SCORE

WA ST DOT SR 5 BRIDGE REPLAC

ABOUT WA ST DOT SR 5 BRIDGE REPLAC

Wa St Dot Sr 5 Bridge Replac specializes in:

Wa St Dot Sr 5 Bridge Replac offers services:

Based on the information received from , associated with Wa St Dot Sr 5 Bridge Replac over the past .

If you are considering hiring Wa St Dot Sr 5 Bridge Replac for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Wa St Dot Sr 5 Bridge Replac has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
84
3681 Ne 41st St Seattle Wa
Grading of approx. 3. 22 acres for (wetland establishment, trail reconstruction, road removal) on u of wa property for wsdot sr 5 project, per plan.
Date:  February 3, 2015

Applicant: Berger, Chris | Permit type: Site development | Permit status: Permit issued | Current use: Commercial | Permit id: 6442610
2015/02/030843681 Ne 41st St Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
10034 Rainier Ave S Seattle Wa
Sr 5 replacement project - taylor creek mitigation site for west approach portion (project #3012587). Shoreline substantial development permit to enhance the channel, delta and adjacent riparian area of taylor creek. Project includes grading of 4,0 cu. Yds. Of material in an environmentally critical area. Feis prepared by washington state department of transportation (wsdot) and the federal highway administration. Future demolition of existing structures under separate permit.
Date:  August 16, 2011
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012595
2011/08/1618410034 Rainier Ave S Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
5898 Lake Washington Blvd S Seattle Wa
Sr 5 replacement project - seward park mitigation site for west approach portion (project #3012587). Shoreline substantial development permit to remove an existing bulkhead and enhance existing shoreline habitat in four areas of seward park. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  August 16, 2011
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline conditional use, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012594
2011/08/161845898 Lake Washington Blvd S Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
2950b Montlake Blvd E Seattle Wa
Sr 5 replacement project - montlake bridge portion. Shoreline substantial development permit to allow construction of a second draw bridge, 3 lanes wide, east of and parallel to the existing montlake bridge in an environmentally critical area. Work includes 6,929 cu. Yds. Of grading and new approaches on the north and south side of the montlake cut. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  August 16, 2011
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012586
2011/08/161842950b Montlake Blvd E Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
Unaddressable Seattle Wa
Sr 5 replacement project - wsdot peninsula mitigation site (adjacent to arboretum) for west approach portion (project #3012587). Shoreline substantial development permit to create 5. 3 acres of wetland, and to enhance 1. 3 acres of existing wetland and 2. 3 acres of wetland buffer in an environmentally critical area. Project includes grading of 28,2 cu. Yds. Of material. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  August 16, 2011
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline conditional use, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012593
2011/08/16184Unaddressable Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
74 Sand Point Way Ne Seattle Wa
Sr 5 replacement project - magnuson park mitigation site for portage bay bridge portion (project #3012585). Shoreline substantial development permit to allow enhancement of shoreline habitat and existing wetlands and creation of new wetlands in an environmentally critical area. Work includes grading of 18,608 cu. Yds. Of material, installation of native plant species, bulkhead removal, and associated work. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  August 16, 2011
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012591
2011/08/1618474 Sand Point Way Ne Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
2400b E Lake Washington Blvd Seattle Wa
Sr 5 replacement project - west approach portion (montlake to floating bridge). Shoreline substantial development permit to allow replacement of existing roadway and west approach to the floating bridge with 2 new structures a total of 6 lanes wide. Project includes a landscaped lid over a portion of the new roadway and development of a wetland for storm water treatment in an environmentally critical area. The overall height of the new bridge ranges from 21 to from the water line to the top of the railing. Construction includes temporary work bridges and grading of 154,916 cu. Yds. Of material and off-site mitigation. Mitigation site review under projects 3012592, 3012593, 3012594 and 3012595. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  March 25, 2014
Value:   $1

Applicant: Dobbins, Brian | Permit type: Sepa threshold determination, shoreline conditional use, shoreline development | Permit status: Permit issued | Current use: Institutional | Permit id: 3012587
2014/03/251842400b E Lake Washington Blvd Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
2548b Boyer Ave E Seattle Wa
Sr 5 replacement project - portage bay bridge portion. Shoreline substantial development permit to allow replacement of the existing portage bay bridge in an environmentally critical area. Proposed bridge will be 6 lanes with a height of 84 from the water line to the top of guardrail on the west end and a height of 27 from the water line to the top of guardrail on the east end, with a total length of 2,700. Work includes 50,341 cu. Yds. Of grading. Project includes construction of temporary work bridges and off-site mitigation. Mitigation site review under project 3012591. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  August 16, 2011
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012585
2011/08/161842548b Boyer Ave E Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
2430b 43rd Ave E Seattle Wa
Sr 5 replacement project - floating bridge (seattle portion) shoreline substantial development permit to allow replacement of the existing floating bridge in an environmentally critical area. Proposed bridge will be 6 lanes wide, measure 21 in height from the water line to the top of the railing, and be 3,7 feet in length in the city of seattle portion. Work includes 11,366 cu. Yds. Of grading. Project includes construction of a temporary 4 lane bridge. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  July 21, 2014
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline development | Permit status: Permit issued | Current use: Institutional | Permit id: 3011843
2014/07/211842430b 43rd Ave E Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
2400b E Lake Washington Blvd Seattle Wa
Shoreline exemption for exploratory geotechnical work in suppor tof 5 replacement.

Applicant: Berger, Chris | Permit type: Site development | Permit id: 6377881
0842400b E Lake Washington Blvd Seattle WaWa St Dot Sr 5 Bridge Replac
SCORE
84
3681 Ne 41st St Seattle Wa
Sr 5 replacement project - union bay natural area mitigation site for west approach portion (project #3012587). Shoreline substantial development permit to create 2. 6 acres of new wetland, enhance 9. 2 acres of existing wetland and enhance 8. 4 acres of native upland grassland and forest in an environmentally critical area. Project includes grading of 6,425 cu. Yds. Of material. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration.
Date:  March 11, 2015
Value:   $1

Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline conditional use, shoreline development | Permit status: Permit issued | Current use: Institutional | Permit id: 3012592
2015/03/111843681 Ne 41st St Seattle WaWa St Dot Sr 5 Bridge Replac
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.