Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 93 Date: May 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 22, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: May 7, 2013 Contractor: Utilities So Ca Edison Permit type: Pw - encroachment application | Permit status: Closed | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 9, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 3, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: March 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 19, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: December 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 3, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 2, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 20, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: March 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 19, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 24, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: July 1, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 30, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 31, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 5, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 10, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 10, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: February 26, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 22, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 5, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: May 13, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 16, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 26, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 15, 2016 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: January 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: May 16, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 20, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 5, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 19, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 2, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 26, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 5, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: February 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 13, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 26, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 8, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 22, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 5, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 20, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 7, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 5, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 5, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 24, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 9, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 30, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 5, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 3, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 9, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 1, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 2016-04602 / 701 Mandalay Beach Rd Oxnard, Ca 93035 Lane closure to replace (e)st light traffic contro Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 4, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 10, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: September 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: May 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 13, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 4, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: September 4, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 18, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 24, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 3, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 19, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 29, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 9, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 11, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: March 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 19, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: October 27, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 29, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 8, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: September 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 24, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 31, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 16, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 29, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 30, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 26, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 9, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 5, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: October 31, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 10, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 30, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 31, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 2016-05549 / 40 W Channel Islands Blvd Oxnard, Ca 93035 Traffic control for lane closure replace st light Date: October 20, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 19, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 21, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 19, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 9, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 8, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 21, 2016 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: September 8, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 16, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 4, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 18, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 9, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 7, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 19, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 19, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: November 29, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 19, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 19, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: February 3, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 13, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 7, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 22, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 17, 2013 Contractor: Utilities So Ca Edison Permit type: Pw - encroachment application | Permit status: Closed | |||||
SCORE 93 Date: May 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 8, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: April 10, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 5, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 8, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 7, 2013 Contractor: Utilities So Ca Edison Permit type: Pw - encroachment application | Permit status: Closed | |||||
SCORE 93 Date: April 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 7, 2013 Contractor: Utilities So Ca Edison Permit type: Pw - encroachment application | Permit status: Closed | |||||
SCORE 93 Date: July 24, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 5, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: February 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 5, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: October 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Traffic control to remove (e)poles Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: In plan check | |||||
SCORE 93 Date: April 20, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 10, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: December 21, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 5, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 8, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: September 30, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 31, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 16, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 13, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 24, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 10, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: December 21, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: In plan check | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 30, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 22, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 14, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 22, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: June 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 1, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 3, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: October 1, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 2, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 10, 2017 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 16, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 21, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 18, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: August 22, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 19, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 15, 2016 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: April 8, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 7, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 24, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 30, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 10, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 16, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2015 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: January 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 26, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: June 17, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 22, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 19, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: July 11, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 2, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 13, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: August 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 16, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: January 5, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 20, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 11, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: September 4, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 11, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: June 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 16, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 1, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 14, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 8, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 26, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 5, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 4, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 21, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 8, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 16, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 29, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 13, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: July 9, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 5, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: March 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: June 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 17, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 14, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 26, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 6, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 29, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 5, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 19, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 19, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: April 8, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 4, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 7, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 23, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: February 24, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 18, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 11, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 18, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 27, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 3, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: November 3, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 31, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 21, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: April 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: December 18, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 1, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 17, 2013 Contractor: Utilities So Ca Edison Permit type: Pw - encroachment application | Permit status: Closed | |||||
SCORE 93 Date: July 11, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 17, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 30, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: February 1, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 28, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 14, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 15, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: March 15, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 23, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 1, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 12, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: June 13, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: August 31, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: May 14, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 2, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: July 21, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 16, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 3, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: January 2, 2014 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: September 8, 2014 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: May 4, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: April 2, 2013 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Closed | |||||
SCORE 93 Date: March 12, 2015 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Date: October 20, 2016 Contractor: Utilities So Ca Edison Permit type: Pw utility encrochment permit | Permit status: Approved | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit status: In plan check | |||||
SCORE 93 Date: February 3, 2017 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: March 20, 2017 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Traffic control for street light replacement Contractor: Utilities So Ca Edison Permit status: In plan check | |||||
SCORE 93 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: February 27, 2017 Contractor: Utilities So Ca Edison Permit status: Approved | |||||
SCORE 93 Date: March 20, 2017 Contractor: Utilities So Ca Edison Permit status: Approved |