Rd, Palo Alto, Ca 94306 San Diego Ca (ref permit #12-1778) change storm drain size from 10" to 8" diameter. Date: February 26, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00117 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11000-03129: revise bldg htc plans to show additional exit signs per building inspector Date: February 15, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00094 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) interior furniture, cubicle layout changes and the associated power and data layout changes Date: February 11, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00082 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) bldg csf foundation change only Date: February 8, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00079 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1256) revisions to the pv roof anchorage Date: January 15, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00016 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Vmware: construction of a new three level parking garage, with partial basement Date: February 24, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00432 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-596) revisions to bldg hte: interior architectural, mechanical and electical changes. Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13rev-00008 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Temporary construction trailer: office trailer a (1914 sf). (three separate trailers each with own permit office b 13000-00099, restroom 13000-00100) Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00098 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Temporary construction trailer: office trailer b(792 sf). (three separate trailers each with own permit office a 13000-00098, restroom 13000-00100) Date: January 10, 2013 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 13000-00099 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11-3129: field revisions: revised exiting plan and added notes to exterior ramp. Date: December 21, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00713 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) bldg htb deferred submittal for structural brace frames Date: December 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00705 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) bldg csf deferred submittal for structural brace frames Date: December 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00708 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) bldg cse deferred submittal for structural brace frames Date: December 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00707 | |||||
SCORE 95 1 El Camino, Palo Alto, Ca 94304 San Diego Ca Site improvements including utility relocation in preparation for future projects. Date: May 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01078 | |||||
SCORE 95 Date: November 9, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00618 | |||||
SCORE 95 3419 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1784) building htb changes: deletion of sun shades, reduction in amount of operable windows, misc changes to hvac, electrical Date: December 4, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00667 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) building cse changes: deletion of exterior sun shades, reduction of operable windows, misc changes to mechanical and electrical. Date: December 4, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00666 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799)building csf exterior sun shade deletion, reduction in amount of operable windows, misc mechanical and electrical changes Date: December 4, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00665 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) building cse revisions bulletin 6: revision to foundation. Change to all piers. Date: November 27, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00654 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) site improvements revisions bulletin 7: exterior light fixtures added Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00647 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1505) site improvements revisions bulletin 2 to include msic civil, sewer, storm water, fire hydrant service line changes. Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00645 | |||||
SCORE 95 906 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1799) building csf revisions bulletin 3: structural brace frame change and misc concrete slab thickness info. Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00643 | |||||
SCORE 95 904 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-1801) bldg cse revisions bulletin 3: structural changes to brace frame and misc concrete slab thickness info. Date: November 20, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00642 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12000-00596: p2b-hte-ti: misc revisions; exit signs location, finishes, detail clarifications and associated mep items. Date: October 9, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00555 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12-596: soffit framing and grade beam clarification Date: November 9, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00616 | |||||
SCORE 95 Date: November 7, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00608 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Vmware: building htf, relocation of the interconnection for the pv system. Pv system was installed under permit 08-2664. Date: October 12, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-02575 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) material change to underground electrical piping elbows to pvc Date: November 7, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00607 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) shotcrete substitution for cast-in-place concrete site retaining walls Date: November 1, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00590 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca 12-00596: revision to revise the size of four (4) previously approved skylights. Skylights are getting smaller and are below the height of the parapet. Date: October 17, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00566 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Demolition of central plant building. Baaqmd application j#3u185 Date: September 11, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-02261 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Demolition of commercial building r-5, baaqmd application: j#3u185 Date: September 11, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-02258 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Demolition of commercial building r-4, baaqmd application: j#3u185 Date: September 11, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-02257 | |||||
SCORE 95 3421 Hillview Av, Palo Alto, Ca 94304 San Diego Ca New city secondary electrical transformer, service entrance switchboard. Exiting upgrade for electric room. Date: January 31, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00248 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) revisions to site retaining walls to accommodate permitted revisions to separate landscape permits. Date: August 29, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00489 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) revisions to site improvements for phase 2 to match landscape permit revision 12rev-447. Revisions to include raised sidewalks, area drains changes. Date: August 23, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00475 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-751) revisions to vmware phase 2 site improvements: minor material changes, scope changes to fountain, pavement and tree plantings. Date: August 13, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00447 | |||||
SCORE 95 3421 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-431) revision to show accessible route to bus stop from bldg hta, civil details for accessible parking shown under main permit Date: August 22, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00471 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3129) revisions to the main permit: deletion of proposed balcony, exterior finihs change in select areas, deltion of roof canopy panels in select areas, minor interior wall layout changes, minor lighting, hvac and plumbing changes. Date: August 22, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00470 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca New 4-story commercial parking garage #pg3, 230,504 sf (to be 9 arastradero rd) Date: July 26, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01813 | |||||
SCORE 95 3417 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Pedestrian bridge from parking garage #pg2 to site sidewalk Date: July 30, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01847 | |||||
SCORE 95 3409 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Vmware project p2a-f-pv: installation of commercial pv panels on existing building prom-f Date: May 31, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01256 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11-3127: building htf revision includes suspended ductwork system Date: July 17, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00396 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11000-03128: building htd, revision for duct support details Date: July 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00384 | |||||
SCORE 95 Date: July 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00383 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Install temporary diesel generator ~1200kva for temp power. Date: July 3, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01559 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca 11000-03127: deferred submittal for plastic sklylight calculations Date: June 27, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00361 | |||||
SCORE 95 Date: June 21, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00336 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3127) revise the accessible path of travel to existing building htf. Vmware project #p2a-htf-rev2. Date: June 13, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00323 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3127) revise interior wall layouts, wall demolition, ceiling changes, exterior sunshade changes, exterior wall finish change extent, waterproofing detail changes, misc. Electrical and new fall arrest system. Vmware project #p2a-htf-rev1. Date: May 16, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00268 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) revise site improvement plan to modify handicap accessible parking stalls to serve existing building htf. Vmware project p2a-si-rev3. Date: June 13, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00322 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit 12-432) vmware project p2a-pg2-rev2: deferrred submittal for structural details and calculations for pre-cast panels in the construction of a new three level parking garage, with partial basement Date: May 31, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00293 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Landscape and hardscape work to include concrete sidewalks and stairs Date: April 3, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-00751 | |||||
SCORE 95 9 Arastradero Rd, Palo Alto, Ca 94304 San Diego Ca Demolition of commercial building r-6 (135,0 sf). Ref j#3u185. Cheyenne vega from utilities confirmed that there are no individual city meters for bldg scs. Building inspector to confirm at pre-demo inpsection. Date: May 10, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01090 | |||||
SCORE 95 Date: May 14, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01116 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca Demolition of building scs, (approx 5575 sf) ref j#3u185. Cheyenne vega from utilities confirmed that there are no individual city meters for bldg scs. Building inspector to confirm at pre-demo meeting. Date: May 1, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12000-01007 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #12-432) change to redesign footings from spread footings to partial pier and grade beam Date: May 8, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00260 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref #11-3279) revisions to phase 2 site work: relocating electrical transformers and creating two transformer yards with enclosures, new loop road design from arastradero entry loop road to bldg htf and future garage 1. Date: May 1, 2012 Contractor: Swinerton Builders Permit status: Permit issued | Permit id: 12rev-00241 | |||||
SCORE 95 3431 Hillview Av, Palo Alto, Ca 94304 San Diego Ca (ref permit #11-3279) increased scope of work to include changes to the civil drawings and utilities to support the separate landscape permit (ref #12-751) in same area. Work includes new outdoor lighting standards and structural footing details for the fountain and site retaining walls. Date: April 12, 2012 Contractor: Swinerton Builders Permit status: Approved | Permit id: 12rev-00213 |