Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 2 I St Se, Washington, Dc 20003 A griffin hollow stem auger hsa drill rig will install up twenty gravel pack wells, by advancing a 12. 25 id hsa from existing grade to a depth of feet or refusal. All drill cutting and investigating derived wastes from potentially contaminated sites shall be placed in a covered container and laboratory tested for offsite disposal by contractor. Into each well will be installed a 1hp turbine submersible pump with discharge riser, power cord and lift cable to the surface. At the well head , a throttle valve and check valve will be installed on the effluent line, for each well will be directed through a common manifold to a baffled settling tank bst located at a location as directed by dc water or ddoe. See work plan for more details Date: February 28, 2017 Contractor: Rcp Rcp Development Co; Steve Etminani Client: Rcp Rcp Development Co | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1700113 |