Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Geotechnical boring at 11 locations in the shoreline environment of portage bay and montlake area within the sr 2 corridor. ![]() Applicant: Lamsek, Ann Marie | Permit type: Site development | Permit status: Ap closed | Permit id: 6450468 | |||||
Geotechnical boring at 11 locations in the shoreline environment of portage bay and montlake area within the sr 2 corridor. ![]() Applicant: Lamsek, Ann Marie | Permit type: Site development | Permit status: Ap closed | Permit id: 6450468 | |||||
SCORE 84 Sr 5 replacement project - portage bay bridge portion. Shoreline substantial development permit to allow replacement of the existing portage bay bridge in an environmentally critical area. Proposed bridge will be 6 lanes with a height of 84 from the water line to the top of guardrail on the west end and a height of 27 from the water line to the top of guardrail on the east end, with a total length of 2,700. Work includes 50,341 cu. Yds. Of grading. Project includes construction of temporary work bridges and off-site mitigation. Mitigation site review under project 3012591. Environmental documents prepared by washington state department of transportation (wsdot) and the federal highway administration. Applicant: Ruth, Kerry | Permit type: Sepa threshold determination, shoreline development | Permit status: Decision published | Current use: Institutional | Permit id: 3012585 |