SCORE

FP PERMIT J.C. CANNISTRARO LLC

ABOUT FP PERMIT J.C. CANNISTRARO LLC

Fp Permit J.C. Cannistraro Llc specializes in:

Fp Permit J.C. Cannistraro Llc offers services:

Based on the information received from , associated with Fp Permit J.C. Cannistraro Llc over the past .

If you are considering hiring Fp Permit J.C. Cannistraro Llc for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Fp Permit J.C. Cannistraro Llc has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
82
465 479 Huntington Av Boston Ma 02115
Installation of new sprinkler system in unprotected areas of the basement;&; sub-basement per nfpa 13;&; 7 cmr requirements. Please see attached impairment letter for additional information. Mfa must establish fire watch;using in-house security
Date:  June 24, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk477037 | Parcel: 0401796000
2015/06/24082465 479 Huntington Av Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
3 Newbury St Boston Ma 02115
Coordinate impairment with building managment so that only one zone is impaired at any given time within the building;
Date:  April 11, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk456630 | Parcel: 0503045110
2015/04/110823 Newbury St Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
1 Cambridge St Boston Ma 02114
Coordinate impairment with building managment so that only one zone is impaired at any given time within the building.
Date:  June 29, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk483710 | Parcel: 0302726180
2015/06/290821 Cambridge St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
Shattuck St Boston Ma 02115
Installation shall be inaccordance with 7 cmr and nfpa 13... Only one zone shall be impaired at any given time within the building.
Date:  April 16, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk459985 | Parcel: 0401896000
2015/04/16082Shattuck St Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13
Date:  August 7, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk500616 | Parcel: 0801420000
2015/08/070828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
Installation shall be in-accordance with the requirements of 7 cmr and nfpa 13..... Coordinate impairment with building management so that the 1st floor zone is the only zone impaired.
Date:  July 1, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk486071 | Parcel: 0801420000
2015/07/010828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
Relocate existing sprinkler system service to accommodate installation of new fuel tank. Extension of existing permit. Bfd paid detail required 1 officer 4 fire fighters (1) pumper truck
Date:  August 7, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk500599 | Parcel: 0801420000
2015/08/070828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
15 Parkman St Boston Ma 02114
Coordinate impairment with building managment so that only one floor is impaired at any given time
Date:  June 6, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk472019 | Parcel: 0300370000
2015/06/0608215 Parkman St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma 02210
Only one zone shall be impaired at any given time within the building.. Coordinate impairment with the buildings impairment coordinator in accordance with 527 cmr 1. 00
Date:  July 20, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk490168 | Parcel: 0602640030
2015/07/2008299 111 Seaport Bl Boston Ma 02210Fp Permit J.C. Cannistraro Llc
SCORE
82
32 Fruit St Boston Ma 02114
A complete and fully functioning sprinkler system shall be restored each day. Only one zone shall be impaired for less than 8 hours each day.
Date:  April 11, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk458361 | Parcel: 0300427000
2015/04/1108232 Fruit St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
55 Fruit St Boston Ma 02114
Only one floor shall be impaired at any given time and;impairment shall be limited to 50 sf per floor
Date:  June 1, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk473341 | Parcel: 0300381001
2015/06/0108255 Fruit St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
267 Charles St Boston Ma 02114
Only one zone shall be impaired at any given time within the building
Date:  May 12, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk466351 | Parcel: 0300370000
2015/05/12082267 Charles St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma 02215
Relocation of fire department connection check valve bfd paid detail required
Date:  April 15, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk455032 | Parcel: 0401988000
2015/04/15082354 364 Longwood Av Boston Ma 02215Fp Permit J.C. Cannistraro Llc
SCORE
82
3 Longwood Av Boston Ma 02115
Remove existing fire pump test header piping due to architectural renovations. Existing piping is no longer in service and is not tied into sprinkler system. Sprinkler system will remain in service during this work.
Date:  August 17, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk504426 | Parcel: 0401870002
2015/08/170823 Longwood Av Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
Only one floor shall be impaired at any given time.... Installation shall comply with the requirements of 7 cmr and nfpa 13
Date:  March 28, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk453592 | Parcel: 0801420000
2015/03/280828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
112 Southampton St Roxbury Ma 02118
Install new sprinkler system for phase 2b due to architectural modifications. Rough in new system with temporary uprights which will result in a 1 day shutdown and tie-in to new service. Removal of existing piping will occur after new system is complete and online.
Date:  April 13, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk457916 | Parcel: 0801027012
2015/04/13082112 Southampton St Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
112 Southampton St Roxbury Ma 02118
Install new sprinklers in select rooms for phase 2a due to architectural modifications
Date:  April 13, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk457914 | Parcel: 0801027012
2015/04/13082112 Southampton St Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
74 76 Fenwood Rd Boston Ma 02115
Jcc #3465 - installation of new sprinkler system for new 11 story building per nfpa requirements. Occupancy - residential
Date:  February 14, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk440968 | Parcel: 1000319000
2015/02/1408274 76 Fenwood Rd Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
401 401 Park Dr Boston Ma 02110
Sprinkler system shall remain fully functioning at all times within the building
Date:  May 12, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk467506
2015/05/12082401 401 Park Dr Boston Ma 02110Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
The new standpipe will be fed from the existing supply main in the adjacent existing power plant building. A new floor control valve station will be installed to control all new sprinklers within the new tower. Please see attached impairment letter.; work to be done in accordance with nfpa 13.; coordinate flow with alarm to;both areas of buildings adjacent to each side of bridge.;
Date:  June 4, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk459455 | Parcel: 0801420000
2015/06/040828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
1 Franklin St Boston Ma 02110
Install new sprinkler system for new 55-story high rise per nfpa standards and 780cmr. This is a renewal of an existing permit sprk397116
Date:  July 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk491775 | Parcel: 0304584010
2015/07/210821 Franklin St Boston Ma 02110Fp Permit J.C. Cannistraro Llc
SCORE
82
17 25 Blackfan St Boston Ma 02115
Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building.
Date:  May 4, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk463251 | Parcel: 0401894000
2015/05/0408217 25 Blackfan St Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
1 Congress St Boston Ma 02108
Emergency repair of dry standpipe supply to stair 3 and stair 5 per nfpa 14 and 7 cmr requirements. Bfd paid detail required
Date:  December 17, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk540649 | Parcel: 0302605000
2015/12/170821 Congress St Boston Ma 02108Fp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma 02210
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk548830 | Parcel: 0602640030
2015/12/2108299 111 Seaport Bl Boston Ma 02210Fp Permit J.C. Cannistraro Llc
SCORE
82
75 Francis St Boston Ma 02115
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk548073 | Parcel: 0401896000
2015/12/2108275 Francis St Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma 02215
Impairment shall be limited to one floor at any given time
Date:  June 2, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk472938 | Parcel: 0401988000
2015/06/02082354 364 Longwood Av Boston Ma 02215Fp Permit J.C. Cannistraro Llc
SCORE
82
765 Commonwealth Av Boston Ma 02215
Install new floor sprinkler systems in the b. U. Pappas library per nfpa 13 and 780cmr. Please see attached narrative describing the work.
Date:  June 16, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk474088
2015/06/16082765 Commonwealth Av Boston Ma 02215Fp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma 02210
Installation of new sprinkler system in new 18 story building per nfpa 13 14 24 and 7 cmr requirements.
Date:  April 11, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk455571 | Parcel: 0602640030
2015/04/1108299 111 Seaport Bl Boston Ma 02210Fp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma 02215
Coordination this project with work performed under sprk 455032
Date:  April 16, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk459910 | Parcel: 0401988000
2015/04/16082354 364 Longwood Av Boston Ma 02215Fp Permit J.C. Cannistraro Llc
SCORE
82
2 Longwood Av Boston Ma 02115
Installation shall comply with the requirements of 7 cmr and nfpa 13... Only one;zone shall be impaired at any given time within the building.
Date:  May 27, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk468819 | Parcel: 0401882000
2015/05/270822 Longwood Av Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
55 Fruit St Boston Ma 02114
Only one zone shall be impaired at any given time within the building
Date:  May 12, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk466338 | Parcel: 0300370000
2015/05/1208255 Fruit St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
Shattuck St Boston Ma 02115
Only one floor can be impairement at any given time within the building for less than 8hrs.
Date:  April 11, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk458299 | Parcel: 0401896000
2015/04/11082Shattuck St Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
123 125 Antwerp St Brighton Ma 02135
The impairment shall be limited to sf
Date:  June 16, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk464451 | Parcel: 2200862000
2015/06/16082123 125 Antwerp St Brighton Ma 02135Fp Permit J.C. Cannistraro Llc
SCORE
82
20 22 Liberty Dr Boston Ma 02210
Install new sprinkler system per 7 cmr & nfpa 13 14 requirements. This is a renewal of an existing permit for 20-22 liberty dr (fan pier c) which expires on 5282015 (see attached)
Date:  May 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk468925 | Parcel: 0602671025
2015/05/2108220 22 Liberty Dr Boston Ma 02210Fp Permit J.C. Cannistraro Llc
SCORE
82
7 Albany St Roxbury Ma 02118
Relocate existing sprinklers in basement floor 1 and floor 2 of the existing power plant building due to architectural changes - relocating sprinklers by repositioning armovers to accommodate necessary sprinkler relocations.; work to be done;per nfpa 13 and 241.;
Date:  June 4, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk458691 | Parcel: 0801067020
2015/06/040827 Albany St Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
110 112 Southampton St Roxbury Ma 02118
Jcc job# 873191 - install new sprinkler system on 2nd floor of 112 southampton street. Perform 1 day test and tie-in. (new homeless shelter). This is phase 1 of the project.
Date:  January 9, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk439982 | Parcel: 0801027012
2015/01/09082110 112 Southampton St Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
7 Boylston St Boston Ma 02116
Heat detectors shall be installed and test by bfd prior to removing the sprinkler system. Bfd paid detail required
Date:  June 9, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk471109
2015/06/090827 Boylston St Boston Ma 02116Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
Installation shall be inaccordance with 7 cmr and nfpa 13
Date:  August 28, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk459405 | Parcel: 0801420000
2015/08/280828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
9 Anderson St Boston Ma 02114
A temporary c of o was issued for all the work under sprk374951 except the standpipes the existing contactor is no longer on the project therefore;cannistraro is applying for a permit to complete the testing requirements.
Date:  August 28, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk505629 | Parcel: 0502218000
2015/08/280829 Anderson St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
131 131a Beverly St Boston Ma 02114
Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installation of temporary standpipe to include standpipe pac
Date:  August 28, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk506587 | Parcel: 0303063000
2015/08/28082131 131a Beverly St Boston Ma 02114Fp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Roxbury Ma 02118
Each floor will be tied in separately with no one floor being shut down for longer than eight hours. Please see attached impairment letter for additional information.; work to be done in accordance with code red impairment plan.
Date:  August 31, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk459470 | Parcel: 0801420000
2015/08/310828 Harrison Av Roxbury Ma 02118Fp Permit J.C. Cannistraro Llc
SCORE
82
3 Longwood Av Boston Ma 02115
Relocate existing sprinklers in the first floor clinical building and 1st floor farley building due to architectural renovations per nfpa 13 and 7 cmr requirements.; one floor zone at a time. No patient occupancy in impaired zone.
Date:  September 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk518389 | Parcel: 0401870002
2015/09/210823 Longwood Av Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
82
Northern Av Boston Ma 02210
Cut and cap existing underground sprinkler service as it enters the building. Service will be capped and made safe. Building to be razed. ;removal of underground service by others. Building to be unnoccupied and secure from trespass. No other building fire services to be affected by work. Bfd paid detail required
Date:  September 18, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk516423 | Parcel: 0602671025
2015/09/18082Northern Av Boston Ma 02210Fp Permit J.C. Cannistraro Llc
SCORE
82
465 479 Huntington A Boston Ma
Installation of new sprinkler system in unprotected areas of the basement;&; sub-basement per nfpa 13;&; 7 cmr requirements. Please see attached impairment letter for additional information. Mfa must establish fire watch;using in-house security
Date:  June 24, 2015

Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk477037 | Parcel: 0401796000
2015/06/24082465 479 Huntington A Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
3 Newbury St Boston Ma
Coordinate impairment with building managment so that only one zone is impaired at any given time within the building;
Date:  April 11, 2015

Client: Mskc Newton Res | Permit type: Bfd sprinkler system | Permit id: Sprk456630 | Parcel: 0503045110
2015/04/110823 Newbury St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Cambridge St Boston Ma
Coordinate impairment with building managment so that only one zone is impaired at any given time within the building.
Date:  June 29, 2015

Client: Bright Horizons | Permit type: Bfd sprinkler system | Permit id: Sprk483710 | Parcel: 0302726180
2015/06/290821 Cambridge St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Shattuck St Boston Ma
Installation shall be inaccordance with 7 cmr and nfpa 13... Only one zone shall be impaired at any given time within the building.
Date:  April 16, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk459985 | Parcel: 0401896000
2015/04/16082Shattuck St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13
Date:  August 7, 2015

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk500616 | Parcel: 0801420000
2015/08/070828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall be in-accordance with the requirements of 7 cmr and nfpa 13..... Coordinate impairment with building management so that the 1st floor zone is the only zone impaired.
Date:  July 1, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk486071 | Parcel: 0801420000
2015/07/010828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Relocate existing sprinkler system service to accommodate installation of new fuel tank. Extension of existing permit. Bfd paid detail required 1 officer 4 fire fighters (1) pumper truck
Date:  August 7, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk500599 | Parcel: 0801420000
2015/08/070828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
15 Parkman St Boston Ma
Coordinate impairment with building managment so that only one floor is impaired at any given time
Date:  June 6, 2015

Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk472019 | Parcel: 0300370000
2015/06/0608215 Parkman St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma
Only one zone shall be impaired at any given time within the building.. Coordinate impairment with the buildings impairment coordinator in accordance with 527 cmr 1. 00
Date:  July 20, 2015

Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk490168 | Parcel: 0602640030
2015/07/2008299 111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
32 Fruit St Boston Ma
A complete and fully functioning sprinkler system shall be restored each day. Only one zone shall be impaired for less than 8 hours each day.
Date:  April 11, 2015

Client: Sauro James D T | Permit type: Bfd sprinkler system | Permit id: Sprk458361 | Parcel: 0300427000
2015/04/1108232 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
55 Fruit St Boston Ma
Only one floor shall be impaired at any given time and;impairment shall be limited to 50 sf per floor
Date:  June 1, 2015

Client: Mass Eye And Ear Infirmary | Permit type: Bfd sprinkler system | Permit id: Sprk473341 | Parcel: 0300381001
2015/06/0108255 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
267 Charles St Boston Ma
Only one zone shall be impaired at any given time within the building
Date:  May 12, 2015

Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk466351 | Parcel: 0300370000
2015/05/12082267 Charles St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma
Relocation of fire department connection check valve bfd paid detail required
Date:  April 15, 2015

Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk455032 | Parcel: 0401988000
2015/04/15082354 364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
3 Longwood Av Boston Ma
Remove existing fire pump test header piping due to architectural renovations. Existing piping is no longer in service and is not tied into sprinkler system. Sprinkler system will remain in service during this work.
Date:  August 17, 2015

Client: Childrens Hosp | Permit type: Bfd sprinkler system | Permit id: Sprk504426 | Parcel: 0401870002
2015/08/170823 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Only one floor shall be impaired at any given time.... Installation shall comply with the requirements of 7 cmr and nfpa 13
Date:  March 28, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk453592 | Parcel: 0801420000
2015/03/280828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
112 Southampton St Boston Ma
Install new sprinkler system for phase 2b due to architectural modifications. Rough in new system with temporary uprights which will result in a 1 day shutdown and tie-in to new service. Removal of existing piping will occur after new system is complete and online.
Date:  April 13, 2015

Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk457916 | Parcel: 0801027012
2015/04/13082112 Southampton St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
112 Southampton St Boston Ma
Install new sprinklers in select rooms for phase 2a due to architectural modifications
Date:  April 13, 2015

Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk457914 | Parcel: 0801027012
2015/04/13082112 Southampton St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
74 76 Fenwood Rd Boston Ma
Jcc #3465 - installation of new sprinkler system for new 11 story building per nfpa requirements. Occupancy - residential
Date:  February 14, 2015

Client: Commwlth Of Mass | Permit type: Bfd sprinkler system | Permit id: Sprk440968 | Parcel: 1000319000
2015/02/1408274 76 Fenwood Rd Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
401 401 Park Dr Boston Ma
Sprinkler system shall remain fully functioning at all times within the building
Date:  May 12, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk467506
2015/05/12082401 401 Park Dr Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
The new standpipe will be fed from the existing supply main in the adjacent existing power plant building. A new floor control valve station will be installed to control all new sprinklers within the new tower. Please see attached impairment letter.; work to be done in accordance with nfpa 13.; coordinate flow with alarm to;both areas of buildings adjacent to each side of bridge.;
Date:  June 4, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk459455 | Parcel: 0801420000
2015/06/040828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Franklin St Boston Ma
Install new sprinkler system for new 55-story high rise per nfpa standards and 780cmr. This is a renewal of an existing permit sprk397116
Date:  July 21, 2015

Client: Washington Stre | Permit type: Bfd sprinkler system | Permit id: Sprk491775 | Parcel: 0304584010
2015/07/210821 Franklin St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
17 25 Blackfan St Boston Ma
Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building.
Date:  May 4, 2015

Client: Childrens Hosp | Permit type: Bfd sprinkler system | Permit id: Sprk463251 | Parcel: 0401894000
2015/05/0408217 25 Blackfan St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Impairment shall be coordinated with the buildings impairment coordinator (mike canning) so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25.
Date:  October 24, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk526268 | Parcel: 0801420000
2015/10/240828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Impairment shall be coordinated with the buildings impairment coordinator (mike canning)so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25.
Date:  October 24, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk526260 | Parcel: 0801420000
2015/10/240828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
15 Parkman St Boston Ma
Impairment shall be coordinated with the buildings impairment coordinator; so that only one zone is impaired at any given time within the building. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and nfpa 25.
Date:  October 24, 2015

Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk527294 | Parcel: 0300370000
2015/10/2408215 Parkman St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma
Relocation of sprinkler heads on the 6th floor due to architectural changes per nfpa 13 and 7 cmr
Date:  October 29, 2015

Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk524613 | Parcel: 0602640030
2015/10/2908299 111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
374 Commonwealth Av Boston Ma
Relocate sprinklers in basement to 5th floor to provide adequate protection due to architectural changes. Installation of new standpipe per nfpa 14 requirements. (please see attached impairment letter for more information.) bfd paid detail required
Date:  May 14, 2015

Client: Harvard Club Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk464336 | Parcel: 0503816000
2015/05/14082374 Commonwealth Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
112 Southampton St Boston Ma
New sprinkler system for phase 3 due to arch changes. Install new system with temp uprights which results in a 1 day shutdown and tie in to new service. Existing system will then be removed. Phase 3 is isolated from the remainder of the building and shutdowns will only affect the construction area.
Date:  November 20, 2015

Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk536762 | Parcel: 0801027012
2015/11/20082112 Southampton St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Deaconess Rd Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  November 27, 2015

Client: Beth Israel Dea | Permit type: Bfd sprinkler system | Permit id: Sprk531965 | Parcel: 0401954001
2015/11/270821 Deaconess Rd Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
3 Brookline Av Boston Ma
Coordinate impairment with building impairment coordinator so that only one zone is impaired at any given time within the building
Date:  December 4, 2015

Client: Beth Israel Hospital | Permit type: Bfd sprinkler system | Permit id: Sprk533536 | Parcel: 0401862000
2015/12/040823 Brookline Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
7 Boylston St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 14, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk542994
2015/12/140827 Boylston St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1153 Centre St Boston Ma
Bfd witness testing is required contact john alves 617-343-3034 to schedule test bfd paid detail required-1-pump 1-officer &; 3 firefighters
Date:  December 14, 2015

Client: Faulkner Hospit | Permit type: Bfd sprinkler system | Permit id: Sprk542365 | Parcel: 1902598000
2015/12/140821153 Centre St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
265 Charles St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 15, 2015

Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk546295 | Parcel: 0300370000
2015/12/15082265 Charles St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
2 Longwood Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 15, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk547711 | Parcel: 0401882000
2015/12/150822 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Staniford St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 15, 2015

Client: Charles River P | Permit type: Bfd sprinkler system | Permit id: Sprk546019 | Parcel: 0300470000
2015/12/15082Staniford St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Congress St Boston Ma
Emergency repair of dry standpipe supply to stair 3 and stair 5 per nfpa 14 and 7 cmr requirements. Bfd paid detail required
Date:  December 17, 2015

Client: Gsa Fin Div Util Unit 01173457 | Permit type: Bfd sprinkler system | Permit id: Sprk540649 | Parcel: 0302605000
2015/12/170821 Congress St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 21, 2015

Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk548830 | Parcel: 0602640030
2015/12/2108299 111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
75 Francis St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 21, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk548073 | Parcel: 0401896000
2015/12/2108275 Francis St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
161 209 Cambridge St Boston Ma
Install new sprinkler system on level 7 of 165 cambridge st (charles river plaza). Space is currently empty and protected with temporary heat detectors (see approved bfd permit attached and supplemental jcc impairment letter). Installation to conform with nfpa and 780cmr requirements
Date:  January 5, 2016

Client: Div Charles River Limited | Permit type: Bfd sprinkler system | Permit id: Sprk542594 | Parcel: 0300660000
2016/01/05082161 209 Cambridge St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
201 201 Brookline Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  January 6, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk550026
2016/01/06082201 201 Brookline Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Rowes Wharf Downtown Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  January 19, 2016

Client: Rowes Wharf Con | Permit type: Bfd sprinkler system | Permit id: Sprk550944 | Parcel: 0302961000
2016/01/19082Rowes Wharf Downtown MaFp Permit J.C. Cannistraro Llc
SCORE
82
161 209 Cambridge St Boston Ma
Relocate a small portion of standpipe to accommodate a new egress door in stairwell on level 7 of 165 cambridge st (charles st plaza). Work will take place during 1-8 hour shutdown. (impairment letter attached) bfd paid detail required
Date:  January 27, 2016

Client: Div Charles River Limited | Permit type: Bfd sprinkler system | Permit id: Sprk551355 | Parcel: 0300660000
2016/01/27082161 209 Cambridge St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma
Impairment shall be limited to one floor at any given time
Date:  June 2, 2015

Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk472938 | Parcel: 0401988000
2015/06/02082354 364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
765 Commonwealth Av Boston Ma
Install new floor sprinkler systems in the b. U. Pappas library per nfpa 13 and 780cmr. Please see attached narrative describing the work.
Date:  June 16, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk474088
2015/06/16082765 Commonwealth Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99 111 Seaport Bl Boston Ma
Installation of new sprinkler system in new 18 story building per nfpa 13 14 24 and 7 cmr requirements.
Date:  April 11, 2015

Client: Ms Boston Seapo | Permit type: Bfd sprinkler system | Permit id: Sprk455571 | Parcel: 0602640030
2015/04/1108299 111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma
Coordination this project with work performed under sprk 455032
Date:  April 16, 2015

Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk459910 | Parcel: 0401988000
2015/04/16082354 364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
2 Longwood Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa 13... Only one;zone shall be impaired at any given time within the building.
Date:  May 27, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk468819 | Parcel: 0401882000
2015/05/270822 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
55 Fruit St Boston Ma
Only one zone shall be impaired at any given time within the building
Date:  May 12, 2015

Client: Partners Healthcare System Mgh | Permit type: Bfd sprinkler system | Permit id: Sprk466338 | Parcel: 0300370000
2015/05/1208255 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Shattuck St Boston Ma
Only one floor can be impairement at any given time within the building for less than 8hrs.
Date:  April 11, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk458299 | Parcel: 0401896000
2015/04/11082Shattuck St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
123 125 Antwerp St Brighton Ma
The impairment shall be limited to sf
Date:  June 16, 2015

Client: Harvard Realls | Permit type: Bfd sprinkler system | Permit id: Sprk464451 | Parcel: 2200862000
2015/06/16082123 125 Antwerp St Brighton MaFp Permit J.C. Cannistraro Llc
SCORE
82
20 22 Liberty Dr South Boston Ma
Install new sprinkler system per 7 cmr & nfpa 13 14 requirements. This is a renewal of an existing permit for 20-22 liberty dr (fan pier c) which expires on 5/28/2015 (see attached)
Date:  May 21, 2015

Client: Fan Pier Develo | Permit type: Bfd sprinkler system | Permit id: Sprk468925 | Parcel: 0602671025
2015/05/2108220 22 Liberty Dr South Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
7 Albany St Boston Ma
Relocate existing sprinklers in basement floor 1 and floor 2 of the existing power plant building due to architectural changes - relocating sprinklers by repositioning armovers to accommodate necessary sprinkler relocations.; work to be done;per nfpa 13 and 241.;
Date:  June 4, 2015

Client: Six Sixty Corpo | Permit type: Bfd sprinkler system | Permit id: Sprk458691 | Parcel: 0801067020
2015/06/040827 Albany St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
110 112 Southampton Boston Ma
Jcc job# 873191 - install new sprinkler system on 2nd floor of 112 southampton street. Perform 1 day test and tie-in. (new homeless shelter). This is phase 1 of the project.
Date:  January 9, 2015

Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk439982 | Parcel: 0801027012
2015/01/09082110 112 Southampton Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
7 Boylston St Boston Ma
Heat detectors shall be installed and test by bfd prior to removing the sprinkler system. Bfd paid detail required
Date:  June 9, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk471109
2015/06/090827 Boylston St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall be inaccordance with 7 cmr and nfpa 13
Date:  August 28, 2015

Client: Univ Hospital I | Permit type: Bfd sprinkler system | Permit id: Sprk459405 | Parcel: 0801420000
2015/08/280828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
9 Anderson St Boston Ma
A temporary c of o was issued for all the work under sprk374951 except the standpipes the existing contactor is no longer on the project therefore;cannistraro is applying for a permit to complete the testing requirements.
Date:  August 28, 2015

Client: Emerald Realty Capital Llc | Permit type: Bfd sprinkler system | Permit id: Sprk505629 | Parcel: 0502218000
2015/08/280829 Anderson St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
131 131a Beverly St Boston Ma
Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installation of temporary standpipe to include standpipe pac
Date:  August 28, 2015

Client: Beverly Wharf L | Permit type: Bfd sprinkler system | Permit id: Sprk506587 | Parcel: 0303063000
2015/08/28082131 131a Beverly St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Each floor will be tied in separately with no one floor being shut down for longer than eight hours. Please see attached impairment letter for additional information.; work to be done in accordance with code red impairment plan.
Date:  August 31, 2015

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk459470 | Parcel: 0801420000
2015/08/310828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
3 Longwood Av Boston Ma
Relocate existing sprinklers in the first floor clinical building and 1st floor farley building due to architectural renovations per nfpa 13 and 7 cmr requirements.; one floor zone at a time. No patient occupancy in impaired zone.
Date:  September 21, 2015

Client: Childrens Hosp | Permit type: Bfd sprinkler system | Permit id: Sprk518389 | Parcel: 0401870002
2015/09/210823 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Northern Av Boston Ma
Cut and cap existing underground sprinkler service as it enters the building. Service will be capped and made safe. Building to be razed. ;removal of underground service by others. Building to be unnoccupied and secure from trespass. No other building fire services to be affected by work. Bfd paid detail required
Date:  September 18, 2015

Client: Fan Pier Develo | Permit type: Bfd sprinkler system | Permit id: Sprk516423 | Parcel: 0602671025
2015/09/18082Northern Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354 364 Longwood Av Boston Ma
Coordinate impairment with the building impairment coordinator so that only one zone is impaired at any given time
Date:  October 10, 2015

Client: Diabetes Founda | Permit type: Bfd sprinkler system | Permit id: Sprk522854 | Parcel: 0401988000
2015/10/10082354 364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
26 North St Boston Ma
Coordinate impairment with the building impairment manager so that only one zone is impaired at any given time
Date:  October 13, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk522887
2015/10/1308226 North St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Boylston St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  September 16, 2016

Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk587156 | Parcel: 0401037100
2016/09/160828 Boylston St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
55 Fruit St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 16, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk595352
2016/06/1608255 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
465479 Huntington A Boston Ma
Installation of new sprinkler system in unprotected areas of the basement;&; sub-basement per nfpa 13;&; 7 cmr requirements. Please see attached impairment letter for additional information. Mfa must establish fire watch;using in-house security
Date:  June 24, 2015

Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk477037 | Parcel: 0401796000
2015/06/24082465479 Huntington A Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  February 13, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk554582 | Parcel: 0801420000
2016/02/130828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Ave Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 23, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk598734
2016/06/230828 Harrison Ave Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Childrens Rd Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  May 25, 2016

Client: Childrens Hospital Corp The | Permit type: Bfd sprinkler system | Permit id: Sprk587320 | Parcel: 0401895000
2016/05/250821 Childrens Rd Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Childrens Rd Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per buildings nfpa 241 report )so that only one zone is impaired at any given time within the building
Date:  March 28, 2016

Client: Childrens Hospital Corp The | Permit type: Bfd sprinkler system | Permit id: Sprk570458 | Parcel: 0401895000
2016/03/280821 Childrens Rd Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
465479 Huntington A Boston Ma
Condition of approval: during the sprinkler tie-in (impairment) any area effected by the sprinkler shut down shall not be occupied. The tie-in will impair approximately 7 5 sf of attic space and 5 0 sf of gallery space. Both spaces are currently closed to the public.
Date:  June 23, 2016

Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk590195 | Parcel: 0401796000
2016/06/23082465479 Huntington A Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
124 Boylston St Boston Ma
Conditions of approval: heat detectors shall be installed and tested with bfd prior to removing the sprinkler system. Only one floors sprinkler system shall be impaired at any given time within the building.
Date:  July 13, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk592761
2016/07/13082124 Boylston St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
304 Commonwealth Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  March 5, 2016

Client: Clark Weld House Condo Trust | Permit type: Bfd sprinkler system | Permit id: Sprk565149 | Parcel: 0503070000
2016/03/05082304 Commonwealth Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (roger goudreau) so that only one zone is impaired at any given time within the building
Date:  March 7, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk565985 | Parcel: 0801420000
2016/03/070828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
11 Post Office Sq Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per the buildings nfpa 241 report;) so that only one zone is impaired at any given time within the building
Date:  March 9, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk567370
2016/03/0908211 Post Office Sq Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
7 Boylston St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  July 5, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk603608
2016/07/050827 Boylston St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
401401 Park Dr Boston Ma
Sprinkler system shall remain fully functioning at all times within the building
Date:  May 12, 2015

Permit type: Bfd sprinkler system | Permit id: Sprk467506
2015/05/12082401401 Park Dr Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Northern Av Boston Ma
Cut cap and make safe existing fire protection service to allow for demolition of building.
Date:  March 22, 2016

Client: Pier Four Inc | Permit type: Bfd sprinkler system | Permit id: Sprk569808 | Parcel: 0602671060
2016/03/220821 Northern Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Impairment limited to;just the penthouse no other floor sprinkler system shall be impaired during this scheduled work..... Coordinate impairment with the buildings impairment coordinator... Building permit alt563738
Date:  April 5, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk539381 | Parcel: 0801420000
2016/04/050828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  April 5, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk572356 | Parcel: 0801420000
2016/04/050828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
161209 Cambridge St Boston Ma
Relocate a small portion of standpipe to accommodate a new egress door in stairwell on level 7 of 165 cambridge st (charles st plaza). Work will take place during 1-8 hour shutdown. (impairment letter attached) bfd paid detail required
Date:  January 27, 2016

Client: Div Charles River Lps | Permit type: Bfd sprinkler system | Permit id: Sprk551355 | Parcel: 0300660000
2016/01/27082161209 Cambridge St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Harbor St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building.
Date:  May 2, 2016

Client: Economic Development And | Permit type: Bfd sprinkler system | Permit id: Sprk582729 | Parcel: 0602674000
2016/05/020821 Harbor St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
147149 Milk St Boston Ma
Install (2) fire department valves on 10th floor to allow for standpipe testing per nfpa 14 and 7 cmr requirements.
Date:  July 5, 2016

Client: Mept 147 Milk Llc | Permit type: Bfd sprinkler system | Permit id: Sprk603631 | Parcel: 0304027000
2016/07/05082147149 Milk St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
7 Albany St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  April 13, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk575119 | Parcel: 0801067020
2016/04/130827 Albany St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
4 Brookline Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building.
Date:  February 20, 2016

Client: Children Cancer Research | Permit type: Bfd sprinkler system | Permit id: Sprk559655 | Parcel: 0401913000
2016/02/200824 Brookline Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354364 Longwood Av Boston Ma
Coordinate impairment with the building impairment coordinator so that only one zone is impaired at any given time
Date:  October 10, 2015

Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk522854 | Parcel: 0401988000
2015/10/10082354364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
601 Congress St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  March 30, 2016

Client: John Hancock Life Insurance | Permit type: Bfd sprinkler system | Permit id: Sprk571699 | Parcel: 0602678701
2016/03/30082601 Congress St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Franklin St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards installation shall be per isd approved phasing plan.
Date:  May 3, 2016

Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk579648 | Parcel: 0304584010
2016/05/030821 Franklin St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
125 Summer St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator and test the system per nfpa 13 on completion. Bfd paid detail required... 1-officer &; 3-firefighters;
Date:  April 26, 2016

Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk582882 | Parcel: 0304256000
2016/04/26082125 Summer St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99111 Seaport Bl Boston Ma
Relocation of sprinkler heads on the 6th floor due to architectural changes per nfpa 13 and 7 cmr
Date:  October 29, 2015

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk524613 | Parcel: 0602640030
2015/10/2908299111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1862 Brookline Av Boston Ma
Installation of a new sprinkler system for a new 32 story high rise per nfpa 13 14 24 and 7 cmr
Date:  March 3, 2016

Client: Fenway Ventures Point | Permit type: Bfd sprinkler system | Permit id: Sprk562641 | Parcel: 2100055000
2016/03/030821862 Brookline Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Franklin St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 8, 2016

Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk590159 | Parcel: 0304584010
2016/06/080821 Franklin St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
2 Longwood Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 6, 2016

Client: Harvard College | Permit type: Bfd sprinkler system | Permit id: Sprk587337 | Parcel: 0401882000
2016/06/060822 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
32 Fruit St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  May 25, 2016

Client: The General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk587325 | Parcel: 0300445000
2016/05/2508232 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1725 Blackfan St Boston Ma
Installation shall comply with 7 cmr and nfpa 13...... Only one zone shall be impaired at any given time within the building.
Date:  May 4, 2015

Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk463251 | Parcel: 0401894000
2015/05/040821725 Blackfan St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99111 Seaport Bl Boston Ma
Installation of new sprinkler system in new 18 story building per nfpa 13 14 24 and 7 cmr requirements.
Date:  April 11, 2015

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk455571 | Parcel: 0602640030
2015/04/1108299111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
32 Fruit St Boston Ma
Relocate sprinkler heads throughout 5th and 6th floors of mgh yawkey. Floors will be zoned out and no more than 1 floor will be shut down at a time. (this is an extension of sprk#458361) work to be done per nfpa stands. 7 cmr one floor zone at a time 8hrs. No patient occupancy in impaired zone.
Date:  April 28, 2016

Client: The General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk579201 | Parcel: 0300445000
2016/04/2808232 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
15 Marina Park Dr Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  April 13, 2016

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk575295 | Parcel: 0602671025
2016/04/1308215 Marina Park Dr Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
South St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 6, 2016

Client: Sixty South Street Limited | Permit type: Bfd sprinkler system | Permit id: Sprk587378 | Parcel: 0304300010
2016/06/06082South St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1 Francis St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  May 2, 2016

Client: Beth Israel Deaconess Inc | Permit type: Bfd sprinkler system | Permit id: Sprk582736 | Parcel: 0401964000
2016/05/020821 Francis St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
131131a Beverly St Boston Ma
Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installation of temporary standpipe to include standpipe pac
Date:  August 28, 2015

Client: Related Lovejoy Residential | Permit type: Bfd sprinkler system | Permit id: Sprk506587 | Parcel: 0303063000
2015/08/28082131131a Beverly St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Northern Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  July 6, 2016

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk607964 | Parcel: 0602671025
2016/07/06082Northern Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
7476 Fenwood Rd Boston Ma
Jcc #3465 - installation of new sprinkler system for new 11 story building per nfpa requirements. Occupancy - residential
Date:  February 14, 2015

Client: Commonwealth Of Mass | Permit type: Bfd sprinkler system | Permit id: Sprk440968 | Parcel: 1000319000
2015/02/140827476 Fenwood Rd Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
55 Fruit St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  February 8, 2016

Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk554383 | Parcel: 0300370000
2016/02/0808255 Fruit St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
55 Thomson Pl Boston Ma
Repair section of underground sprinkler pipe and replace leaking os&y valve on backflow preventer.
Date:  April 6, 2016

Client: Fifty 5 Thomson St Invest Lp | Permit type: Bfd sprinkler system | Permit id: Sprk572066 | Parcel: 0602654001
2016/04/0608255 Thomson Pl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building.;anticipated to start after phase 1 in august 2016.
Date:  April 6, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk572374 | Parcel: 0801420000
2016/04/060828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8 Harrison Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building. Anticipated to state work after phase 1 august 16 2016
Date:  April 6, 2016

Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk572341 | Parcel: 0801420000
2016/04/060828 Harrison Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
201201 Brookline Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  January 6, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk550026
2016/01/06082201201 Brookline Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
25 Harvard St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards ; the requirements of nfpa 13 section 8. 17. 4. 6. 2 shall be addressed with isd
Date:  May 2, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk579444
2016/05/0208225 Harvard St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
3 Longwood Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 6, 2016

Permit type: Bfd sprinkler system | Permit id: Sprk589520
2016/06/060823 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
267 Charles St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building.
Date:  March 4, 2016

Client: Mass Gen Eye * Ear Inf | Permit type: Bfd sprinkler system | Permit id: Sprk563496 | Parcel: 0300381001
2016/03/04082267 Charles St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
111 Court St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  July 1, 2016

Client: Ames Investor Llc | Permit type: Bfd sprinkler system | Permit id: Sprk602613 | Parcel: 0302885000
2016/07/01082111 Court St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
109 Brookline Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator (per buildings nfpa 241 report )so that only one zone is impaired at any given time within the building
Date:  March 21, 2016

Client: Hub Properties Trust | Permit type: Bfd sprinkler system | Permit id: Sprk569335 | Parcel: 2100071000
2016/03/21082109 Brookline Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
161209 Cambridge St Boston Ma
Install new sprinkler system on level 7 of 165 cambridge st (charles river plaza). Space is currently empty and protected with temporary heat detectors (see approved bfd permit attached and supplemental jcc impairment letter). Installation to conform with nfpa and 780cmr requirements
Date:  January 5, 2016

Client: Charles River Plaza Primary | Permit type: Bfd sprinkler system | Permit id: Sprk542594 | Parcel: 0300660010
2016/01/05082161209 Cambridge St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
125 Summer St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  March 16, 2016

Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk568196 | Parcel: 0304256000
2016/03/16082125 Summer St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
273 Charles St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  February 17, 2016

Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk557098 | Parcel: 0300371000
2016/02/17082273 Charles St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
1725 Blackfan St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 6, 2016

Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk587371 | Parcel: 0401894000
2016/06/060821725 Blackfan St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354364 Longwood Av Boston Ma
Impairment shall be limited to one floor at any given time
Date:  June 2, 2015

Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk472938 | Parcel: 0401988000
2015/06/02082354364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
15 Marina Park Dr Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building.
Date:  March 4, 2016

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk564178 | Parcel: 0602671025
2016/03/0408215 Marina Park Dr Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
55 Thomson Pl Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  May 3, 2016

Client: Fifty 5 Thomson St Invest Lp | Permit type: Bfd sprinkler system | Permit id: Sprk581166 | Parcel: 0602654001
2016/05/0308255 Thomson Pl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Blossom St Boston Ma
Only one floor shall be impaired at a time and the entire sprinkler system for that floor shall be fully restored that day. The impairment of the sprinkler system shall be coordinated with the designated building impairment coordinator.
Date:  May 19, 2016

Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk584866 | Parcel: 0300370000
2016/05/19082Blossom St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
2022 Liberty Dr South Boston Ma
Install new sprinkler system per 7 cmr & nfpa 13 14 requirements. This is a renewal of an existing permit for 20-22 liberty dr (fan pier c) which expires on 5 28 2015 (see attached)
Date:  May 21, 2015

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk468925 | Parcel: 0602671025
2015/05/210822022 Liberty Dr South Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
3 Longwood Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  May 2, 2016

Client: Childrens Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk565205 | Parcel: 0401870000
2016/05/020823 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354364 Longwood Av Boston Ma
Coordination this project with work performed under sprk 455032
Date:  April 16, 2015

Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk459910 | Parcel: 0401988000
2015/04/16082354364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
110112 Southampton Boston Ma
Jcc job# 873191 - install new sprinkler system on 2nd floor of 112 southampton street. Perform 1 day test and tie-in. (new homeless shelter). This is phase 1 of the project.
Date:  January 9, 2015

Client: City Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk439982 | Parcel: 0801027012
2015/01/09082110112 Southampton Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
123125 Antwerp St Brighton Ma
The impairment shall be limited to sf
Date:  June 16, 2015

Client: Harvard Re Allston Inc | Permit type: Bfd sprinkler system | Permit id: Sprk464451 | Parcel: 2200862000
2015/06/16082123125 Antwerp St Brighton MaFp Permit J.C. Cannistraro Llc
SCORE
82
22 Liberty Dr Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 23, 2016

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk599861 | Parcel: 0602671025
2016/06/2308222 Liberty Dr Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
Liberty Dr Boston Ma
Installation of a new sprinkler system in new 14 story building per nfpa13 and 7 cmr
Date:  July 5, 2016

Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk603479 | Parcel: 0602671025
2016/07/05082Liberty Dr Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
22012209 Washington Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  July 5, 2016

Client: Madison Washington Ii Llc | Permit type: Bfd sprinkler system | Permit id: Sprk605400 | Parcel: 0902478000
2016/07/0508222012209 Washington Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
354364 Longwood Av Boston Ma
Relocation of fire department connection check valve bfd paid detail required
Date:  April 15, 2015

Client: Diabetes Foundation Inc | Permit type: Bfd sprinkler system | Permit id: Sprk455032 | Parcel: 0401988000
2015/04/15082354364 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
149 Thirteenth St Charlestown Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  May 11, 2016

Client: Constitution Office Park Le | Permit type: Bfd sprinkler system | Permit id: Sprk583820 | Parcel: 0203510451
2016/05/11082149 Thirteenth St Charlestown MaFp Permit J.C. Cannistraro Llc
SCORE
82
149 Thirteenth St Charlestown Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 16, 2016

Client: Constitution Office Park Le | Permit type: Bfd sprinkler system | Permit id: Sprk595353 | Parcel: 0203510451
2016/06/16082149 Thirteenth St Charlestown MaFp Permit J.C. Cannistraro Llc
SCORE
82
125 Summer St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building bfd paid detail required
Date:  April 26, 2016

Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk582880 | Parcel: 0304256000
2016/04/26082125 Summer St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
149 Thirteenth St Charlestown Ma
Relocate sprinkler branch line due to new ahu being installed in building 149 per nfpa 13 and 7 cmr.
Date:  June 24, 2016

Client: Constitution Office Park Le | Permit type: Bfd sprinkler system | Permit id: Sprk601496 | Parcel: 0203510451
2016/06/24082149 Thirteenth St Charlestown MaFp Permit J.C. Cannistraro Llc
SCORE
82
99111 Seaport Bl Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building
Date:  December 21, 2015

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk548830 | Parcel: 0602640030
2015/12/2108299111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
75 Francis St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards....... Coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  June 16, 2016

Client: Brigham& Womens Hosp Inc | Permit type: Bfd sprinkler system | Permit id: Sprk595706 | Parcel: 0401896000
2016/06/1608275 Francis St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
333 Longwood Av Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;impairment coordinator so that only one zone is impaired at any given time within the building
Date:  April 13, 2016

Client: Chb Properties Inc | Permit type: Bfd sprinkler system | Permit id: Sprk576146 | Parcel: 0401855000
2016/04/13082333 Longwood Av Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
125 Summer St Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with building impairment coordinator (527 cmr 1. Section 16. 3. 2) so that only one zone is impaired at any given time within the building.
Date:  March 4, 2016

Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk563561 | Parcel: 0304256000
2016/03/04082125 Summer St Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
8082 Fenwood Rd Boston Ma
Installation shall comply with the requirements of 7 cmr and nfpa standards
Date:  February 17, 2016

Client: Commonwealth Of Mass | Permit type: Bfd sprinkler system | Permit id: Sprk557237 | Parcel: 1000319000
2016/02/170828082 Fenwood Rd Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
99111 Seaport Bl Boston Ma
Only one zone shall be impaired at any given time within the building.. Coordinate impairment with the buildings impairment coordinator in accordance with 527 cmr 1. 00
Date:  July 20, 2015

Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk490168 | Parcel: 0602640030
2015/07/2008299111 Seaport Bl Boston MaFp Permit J.C. Cannistraro Llc
SCORE
82
225 Albany St Boston Ma
Installation of new sprinkler system in new 6 story building per nfpa 13 14 24 and 7 cmr requirements.
Date:  May 2, 2016

Client: Ink Block Three Llc | Permit type: Bfd sprinkler system | Permit id: Sprk579199 | Parcel: 0306730000
2016/05/02082225 Albany St Boston MaFp Permit J.C. Cannistraro Llc
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.