Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 62 101 N St Nw, Washington, Dc 20001 The phase 2a portion of the dunbar sr. Hs project includes drilling, loop installation, grouting, and horizontal connections of 51 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling applicaiton. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. Date: November 21, 2013 Contractor: Teddy Gebremich Department Of General Services Client: District Of Columbia | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400053 | |||||
SCORE 62 101 N St Nw, Washington, Dc 20001 The phase 2a. 2 portion of the dunbar sr. High school project includes drilling, loop installation, grouting, and horizontal connections of 76 vertical geothermal boreholes to a depth of 4 ft. Each. Air rotary drilling application. 8. 5 inch borehole to install a500b steel pipe casing ft. Into competent bedrock. 5. 5 inch borehole to target depth. Date: February 3, 2014 Contractor: Teddy Gebremich Department Of General Services Client: Teddy Gebremichael Department Of General Services | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400159 |