Building Permits at 3 Longwood Av Boston MA 02115


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 3 Longwood Av Boston MA 02115 over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Chb-biorepository- enders building floors 2-3 lab renovation.
Date:  May 22, 2012
Value:   $10,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl143939 | Parcel: 0401870002
2012/05/2210000953 Longwood Av Boston Ma 02115
SCORE
97
Install 2 av devices in the treatment room area renovation in the main building
Date:  April 25, 2012
Value:   $2,500
Contractor: William Mahoney

Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa133742 | Parcel: 0401870000
2012/04/252500973 Longwood Av Boston Ma 02115William Mahoney
SCORE
97
Install new fire alarm devices for the neurosurgery area on the hunnewell 1st and 2nd floors. Tie into existing system.
Date:  March 30, 2012
Value:   $4,000
Contractor: William Mahoney

Client: Childrens Hospital | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa127180 | Parcel: 0401870002
2012/03/304000973 Longwood Av Boston Ma 02115William Mahoney
SCORE
93
Sediment carbon water filtration system
Date:  February 29, 2012
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl121105 | Parcel: 0401870000
2012/02/29500933 Longwood Av Boston Ma 02115Mark St. Hilaire
Chb-biorepository- enders building fl. 2-3 lab renovation- demo and new .
Date:  May 22, 2012
Value:   $5,000

Permit type: Gas | Permit status: Expired | Current use: Comm | Permit id: G143942 | Parcel: 0401870002
2012/05/225000953 Longwood Av Boston Ma 02115
SCORE
100
Install one amp circuit for bi-directional amplifier from emergency panel on 6th floor of main clinical building.
Date:  March 20, 2012
Value:   $3,000

Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E125676 | Parcel: 0401870000
2012/03/2030001003 Longwood Av Boston Ma 02115Murphy Electrical And Industrial Control
Chb fegan 10- sink replacement
Date:  September 15, 2011
Value:   $1,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl95610 | Parcel: 0401870002
2011/09/151000953 Longwood Av Boston Ma 02115
Chb-sim sub basement sink add
Date:  July 28, 2011
Value:   $5,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl88237 | Parcel: 0401870002
2011/07/285000953 Longwood Av Boston Ma 02115
SCORE
97
Install new feed to vfd for an ahu on in the clinical building.
Date:  September 27, 2011
Value:   $40,000
Contractor: William Mahoney

Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E95890 | Parcel: 0401870002
2011/09/2740000973 Longwood Av Boston Ma 02115William Mahoney
SCORE
93
Installation of water filtration system. Dept of cardiology enders bldg
Date:  May 13, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl75354 | Parcel: 0401886000
2011/05/13500933 Longwood Av Boston Ma 02115Mark St. Hilaire
Add 3 lab sinks for chb pre-op clinic on fl. 1. Per engineered drawings.
Date:  November 7, 2011
Value:   $5,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl104448 | Parcel: 0401870002
2011/11/075000953 Longwood Av Boston Ma 02115
SCORE
93
Sediment carbon filtration system
Date:  July 14, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl83271 | Parcel: 0401870000
2011/07/14500933 Longwood Av Boston Ma 02115Mark St. Hilaire
SCORE
93
Installation of drinking water filtration system in the small kitchen.
Date:  February 8, 2011
Value:   $500
Contractor: Mark St. Hilaire

Client: Childrens Hosp | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl57541 | Parcel: 0401870000
2011/02/08500933 Longwood Av Boston Ma 02115Mark St. Hilaire
SCORE
93
Installation of water filtration system
Date:  May 24, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl75656 | Parcel: 0401886000
2011/05/24500933 Longwood Av Boston Ma 02115Mark St. Hilaire
SCORE
100
Install one amp circuit for bi-directional amplifier from emergency panel on 14th floor of enders building.
Date:  March 20, 2012
Value:   $3,000

Client: Childrens Hospital | Permit type: Electrical | Permit status: Expired | Current use: Other | Permit id: E125563 | Parcel: 0401870002
2012/03/2030001003 Longwood Av Boston Ma 02115Murphy Electrical And Industrial Control
Chb radiology fl. 2 renovation
Date:  December 8, 2010
Value:   $100,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl54517 | Parcel: 0401870002
2010/12/08100000953 Longwood Av Boston Ma 02115
SCORE
93
Installation of drinking water filtration system in the break room.
Date:  March 17, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl67155 | Parcel: 0401870002
2011/03/17500933 Longwood Av Boston Ma 02115Mark St. Hilaire
Install 4 dental chairs hunnewell 4
Date:  December 8, 2010
Value:   $10,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl54515 | Parcel: 0401870002
2010/12/0810000953 Longwood Av Boston Ma 02115
Chb-enders 2-11 ada bathroom reno
Date:  February 3, 2011
Value:   $5,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl62569 | Parcel: 0401870002
2011/02/035000953 Longwood Av Boston Ma 02115
SCORE
100
Remove & replace water closets for water saving project. Jfs job # 4823 smith building
Date:  January 27, 2011
Value:   $350
Contractor: Derek Shine

Client: Childrens Hosp | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl61065 | Parcel: 0401870002
2011/01/273501003 Longwood Av Boston Ma 02115Derek Shine
SCORE
99
Supply and install one - 1 volt - amp circuit to provide power to a card access system. 6th flor connector.
Date:  December 23, 2009
Value:   $885
Contractor: Richard Penney

Client: Childrens Hosp | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E2435 | Parcel: 0401870002
2009/12/23885993 Longwood Av Boston Ma 02115Richard Penney
SCORE
97
Install 3 addressable modules in the farley and bader elevator machine rooms
Date:  June 29, 2011
Value:   $5,000
Contractor: William Mahoney

Client: Childrens Hospital | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa83494 | Parcel: 0401870000
2011/06/295000973 Longwood Av Boston Ma 02115William Mahoney
SCORE
93
Install of water filtration system
Date:  March 8, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl65090 | Parcel: 0401886000
2011/03/08500933 Longwood Av Boston Ma 02115Mark St. Hilaire
SCORE
93
Sediment carbon water filtration system please note that building is located at 3 longwood ave hunnewell
Date:  October 6, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl97825 | Parcel: 0401870002
2011/10/06500933 Longwood Av Boston Ma 02115Mark St. Hilaire
SCORE
93
Install water filtration system
Date:  March 9, 2011
Value:   $500
Contractor: Mark St. Hilaire

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl65010 | Parcel: 0401870002
2011/03/09500933 Longwood Av Boston Ma 02115Mark St. Hilaire
SCORE
79
Chb aep - fegan building: plumbing renovations
Date:  July 12, 2012
Value:   $100,000
Contractor: Geraldine Hogu

Client: Childrens Hospital | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl161200 | Parcel: 0401870002
2012/07/12100000793 Longwood Av Boston Ma 02115Geraldine Hogu
SCORE
79
Chb aep - farley building (4th floor): plumbing renovations
Date:  July 12, 2012
Value:   $200,000
Contractor: Geraldine Hogu

Client: Childrens Hospital | Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl161218 | Parcel: 0401870000
2012/07/12200000793 Longwood Av Boston Ma 02115Geraldine Hogu
Chb-main- clinical treatment room upgrade- 8 new exam room sinks
Date:  August 1, 2012
Value:   $30,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl164388 | Parcel: 0401870000
2012/08/0130000953 Longwood Av Boston Ma 02115
Chb-activity room- main 1030- remove and repalce 1 sink.
Date:  August 1, 2012
Value:   $2,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl161183 | Parcel: 0401870000
2012/08/012000953 Longwood Av Boston Ma 02115
SCORE
100
Hunnewell ground floor chpcc. Controls to 4 fan coil units and 4 radiant panels. Power and controls to 3 reheat coils (1 volts).
Date:  October 2, 2012
Value:   $4,950

Client: Childrens Hosp | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E188613 | Parcel: 0401870000
2012/10/0249501003 Longwood Av Boston Ma 02115Murphy Electrical And Industrial Control
Chb-hunnewell nuerosurgery expansion- add 1 sink and 2 roof drains.
Date:  October 22, 2012
Value:   $5,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl191112 | Parcel: 0401870002
2012/10/225000953 Longwood Av Boston Ma 02115
Chb enders 5- karp 6 renovation- misc. Demo and relocation.
Date:  November 20, 2012
Value:   $1,000

Permit type: Gas | Permit status: Expired | Current use: Comm | Permit id: G201018 | Parcel: 0401870000
2012/11/201000953 Longwood Av Boston Ma 02115
Chb- enders 5- karp 6 renovation- misc. Plumbing demo and relocation.
Date:  November 20, 2012
Value:   $5,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl201017 | Parcel: 0401870000
2012/11/205000953 Longwood Av Boston Ma 02115
Chb main 4- relocate exsting piping for new equipment.
Date:  November 20, 2012
Value:   $5,000

Permit type: Plumbing | Permit status: Expired | Current use: Comm | Permit id: Pl201010 | Parcel: 0401870002
2012/11/205000953 Longwood Av Boston Ma 02115
SCORE
97
Install 1 receptacle in the bader building elevator machine room
Date:  December 18, 2012
Value:   $1,000
Contractor: William Mahoney

Client: Childrens Hosp | Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E208060 | Parcel: 0401870000
2012/12/181000973 Longwood Av Boston Ma 02115William Mahoney
SCORE
97
Install 25 temporary smoke detectors for use during construction phase of the main bullding lobby.
Date:  December 27, 2012
Value:   $6,500
Contractor: William Mahoney

Client: Childrens Hosp | Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa209960 | Parcel: 0401870002
2012/12/276500973 Longwood Av Boston Ma 02115William Mahoney
SCORE
97
Renovate fire alarm devices in the mechanical room on the 14th floor of the enders building. Demo old devices and install new.
Date:  September 27, 2013
Value:   $3,500
Contractor: William Mahoney

Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa286088 | Parcel: 0401870000
2013/09/273500973 Longwood Av Boston Ma 02115William Mahoney
SCORE
97
Install one new fire alarm visual audio device in room fa304
Date:  December 23, 2013
Value:   $1,000
Contractor: William Mahoney

Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa312241 | Parcel: 0401870002
2013/12/231000973 Longwood Av Boston Ma 02115William Mahoney
SCORE
97
Demolition of smoke duct detector and test station and installation of a smoke duct detector
Date:  February 26, 2014
Value:   $2,500
Contractor: William Mahoney

Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa339771 | Parcel: 0401886000
2014/02/262500973 Longwood Av Boston Ma 02115William Mahoney
SCORE
100
1 st floor
Date:  March 20, 2014
Value:   $4,000
Contractor: Karen Sykes

Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv343179 | Parcel: 0401870000
2014/03/2040001003 Longwood Av Boston Ma 02115Karen Sykes
SCORE
96
Replace smoke detectors where ceiling is being replaced in fegan basement.
Date:  March 28, 2014
Value:   $5,000
Contractor: Michael Lawlor

Permit type: Fire alarm | Permit status: Expired | Current use: Other | Permit id: Efa347682 | Parcel: 0401870002
2014/03/285000963 Longwood Av Boston Ma 02115Michael Lawlor
SCORE
96
Replace smoke detectors where ceiling is being replaced in corridor between farley & bader bldgs. On the 2nd floor.
Date:  March 28, 2014
Value:   $5,000
Contractor: Michael Lawlor

Client: Childrens Hosp | Permit type: Fire alarm | Permit status: Expired | Current use: Other | Permit id: Efa347676 | Parcel: 0401870002
2014/03/285000963 Longwood Av Boston Ma 02115Michael Lawlor
SCORE
100
Additon to permit # pl490268 which water closet for 8th floor was omitted in error. Renovation of 5 toilet rooms.
Date:  July 20, 2015
Value:   $30,000
Contractor: Joseph Clancy

Client: Childrens Hospital | Permit type: Plumbing | Permit status: Open | Current use: Other | Permit id: Pl494962 | Parcel: 0401870002
2015/07/20300001003 Longwood Av Boston Ma 02115Joseph Clancy
SCORE
69
Boston childrens hospital - oxygen tank farm - karp building -; installation of;two;new 9 0 gallon;liquid oxygen storage tanks for hospital use. Work involves installation of a new;tank farm concrete pad with new perimeter fencing.; all associated electrical and plumbing work.; installation of new medical gas alarms and security alarms.;new oxygen piping will run throughout the entire hospital campus with connections to all buildings. New oxygen tank farm is on the exterior of the building located between the parking garage for 333 longwood ave;and the karp building.
Date:  September 18, 2015
Value:   $784,000
Contractor: Lawrence Blackall

Client: Childrens Hospital | Permit type: Interior/exterior work | Permit status: Open | Current use: Other | Permit id: Alt492937 | Parcel: 0401870002
2015/09/18784000693 Longwood Av Boston Ma 02115Lawrence Blackall
884051 - 3 longwood avenue - demo only. Demolition of existing water piping in the basement and first floor per engineer drawings.
Date:  September 24, 2015
Value:   $3,000

Permit type: Demolition - interio | Permit status: Open | Current use: Other | Permit id: Pl522852 | Parcel: 0401870002
2015/09/243000953 Longwood Av Boston Ma 02115
3555 - remove and replace (1) water closet (1) lav sink and (2) hand sinks on the first floor at 3 longwood avenue per engineer drawings.
Date:  October 5, 2015
Value:   $5,000

Permit type: Plumbing | Permit status: Open | Current use: Other | Permit id: Pl525607 | Parcel: 0401870000
2015/10/055000953 Longwood Av Boston Ma 02115
Small renovation of an interior office area. Includes selective demo minor mep upgrades new carpet and paint.
Date:  November 18, 2015
Value:   $156,426

Permit type: Fast track applicati | Permit status: Open | Current use: Comm | Permit id: Sf529015 | Parcel: 0401870000
2015/11/18156426953 Longwood Av Boston Ma 02115
SCORE
69
Childrens hospital - farley building -; preparatory roof demolition then replacing an indoor cooling tower presently located in the sub basement with a dry cooler that will be located on the roof.; replace existing compressor rack system
Date:  November 20, 2015
Value:   $2,027,034
Contractor: Lawrence Blackall

Client: Childrens Hospital | Permit type: Interior/exterior work | Permit status: Open | Current use: Comm | Permit id: Alt519330 | Parcel: 0401870000
2015/11/202027034693 Longwood Av Boston Ma 02115Lawrence Blackall
SCORE
69
Childrens hospital - clinical building -;subbasement basement &; floors 1 - 4.; relocation of existing operations center ( ops ) equipment. Work includes rework of fire protection demo and install of new partitions electrical medical gas monitoring equipment new fire alarm devices and remote monitoring and new finishes.;
Date:  December 15, 2015
Value:   $2,412,000
Contractor: Lawrence Blackall

Client: Childrens Hospital | Permit type: Renovations -interior nsc | Permit status: Open | Current use: Other | Permit id: Alt507578 | Parcel: 0401870000
2015/12/152412000693 Longwood Av Boston Ma 02115Lawrence Blackall
Soldering associated with maintenance repair of various mechanical and hvac systems
Date:  October 23, 2014

Permit status: Na | Permit id: Cbw413886 | Parcel: 0401870000
2014/10/230953 Longwood Av Boston Ma 02115
Installation of inte
Date:  August 13, 2013

Permit status: Na | Permit id: Chm273853 | Parcel: 0401870002
2013/08/130953 Longwood Av Boston Ma 02115
Cutting welding &; burning for work associated with maintenancerepair of various mechanical systems bfd paid detail required
Date:  December 16, 2011

Permit status: Na | Permit id: Cbw108867 | Parcel: 0401870002
2011/12/160953 Longwood Av Boston Ma 02115
Relocate sprinkler heads on floors 1-11.
Date:  June 17, 2013

Permit status: Na | Permit id: Sprk246806 | Parcel: 0401870000
2013/06/170953 Longwood Av Boston Ma 02115
Relocate 35 wet sprinkler heads in existing building. Work to be done per nfpa stands. 7 cmr one floor zone at a time.
Date:  May 28, 2014

Permit status: Na | Permit id: Sprk361475 | Parcel: 0401870000
2014/05/280953 Longwood Av Boston Ma 02115
Bch main lobby - renovation [hase 2 seq. 3 - perm smokes &; temp heats; ~; doc# 20140905
Date:  July 7, 2014

Permit status: Na | Permit id: Bfdf380252 | Parcel: 0401870002
2014/07/070953 Longwood Av Boston Ma 02115
Cutting burning for installation of steel window frames for new construction bfd paid detail required
Date:  September 25, 2012

Permit status: Na | Permit id: Cbw184607 | Parcel: 0401870000
2012/09/250953 Longwood Av Boston Ma 02115
Bch main lobby renovation phase 2 seq 1 perm smokes &; temp heats previously submitted; ~; doc# 20140667
Date:  July 7, 2014

Permit status: Na | Permit id: Bfdf366822 | Parcel: 0401870000
2014/07/070953 Longwood Av Boston Ma 02115
Cutting burning soldering associated with maintenance repair of hot chilled water systems bfd paid detail required
Date:  May 29, 2014

Permit status: Na | Permit id: Cbw366296 | Parcel: 0401870002
2014/05/290953 Longwood Av Boston Ma 02115
Cutting &; welding for maintenance &; minor alterations to include relocation &; cap of existing steam pipe (dpl) bfd paid detail required
Date:  September 7, 2010

Permit status: Na | Permit id: Cbw40856 | Parcel: 0401870002
2010/09/070953 Longwood Av Boston Ma 02115
Cutting burning &; welding of support steel steel members &; exhaust piping (dpl) bfd paid detail required
Date:  July 22, 2015

Permit status: Na | Permit id: Cbw496731 | Parcel: 0401870000
2015/07/220953 Longwood Av Boston Ma 02115
Coordinate sprinkler impairment with building managment so that only one floors is impaired within the building at any given time.
Date:  August 20, 2012

Permit status: Na | Permit id: Sprk171638 | Parcel: 0401870000
2012/08/200953 Longwood Av Boston Ma 02115
Relocate; sprinkler heads for new office renovation per engineered drawings.
Date:  May 15, 2012

Permit status: Na | Permit id: Sprk136816 | Parcel: 0401870000
2012/05/150953 Longwood Av Boston Ma 02115
Cutting burning welding for installation of structural steel framing and metal deck for the infill of existing elevator (dpl) bfd paid detail required
Date:  November 14, 2013

Permit status: Na | Permit id: Cbw301581 | Parcel: 0401870000
2013/11/140953 Longwood Av Boston Ma 02115
Installation inaccordance with nfpa 13 and 7 cmr
Date:  June 2, 2014

Permit status: Na | Permit id: Sprk363233 | Parcel: 0401870002
2014/06/020953 Longwood Av Boston Ma 02115
Installation of inte
Date:  October 10, 2013

Permit status: Na | Permit id: Chm294479 | Parcel: 0401870002
2013/10/100953 Longwood Av Boston Ma 02115
SCORE
92
Up-grade bumx panel; ~; doc# 20111088
Date:  December 5, 2011

Permit status: Na | Permit id: Bfdf99738 | Parcel: 0401870002
2011/12/050923 Longwood Av Boston Ma 02115Daniel Murphy Electrical
Bfd paid detail required phase 1 details: 2 pumper trucks 2 officers 8 firefighters one district chief and one fire prevention officer. Phase 2 details:1 pumper trucks ;1 officers;4 firefighters one fire prevention officer. Phase;3 details: 2 pumper trucks 2 officers 8 firefighters one district chief one fire prevention officer. Detail office # 617-343-2836... For fire prevention officer call # 617-343-3034
Date:  March 4, 2014

Permit status: Na | Permit id: Sprk325355 | Parcel: 0401870002
2014/03/040953 Longwood Av Boston Ma 02115
Tenant refit of (32) heads 1st floor
Date:  September 8, 2010

Permit status: Na | Permit id: Sprk41257 | Parcel: 0401870002
2010/09/080953 Longwood Av Boston Ma 02115
Installation of inte
Date:  January 30, 2014

Permit status: Na | Permit id: Chm323404 | Parcel: 0401870002
2014/01/300953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 4b. Doc#20130773
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259484 | Parcel: 0401870002
2013/07/160953 Longwood Av Boston Ma 02115
Place of assembly for the enders auditorium for 218 persons as follows: bench seating-182 persons;chairs- persons; platform chairs-5 persons; platform standing- 11 persons;
Date:  December 26, 2012

Permit status: Na | Permit id: Tpla162530 | Parcel: 0401886000
2012/12/260953 Longwood Av Boston Ma 02115
Relocating 4 heads on an existing system to accommodate ceiling renovations. Work to be done one floor zone at a time per nfpa stands.
Date:  October 13, 2011

Permit status: Na | Permit id: Sprk98537 | Parcel: 0401870000
2011/10/130953 Longwood Av Boston Ma 02115
Date:  January 6, 2015

Permit status: Na | Permit id: Aspce438772 | Parcel: 0401870000
2015/01/060953 Longwood Av Boston Ma 02115
Sequence(1) consists of an area of 1 428sf of area located on level 1. 9 new sprinkler headslines will be installed in this location as part of phase 2 of the main lobby renovations as per nfpa13 &; cmr780. Work is to be performed one sequence at a time.
Date:  June 27, 2013

Permit status: Na | Permit id: Sprk254257 | Parcel: 0401870000
2013/06/270953 Longwood Av Boston Ma 02115
The renovated space will;be protected by a new wet pipe sprinkler system - 1 heads.; the existing system will be removed prior to the full installation of the aforementioned new system.
Date:  May 31, 2013

Permit status: Na | Permit id: Sprk223995 | Parcel: 0401870000
2013/05/310953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems @ farley pavillion bldg
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79126 | Parcel: 0401870000
2011/06/030953 Longwood Av Boston Ma 02115
Rough in and install new upright sprinkler system.; perform one day test and tie-in of new upright system demo existing pendent system.; upright system to be dropped to accommodate new ceiling grid.; (farley building)
Date:  December 17, 2014

Permit status: Na | Permit id: Sprk425350 | Parcel: 0401870002
2014/12/170953 Longwood Av Boston Ma 02115
Temporary bagging of smoke detectors for dust control during renovation work
Date:  March 8, 2013

Permit status: Na | Permit id: Bsd222064 | Parcel: 0401870000
2013/03/080953 Longwood Av Boston Ma 02115
Add (2) avs to existing dining area being renovated in basement; ~; doc# 20131296
Date:  March 13, 2014

Permit status: Na | Permit id: Bfdf300841 | Parcel: 0401870002
2014/03/130953 Longwood Av Boston Ma 02115
Impairment shall be limited to the fegan building
Date:  February 25, 2014

Permit status: Na | Permit id: Sprk326674 | Parcel: 0401870000
2014/02/250953 Longwood Av Boston Ma 02115
Cutting burning &; welding ;for installation of hvac piping for new construction of elevator tower paid fire detail required now;an existing bldg per order dfc charles mitchell;
Date:  January 20, 2012

Permit status: Na | Permit id: Cbw114458 | Parcel: 0401870002
2012/01/200953 Longwood Av Boston Ma 02115
84069wal-extend circuits for 2 av devices located in the sub-basement of main building doc20120607
Date:  May 25, 2012

Permit status: Na | Permit id: Bfdf142318 | Parcel: 0401870002
2012/05/250953 Longwood Av Boston Ma 02115
Hunnewell bldg-sprinkler route. Drill holes in plaster wallsceiling and plaster wall opening-rmshallway
Date:  March 19, 2015

Permit status: Na | Permit id: Asb455179 | Parcel: 0401870000
2015/03/190953 Longwood Av Boston Ma 02115
Relocate existing sprinkler line around new mechanical electrical equipment; being installed. Work to be done per nfpa stands. One floor zone at a time. No patient occupancy in impaired zone.
Date:  March 30, 2012

Permit status: Na | Permit id: Sprk124027 | Parcel: 0401870002
2012/03/300953 Longwood Av Boston Ma 02115
Cutting &; welding;to tie in hws &; hwr pipes bfd paid detail required
Date:  April 27, 2010

Permit status: Na | Permit id: Cbw22702 | Parcel: 0401870002
2010/04/270953 Longwood Av Boston Ma 02115
Existing fa system will be modified due to minor renovations to the 2nd fl of the afcc pavilion bldg will be installing temp heat detectors for temp fire protection during construction
Date:  April 10, 2012

Permit status: Na | Permit id: Bfdf130341 | Parcel: 0401870002
2012/04/100953 Longwood Av Boston Ma 02115
Welding only for installation of new door @ fegan loading dock (dpl)
Date:  April 11, 2011

Permit status: Na | Permit id: Cbw71191 | Parcel: 0401870002
2011/04/110953 Longwood Av Boston Ma 02115
Cuttingweldingburning for installation of hvac systems in main lobby dpl63015 bfd paid detail required
Date:  May 11, 2015

Permit status: Na | Permit id: Cbw470611 | Parcel: 0401870000
2015/05/110953 Longwood Av Boston Ma 02115
Grinding burning &; welding for installation of new roofing support structure &; connect newexisting steel (dpl) bfd paid detail required
Date:  March 15, 2013

Permit status: Na | Permit id: Cbw226428 | Parcel: 0401870002
2013/03/150953 Longwood Av Boston Ma 02115
Relocating (11) heads on an existing system to accomodate ceiling renovations.;work to be done one floor zone at a time per nfpa stands. 7 cmr. No patients in impaired zone.
Date:  August 21, 2012

Permit status: Na | Permit id: Sprk172592 | Parcel: 0401870000
2012/08/210953 Longwood Av Boston Ma 02115
Installation/evaluat
Date:  August 21, 2013

Permit status: Na | Permit id: Chm277494 | Parcel: 0401870002
2013/08/210953 Longwood Av Boston Ma 02115
Installation of upho
Date:  April 9, 2013

Permit status: Na | Current use: Comm | Permit id: Chm195480 | Parcel: 0401870002
2013/04/090953 Longwood Av Boston Ma 02115
Renovations to include ceiling painting floor and millwork
Date:  May 8, 2012

Permit status: Na | Permit id: Fdc139019 | Parcel: 0401870000
2012/05/080953 Longwood Av Boston Ma 02115
Impairment shall be limited to one floor at any given time within the building. Installation in accordance with the requiments of 7 cmr and nfpa 13
Date:  July 15, 2014

Permit status: Na | Permit id: Sprk376581 | Parcel: 0401870000
2014/07/150953 Longwood Av Boston Ma 02115
Cutting &;welding;associated with maintenancerepair of hvac;piping systems bfd paid detail required
Date:  December 16, 2011

Permit status: Na | Permit id: Cbw108890 | Parcel: 0401870002
2011/12/160953 Longwood Av Boston Ma 02115
Contractor shall coordinate impairment with building owner so that only one floor is impaired at any given time.
Date:  October 23, 2012

Permit status: Na | Permit id: Sprk148100 | Parcel: 0401870002
2012/10/230953 Longwood Av Boston Ma 02115
Add strobe and relocate av in small renovation in 6th floor of pavillion building.
Date:  April 3, 2013

Permit status: Na | Permit id: Bfdf220266 | Parcel: 0401870002
2013/04/030953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 1b. Doc#20130769
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259465 | Parcel: 0401870002
2013/07/160953 Longwood Av Boston Ma 02115
"soldering only" associated with maintenance of various mechanical systems @ main bldg
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459249 | Parcel: 0401870002
2015/04/070953 Longwood Av Boston Ma 02115
Demo &; renovation of fire alarm devices on the 5th floor of the pavilion building. Doc#20141109
Date:  August 26, 2014

Permit status: Na | Permit id: Bfdf393211 | Parcel: 0401870002
2014/08/260953 Longwood Av Boston Ma 02115
Cutting &; welding for the installation of a replacement heat exchanger and associated piping &; valves (dpl) bfd paid detail required
Date:  August 15, 2011

Permit status: Na | Permit id: Cbw90265 | Parcel: 0401870002
2011/08/150953 Longwood Av Boston Ma 02115
Playroom ~ relocate 58 sprinkler heads on floors 6-7-8-9-10. Work to be done one floor zone at a time. Per nfpa stands. 7 cmr.; no occupancy in impaired zone.
Date:  October 31, 2013

Permit status: Na | Permit id: Sprk293760 | Parcel: 0401870002
2013/10/310953 Longwood Av Boston Ma 02115
Install temp heats in rm 2 232 for const install perminate devices in rm 2 232 doc20131217
Date:  March 13, 2014

Permit status: Na | Permit id: Bfdf296183 | Parcel: 0401870000
2014/03/130953 Longwood Av Boston Ma 02115
Demo lines &; re-pipe to include relocating (10) sprinkler heads to accomodate new ceiling(s) layout in playroom-905 &; patient room-921. Work to be done per nfpa stands. 7 cmr. Work to be done one floor zone at a time. No patient occupancy in impaired floor.
Date:  March 20, 2014

Permit status: Na | Permit id: Sprk341259 | Parcel: 0401870002
2014/03/200953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems in;enders;bldg
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55618 | Parcel: 0401886000
2010/12/160953 Longwood Av Boston Ma 02115
Soldering of hvac piping systems;@ fegan bldg tank stored on site
Date:  May 20, 2010

Permit status: Na | Permit id: Cbw25549 | Parcel: 0401870002
2010/05/200953 Longwood Av Boston Ma 02115
Renovation of bathrooms throughout farley building @ childrens hosp.; add 23 strobe onlys to appropriate bathrooms; ~; doc# 20141767 work to be done per nfpa stands 7 cmr.
Date:  February 17, 2015

Permit status: Na | Permit id: Bfdf437203 | Parcel: 0401870000
2015/02/170953 Longwood Av Boston Ma 02115
Soldering for maintenance repair of hvac piping systems
Date:  November 24, 2010

Permit status: Na | Permit id: Cbw50842 | Parcel: 0401870000
2010/11/240953 Longwood Av Boston Ma 02115
Bch main lobby renovation phase 2 seq 6 perm smokes &; temp heats previously submitted; ~; doc# 20140665
Date:  July 7, 2014

Permit status: Na | Permit id: Bfdf366849 | Parcel: 0401870002
2014/07/070953 Longwood Av Boston Ma 02115
A seperate permit to installed temporary heat detectors will be required.
Date:  August 15, 2011

Permit status: Na | Permit id: Bfdf87245 | Parcel: 0401870002
2011/08/150953 Longwood Av Boston Ma 02115
Installation of inte
Date:  December 27, 2012

Permit status: Na | Permit id: Chm209746 | Parcel: 0401870002
2012/12/270953 Longwood Av Boston Ma 02115
Cpd dept pv-036 &; pv-037
Date:  August 22, 2014

Permit status: Na | Permit id: Asb399282 | Parcel: 0401870000
2014/08/220953 Longwood Av Boston Ma 02115
Suite bd-114 removal of plaster walls (containing acm joint compound)
Date:  July 27, 2015

Permit status: Na | Permit id: Asb498296 | Parcel: 0401870002
2015/07/270953 Longwood Av Boston Ma 02115
Install 1 new master box &; relocate 1 master box.; install new beacons (all campus buildings) 2 new annunciators and 2 new smoke detectors.; install new signage for beacons.; ~; doc# 20141030
Date:  August 4, 2014

Permit status: Na | Permit id: Bfdf388479 | Parcel: 0401870002
2014/08/040953 Longwood Av Boston Ma 02115
Phase 2 sequence;4 consists of;692sf renovation located on level 1 installation in this sequence include;7 new sprinkler heads and lines. To be installed per nfpa13 &; cmr780. Main lobby renovations. Work is to be performed one sequence at a time.
Date:  June 27, 2013

Permit status: Na | Permit id: Sprk254270 | Parcel: 0401870000
2013/06/270953 Longwood Av Boston Ma 02115
Date:  November 19, 2014

Permit status: Na | Permit id: Aspce427182 | Parcel: 0401870002
2014/11/190953 Longwood Av Boston Ma 02115
Misc restroom renovations service basement 6&; only 15 rear relocate
Date:  June 9, 2012

Permit status: Na | Permit id: Sprk143672 | Parcel: 0401870000
2012/06/090953 Longwood Av Boston Ma 02115
Only one floor impaired at any given time
Date:  October 23, 2012

Permit status: Na | Permit id: Sprk148078 | Parcel: 0401870000
2012/10/230953 Longwood Av Boston Ma 02115
Cutting burning welding for repair maintenance and minor alterations to mechanical system including removal and replacement of condensate pumps (dpl) bfd paid detail required
Date:  September 23, 2010

Permit status: Na | Permit id: Cbw43171 | Parcel: 0401870002
2010/09/230953 Longwood Av Boston Ma 02115
Cutting burning &; welding;for removalreplace condensate pump in enders bldg (dpl) bfd paid detail required
Date:  July 14, 2011

Permit status: Na | Permit id: Cbw84188 | Parcel: 0401870002
2011/07/140953 Longwood Av Boston Ma 02115
Cutting burning &; welding for the installation of misc &; structural steel operations for main lobby;(dpl) bfd paid detail required
Date:  September 6, 2013

Permit status: Na | Permit id: Cbw282824 | Parcel: 0401870002
2013/09/060953 Longwood Av Boston Ma 02115
Existing fa system will be modified because of minor renovations to the 2nd fl of the afcc pavilion bldg we will be re-using existing devices and installing new devices doc20120371
Date:  April 10, 2012

Permit status: Na | Permit id: Bfdf130368 | Parcel: 0401870002
2012/04/100953 Longwood Av Boston Ma 02115
Removal and re-installation of existing fire alarm equiptment;16 units no new equiptment installed doc20121072
Date:  October 4, 2012

Permit status: Na | Permit id: Bfdf182214 | Parcel: 0401870000
2012/10/040953 Longwood Av Boston Ma 02115
Renovation of 4th floor space at bch fhrley building. Heats and tie into existing new devices. Doc#20141060
Date:  August 1, 2014

Permit status: Na | Permit id: Bfdf373910 | Parcel: 0401870000
2014/08/010953 Longwood Av Boston Ma 02115
Renovation to basement mail room in fegan bldg. ~; doc# 20140298
Date:  May 29, 2014

Permit status: Na | Permit id: Bfdf341866 | Parcel: 0401870002
2014/05/290953 Longwood Av Boston Ma 02115
Cutting &;welding associated with maintenancerepair of various mechanical systems bfd paid detail required
Date:  December 16, 2011

Permit status: Na | Permit id: Cbw108881 | Parcel: 0401870002
2011/12/160953 Longwood Av Boston Ma 02115
Welding &; burnnig of ductwork in pavillion bldg (dpl 8-31-2014); bfd paid detail required
Date:  May 8, 2014

Permit status: Na | Permit id: Cbw358008 | Parcel: 0401870002
2014/05/080953 Longwood Av Boston Ma 02115
Welding;to repair maintenance &; mnor alterations to the mechanical system (dpl) bfd paid detail required
Date:  November 18, 2010

Permit status: Na | Permit id: Cbw52030 | Parcel: 0401870002
2010/11/180953 Longwood Av Boston Ma 02115
Cutting welding &; burning for work associated with maintenancerepair of various mechanical systems bfd paid detail required
Date:  December 16, 2011

Permit status: Na | Permit id: Cbw108879 | Parcel: 0401870002
2011/12/160953 Longwood Av Boston Ma 02115
Bch main lobby renovation - phase 2 seq. 4 perm smokes &; temp heats fegan bldg.; ~; doc# 20140976
Date:  July 17, 2014

Permit status: Na | Permit id: Bfdf384732 | Parcel: 0401870000
2014/07/170953 Longwood Av Boston Ma 02115
Relocate 53 sprinkler heads in main restrooms on floors #1-9 to accommodate new ceiling layout. Installtion per nfpa13 and 780cmr. One floor zone at a time. No occupancy in impaired areas.
Date:  January 28, 2014

Permit status: Na | Permit id: Sprk319623 | Parcel: 0401870002
2014/01/280953 Longwood Av Boston Ma 02115
Hunnewellpav bldg-bathroom project. Rmvl of plaster wallsceilings and floor tilemastic patientnon patient
Date:  January 29, 2015

Permit status: Na | Permit id: Asb444555 | Parcel: 0401870002
2015/01/290953 Longwood Av Boston Ma 02115
SCORE
92
Rework of storage room to champs training room fa060.; install 1 av unit; 1 smoke detector; 1 duct smoke and 3 monitor modules for fire smoke damper.; ~; doc# 20141650
Date:  January 6, 2015

Permit status: Na | Permit id: Bfdf432451 | Parcel: 0401870002
2015/01/060923 Longwood Av Boston Ma 02115Daniel Murphy Electrical
Bch main bldg lobby renovation phase 2 seq 5 perm smokes - temp heats; ~; doc# 20140906
Date:  July 7, 2014

Permit status: Na | Permit id: Bfdf380256 | Parcel: 0401870000
2014/07/070953 Longwood Av Boston Ma 02115
Relocate (2) pendent sprinklers on 10th floor.; work to be done one floor zone at a time per nfpa stands. No occupancy in impaired zone.
Date:  June 22, 2011

Permit status: Na | Permit id: Sprk82224 | Parcel: 0401870002
2011/06/220953 Longwood Av Boston Ma 02115
Cutting burning soldering associated with maintenance repair of hotchilled water systems bfd paid detail required
Date:  May 29, 2014

Permit status: Na | Permit id: Cbw366294 | Parcel: 0401870000
2014/05/290953 Longwood Av Boston Ma 02115
Open flame for a demonstration on how to extinguish a patient fire in surgery. Bfd paid detail required
Date:  November 26, 2013

Permit type: Special effects | Permit status: Na | Permit id: Gp199966 | Parcel: 0401870000
2013/11/260953 Longwood Av Boston Ma 02115
Welding for installation of (2) flange beams connecting to existing steel structure and metal floor deck to infill stair (dpl 1212) bfd paid detail required
Date:  August 9, 2011

Permit status: Na | Permit id: Cbw87703 | Parcel: 0401870000
2011/08/090953 Longwood Av Boston Ma 02115
Soldering only;associated with maintenancerepair of various mechanical systems @;main bldg
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30744 | Parcel: 0401870002
2010/06/290953 Longwood Av Boston Ma 02115
Hunnewell bldghu-129&;sb: floor tile and associated masticdrill holes in plaster walls
Date:  May 8, 2014

Permit status: Na | Permit id: Asb360054 | Parcel: 0401870002
2014/05/080953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 1a. Doc#20130768
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259462 | Parcel: 0401870002
2013/07/160953 Longwood Av Boston Ma 02115
Relocate 13 heads for new tenant on 2nd floor
Date:  March 4, 2013

Permit status: Na | Permit id: Sprk220778 | Parcel: 0401870002
2013/03/040953 Longwood Av Boston Ma 02115
Relocate sprinkler heads on 4th fl. Work to be done per nfpa stands 7 cmr. One floor zone at a time.
Date:  October 22, 2013

Permit status: Na | Permit id: Sprk291943 | Parcel: 0401870002
2013/10/220953 Longwood Av Boston Ma 02115
Re-design and repairs to sidewalk area at childrens hospital; 48 x 8; ;47 x 8 and 35 x 8; ; sidewalk deposit will be returned if restored sidewalk meets city spec.; permit fee 60. 00; inspection:; 200. 00; deposit:; ;7 392. 00
Date:  August 1, 2012

Permit type: Sidewalk deposit | Permit status: Na | Permit id: Sdep-168215 | Parcel: 0401870000
2012/08/010953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems @;hunnewell bldg
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79137 | Parcel: 0401870002
2011/06/030953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems in;hunnewell;bldg
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55611 | Parcel: 0401870000
2010/12/160953 Longwood Av Boston Ma 02115
Install temp. And permanent fire alarm devices for temp. On-call rooms on the 7th floor of main building. Doc#20130525 ; permit valid for permanent devices only!
Date:  May 21, 2013

Permit status: Na | Permit id: Bfdf240221 | Parcel: 0401870000
2013/05/210953 Longwood Av Boston Ma 02115
Coordinate impairment with building management so that only one floor is impaired at any given time
Date:  May 31, 2013

Permit status: Na | Permit id: Sprk243572 | Parcel: 0401870000
2013/05/310953 Longwood Av Boston Ma 02115
Construct new 13-story elevator tower
Date:  July 31, 2012

Permit status: Na | Permit id: Fdc166835 | Parcel: 0401870000
2012/07/310953 Longwood Av Boston Ma 02115
Install new 6" combination standpipe &; 2" drain riser by cte system.; new fcvas &; fdvs will be installed on each floor.; new fcvas will provide protection in adjacent vent shaft.; work to be done per nfpa stand. Bfd paid detail required ~ 1 officer &; 3 firefighters wpump
Date:  October 28, 2011

Permit status: Na | Permit id: Sprk100922 | Parcel: 0401870002
2011/10/280953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems @;main bldg
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79136 | Parcel: 0401870002
2011/06/030953 Longwood Av Boston Ma 02115
Phase 2 sequence;6 consists of 1 411sf of space renovation located on level 1. Installation in this sequence include; new sprinkler heads and lines. To be installed per nfpa13 &; cmr780. Main lobby renovations. Work is to be performed one sequence at a time.
Date:  June 27, 2013

Permit status: Na | Permit id: Sprk254289 | Parcel: 0401870000
2013/06/270953 Longwood Av Boston Ma 02115
Cutting &; welding of new stainless steel ductwork mains &; branches in enders arch &; cage wash area bfd paid detail required
Date:  December 13, 2012

Permit status: Na | Permit id: Cbw207401 | Parcel: 0401870000
2012/12/130953 Longwood Av Boston Ma 02115
Cutting burning &; welding;to replace old generator exhaust stacks with new steel units fans ;associated stacks;andor hoods (dpl) to include roof levels en-r5 &; en-rs enders research lab bldg. Bfd paid detail required
Date:  February 9, 2010

Permit status: Na | Permit id: Cbw13843 | Parcel: 0401870002
2010/02/090953 Longwood Av Boston Ma 02115
Cutting burning welding for installation of hvac to include ductwork and piping (dpl) bfd paid detail required
Date:  June 4, 2012

Permit status: Na | Permit id: Cbw145202 | Parcel: 0401870000
2012/06/040953 Longwood Av Boston Ma 02115
Arm over (12) pendent sprinkler heads in the sub-basement stat room.; relocate sprinklers to accommodate new ceiling &; partition lay-out. Work to be done one floor zone at a time. Per nfpa stands. 7 cmr.;no patient occupancy in impaired zone.
Date:  February 14, 2012

Permit status: Na | Permit id: Sprk114111 | Parcel: 0401870002
2012/02/140953 Longwood Av Boston Ma 02115
Special effects for the productionperformances of: small fire demonstration to show what a surgical fire looks like bfd paid detail required
Date:  December 2, 2014

Permit type: Special effects | Permit status: Na | Permit id: Gp412480 | Parcel: 0401870002
2014/12/020953 Longwood Av Boston Ma 02115
Main building. Electric room (ma-0003)removal of red duct seam sealant
Date:  November 26, 2014

Permit status: Na | Permit id: Asb428243 | Parcel: 0401870000
2014/11/260953 Longwood Av Boston Ma 02115
Burning &; welding of elevator equipment in elevator machine room; (dpl) bfd paid detail required
Date:  August 30, 2012

Permit status: Na | Permit id: Cbw176172 | Parcel: 0401870000
2012/08/300953 Longwood Av Boston Ma 02115
Renovation of sub-basement hunnewell electrical vault &; rooms consisting of adding 2 smokes and 1 aiv; ~; doc# 20140266
Date:  March 10, 2014

Permit status: Na | Permit id: Bfdf341954 | Parcel: 0401870000
2014/03/100953 Longwood Av Boston Ma 02115
Installation of temporary heat detectors during the demo and construction phases of the project.; to be removed after construction; ~; doc# 20140957
Date:  July 14, 2014

Permit status: Na | Permit id: Bfdf383097 | Parcel: 0401870002
2014/07/140953 Longwood Av Boston Ma 02115
Impairment limited to 5000;sf of 1st floor no other floor shall be impaired during this construction
Date:  April 3, 2012

Permit status: Na | Permit id: Sprk126567 | Parcel: 0401870002
2012/04/030953 Longwood Av Boston Ma 02115
Cutting burning &; welding for installation of hvac systems (dpl) 2-firefighter;bfd paid detail required
Date:  March 19, 2013

Permit status: Na | Permit id: Cbw227173 | Parcel: 0401870002
2013/03/190953 Longwood Av Boston Ma 02115
Brazing of pipe for installation of new oxygen piping (work to take place between karp bld -1 black fan circle; &; 333 longwood; ave garage );dpl42016 bfd paid detail required
Date:  June 15, 2015

Permit status: Na | Permit id: Cbw481126 | Parcel: 0401870000
2015/06/150953 Longwood Av Boston Ma 02115
Brazing for installation of medical gas piping system for plumbing work bfd paid detail required
Date:  May 31, 2012

Permit status: Na | Permit id: Cbw144651 | Parcel: 0401870002
2012/05/310953 Longwood Av Boston Ma 02115
"soldering only";of pipe associated with maintenance of various mechanical systems;@;farley pavilllion bldg
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459270 | Parcel: 0401870002
2015/04/070953 Longwood Av Boston Ma 02115
Modify existing fire alarm system in hunnewell bldg of childrens hosp. As part of scope for ahu east ventilation project.; ~; doc # 20111125
Date:  November 8, 2011

Permit status: Na | Permit id: Bfdf101811 | Parcel: 0401870002
2011/11/080953 Longwood Av Boston Ma 02115
Install manhole drain relay; 35 x 6 &; 12 x 12 rdwy; # 1399640701068; ds 2014-190-6976; bch to be responsible for paving &; ramp upgrade work no guaranteed street;charge to bwsc
Date:  May 23, 2014

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-363047 | Parcel: 0401870000
2014/05/230953 Longwood Av Boston Ma 02115
Installation of upho
Date:  July 7, 2012

Permit status: Na | Permit id: Chm160384 | Parcel: 0401870002
2012/07/070953 Longwood Av Boston Ma 02115
Install a new smoke detector and remote alarm indicator in the basement level of the farley building; ~; doc# 20141570
Date:  January 6, 2015

Permit status: Na | Permit id: Bfdf426384 | Parcel: 0401870000
2015/01/060953 Longwood Av Boston Ma 02115
Coordinate all impairment with building managment
Date:  January 7, 2013

Permit status: Na | Permit id: Bfdf204093 | Parcel: 0401870002
2013/01/070953 Longwood Av Boston Ma 02115
Pipe 168 heads on an existing system to accodomate ceiling renovations demo pre-existing heads following tie in of new line piping. Work to be done one floor zone at a time. Per nfpa stands. 7 cmr. No patient occupancy in impaired zone.
Date:  July 12, 2012

Permit status: Na | Permit id: Sprk159307 | Parcel: 0401870002
2012/07/120953 Longwood Av Boston Ma 02115
Installation of (3) tamper switches &; (3) water flow switches; ~; doc# 20131365 on floors 2 and 3. Work to be done per nfpa stands. 7 cmr.
Date:  December 19, 2013

Permit status: Na | Permit id: Bfdf303759 | Parcel: 0401870000
2013/12/190953 Longwood Av Boston Ma 02115
Renovated fire alarm in rm hv246 doc20120634
Date:  June 14, 2012

Permit status: Na | Permit id: Bfdf144316 | Parcel: 0401870000
2012/06/140953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 6. Doc#20130775
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259491 | Parcel: 0401870002
2013/07/160953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 3. Doc#20130772
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259479 | Parcel: 0401870000
2013/07/160953 Longwood Av Boston Ma 02115
Adding (2) sprinkler heads for new room layout sub-basement
Date:  July 22, 2010

Permit status: Na | Permit id: Sprk34057 | Parcel: 0401870000
2010/07/220953 Longwood Av Boston Ma 02115
Farley bldg-restroom projects
Date:  May 8, 2014

Permit status: Na | Permit id: Asb360079 | Parcel: 0401870002
2014/05/080953 Longwood Av Boston Ma 02115
Bch main lobby renovation phase 1 sequence;1 permanent system 1 ~ doc# 20141056
Date:  August 4, 2014

Permit status: Na | Permit id: Bfdf390622 | Parcel: 0401870000
2014/08/040953 Longwood Av Boston Ma 02115
Utility occupation; 1 x 7 rdwy; guar 2011; ;bsi; ; # 1372364172000; (guaranteed street fee waived childrens hospital to pave intersection; ; ok; mc); extension
Date:  June 28, 2013

Permit type: Maintenance | Permit status: Expired | Permit id: Exca-259006 | Parcel: 0401870000
2013/06/280953 Longwood Av Boston Ma 02115
Construction of new 13-story elevator tower
Date:  December 6, 2011

Permit status: Na | Permit id: Fdc108193 | Parcel: 0401870000
2011/12/060953 Longwood Av Boston Ma 02115
All co signals;shall;require bfd notification; ~; doc# 20140427
Date:  May 5, 2014

Permit status: Na | Permit id: Bfdf349558 | Parcel: 0401870000
2014/05/050953 Longwood Av Boston Ma 02115
Installation of drap
Date:  April 14, 2014

Permit status: Na | Permit id: Chm352830 | Parcel: 0401870002
2014/04/140953 Longwood Av Boston Ma 02115
Renovation of flooring ceilings painting and partitions
Date:  May 26, 2010

Permit status: Na | Permit id: Fdc27001 | Parcel: 0401870000
2010/05/260953 Longwood Av Boston Ma 02115
Relocate (19) heads on an existing fire sprinkler system to accommodate renovations in bader &; farley buildings work will be done in (2) phases - areas are interconnected 7th floor
Date:  November 29, 2010

Permit status: Na | Permit id: Sprk50350 | Parcel: 0401870000
2010/11/290953 Longwood Av Boston Ma 02115
Install new pre-action valve and sprinklers in imaging suite remove and replace some existing wet sprinklers to accommodate new partition and ceiling layout sub-basement.; work to be done one floor zone at a time per nfpa 13 stands. 7 cmr.; no occpancy in impaired zone.
Date:  March 1, 2011

Permit status: Na | Permit id: Sprk65401 | Parcel: 0401870000
2011/03/010953 Longwood Av Boston Ma 02115
Temporary placement of (1) dumpster for debris during construction
Date:  September 26, 2013

Permit status: Na | Permit id: Td289178 | Parcel: 0401870002
2013/09/260953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems in;main bldg
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55605 | Parcel: 0401870002
2010/12/160953 Longwood Av Boston Ma 02115
Cutting burning welding for removal of existing piping and installation of new hot water piping with new hot water pump skid and air seperator (dpl) bfd paid detail required
Date:  May 2, 2013

Permit status: Na | Permit id: Cbw238093 | Parcel: 0401870002
2013/05/020953 Longwood Av Boston Ma 02115
Soldering only;associated with maintenancerepair of various mechanical systems @;farleypavillion bldg
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30745 | Parcel: 0401870000
2010/06/290953 Longwood Av Boston Ma 02115
Install relocate 2 sprinkler heads to accommodate new ceiling layout on 3rd floor. Work to be done per nfpa stands. One floor zone at a time. No patient occupancy in impaired zone.
Date:  July 5, 2013

Permit status: Na | Permit id: Sprk257306 | Parcel: 0401870000
2013/07/050953 Longwood Av Boston Ma 02115
Cutting burning welding for demolition of structural members bfd paid detail required
Date:  February 28, 2013

Permit status: Na | Permit id: Cbw223105 | Parcel: 0401870000
2013/02/280953 Longwood Av Boston Ma 02115
Cutting &; welding;of;soldier beams for earth support;for fuel tank installation;@ enders bldg life safety watch required bfd paid detail required
Date:  June 23, 2010

Permit status: Na | Permit id: Cbw30391 | Parcel: 0401886000
2010/06/230953 Longwood Av Boston Ma 02115
Main building installation of pre-engineered fire suppression system into a kitchen hood per nfpa stands. 7 cmr. To be on sep. Fire alarm zone.
Date:  May 14, 2015

Permit status: Na | Permit id: Sprk462144 | Parcel: 0401870000
2015/05/140953 Longwood Av Boston Ma 02115
Install one new strobe in rm 754 and one strobe in rm 949 for treatment room renovations doc20120704
Date:  June 26, 2012

Permit status: Na | Permit id: Bfdf149660 | Parcel: 0401870000
2012/06/260953 Longwood Av Boston Ma 02115
Phase 2 sequence;3 consists of 3 582sf located on level 1. Installation in this sequence to include 34 new sprinkler heads and lines. To be installed per nfpa13 &; cmr780. Main lobby renovations. Work is to be performed one sequence at a time.
Date:  June 27, 2013

Permit status: Na | Permit id: Sprk254262 | Parcel: 0401870000
2013/06/270953 Longwood Av Boston Ma 02115
Phase 2 sequence;7 consists of 11 586sf of space renovation located on ground floor(basement level). Installation in this sequence to include;100;new sprinkler heads and lines. To be installed per nfpa13 &; cmr780. Main lobby renovations. Work is to be performed one sequence at a time.
Date:  June 28, 2013

Permit status: Na | Permit id: Sprk254290 | Parcel: 0401870002
2013/06/280953 Longwood Av Boston Ma 02115
Relocate 28 sprinkler heads in teen room on floors 6 7 &; 8. Work to be done one floor zone at a time. Per nfpa stands. 7 cmr. No occupancy in impaired zone.
Date:  October 31, 2013

Permit status: Na | Permit id: Sprk293743 | Parcel: 0401870002
2013/10/310953 Longwood Av Boston Ma 02115
Bch main lobby renovation phase 2 - seq 2 perm smokes &; temp heats previously submitted; ~; doc% 20140663
Date:  July 7, 2014

Permit status: Na | Permit id: Bfdf366871 | Parcel: 0401870002
2014/07/070953 Longwood Av Boston Ma 02115
2 phases both shall be witness tested by bfd.; ~; doc# 20140425
Date:  May 6, 2014

Permit status: Na | Permit id: Bfdf349550 | Parcel: 0401886000
2014/05/060953 Longwood Av Boston Ma 02115
Provide and install new sprinkler system (19) heads for new utility tunnel per engineered drawings basement
Date:  August 16, 2010

Permit status: Na | Permit id: Sprk37634 | Parcel: 0401870000
2010/08/160953 Longwood Av Boston Ma 02115
Relocate (50) sprinkler heads for new ceiling renovation area ;2nd floor
Date:  December 10, 2010

Permit status: Na | Permit id: Sprk54477 | Parcel: 0401870000
2010/12/100953 Longwood Av Boston Ma 02115
Install new ahv install smoke detector to core area and 4 control modules to provide shutdownoverride capability doc20120084
Date:  February 16, 2012

Permit status: Na | Permit id: Bfdf115886 | Parcel: 0401870000
2012/02/160953 Longwood Av Boston Ma 02115
Existing fa system wll be modified because of minor renovation to the 2nd fl of the hunnewell bldg we will be installing temp heat detectors for temp fire protection during construction
Date:  April 10, 2012

Permit status: Na | Permit id: Bfdf130359 | Parcel: 0401870000
2012/04/100953 Longwood Av Boston Ma 02115
Welding of hvac heating &; chilled water piping in;the fegan bldg (dpl 12-31-2013) bfd paid detail required
Date:  September 27, 2012

Permit status: Na | Permit id: Cbw183152 | Parcel: 0401870000
2012/09/270953 Longwood Av Boston Ma 02115
Relocate four sprinkler heads on level 0l and seven sprinkler heads on the 6th floor four sprinkler heads on the 8th floor and six sprinkler heads on the 9th floor in existing building per engineered drawings for floor renovation. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. No occupancy in impaired zone.
Date:  February 14, 2014

Permit status: Na | Permit id: Sprk324350 | Parcel: 0401870002
2014/02/140953 Longwood Av Boston Ma 02115
Tenant refit of (9) heads in 3 rooms
Date:  August 6, 2012

Permit status: Na | Permit id: Sprk167080 | Parcel: 0401870002
2012/08/060953 Longwood Av Boston Ma 02115
Cutting burning &; welding of hvac pipe systems in main bldg utility tunnel (dpl) bfd paid detail required
Date:  November 1, 2011

Permit status: Na | Permit id: Cbw102673 | Parcel: 0401870000
2011/11/010953 Longwood Av Boston Ma 02115
SCORE
82
Remove existing fire pump test header piping due to architectural renovations. Existing piping is no longer in service and is not tied into sprinkler system. Sprinkler system will remain in service during this work.
Date:  August 17, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk504426 | Parcel: 0401870002
2015/08/170823 Longwood Av Boston Ma 02115Fp Permit J.C. Cannistraro Llc
Relocate (3) heads to accommodate ceiling changes in the mass spectrometer room 12th floor
Date:  December 3, 2010

Permit status: Na | Permit id: Sprk53706 | Parcel: 0401870000
2010/12/030953 Longwood Av Boston Ma 02115
Cutting burning welding for installation of support steel for exterior duct enclosure; 4-firefighters required bfd paid detail required
Date:  April 5, 2011

Permit status: Na | Permit id: Cbw69839 | Parcel: 0401870002
2011/04/050953 Longwood Av Boston Ma 02115
Replace existing sprinklers &; piping in area of work to accommodate new mechanical equipment. The sprinkler system in the work area shall remain in service until the new sprinklers &; piping are installed. Work to be done per nfpa stands. 7 cmr.
Date:  June 29, 2011

Permit status: Na | Permit id: Sprk82214 | Parcel: 0401870000
2011/06/290953 Longwood Av Boston Ma 02115
Soldering only of various mechanical systems
Date:  September 25, 2014

Permit status: Na | Permit id: Cbw409731 | Parcel: 0401870000
2014/09/250953 Longwood Av Boston Ma 02115
Soldering only for the installation of hotchilled water &; steam piping
Date:  September 10, 2013

Permit status: Na | Permit id: Cbw283028 | Parcel: 0401870002
2013/09/100953 Longwood Av Boston Ma 02115
Cutting ;welding;&; burning associated with maintenancerepair of various mechanical systems bfd paid detail required
Date:  December 16, 2011

Permit status: Na | Permit id: Cbw108883 | Parcel: 0401886000
2011/12/160953 Longwood Av Boston Ma 02115
Install new fire alarm system and devices to interface with existing childrens hosp doc 20110290
Date:  July 30, 2012

Permit status: Na | Permit id: Bfdf67627 | Parcel: 0401870000
2012/07/300953 Longwood Av Boston Ma 02115
Cutting burning welding associated with removal of mechanical systems and structural steel for lobby renovation (dpl)
Date:  January 22, 2014

Permit status: Na | Permit id: Cbw320296 | Parcel: 0401870002
2014/01/220953 Longwood Av Boston Ma 02115
Phase 2 sequence;5 consists of 5 530sf of space renovation located on level 1. Installation in this sequence include;41 new sprinkler heads and lines. To be installed per nfpa13 &; cmr780. Main lobby renovations. Work is to be performed one sequence at a time.
Date:  June 28, 2013

Permit status: Na | Permit id: Sprk254282 | Parcel: 0401870000
2013/06/280953 Longwood Av Boston Ma 02115
Soldering of hotchilled water &; steam piping
Date:  April 22, 2013

Permit status: Na | Permit id: Cbw235945 | Parcel: 0401870002
2013/04/220953 Longwood Av Boston Ma 02115
Cutting burning &; welding for installation of structural steel of the main bldg bfd paid detail required
Date:  March 15, 2012

Permit status: Na | Permit id: Cbw122413 | Parcel: 0401870002
2012/03/150953 Longwood Av Boston Ma 02115
Hunnewell bldg food service admin(hu-)039 4 )removal of plaster for hvac ductwork
Date:  September 3, 2014

Permit status: Na | Permit id: Asb403875 | Parcel: 0401870000
2014/09/030953 Longwood Av Boston Ma 02115
Sprinkler plans shall be approved by isd
Date:  November 30, 2012

Permit status: Na | Permit id: Sprk201968 | Parcel: 0401870002
2012/11/300953 Longwood Av Boston Ma 02115
Add 2 duct smoke detectors 2 shut down control modules and 2 monitor moduals to a new ahvon the 4th fl of main building doc20121402
Date:  January 10, 2013

Permit status: Na | Permit id: Bfdf205331 | Parcel: 0401870002
2013/01/100953 Longwood Av Boston Ma 02115
Temporary placement of (1) dumpster for debris removal from;construction work
Date:  December 8, 2011

Permit status: Na | Permit id: Td108189 | Parcel: 0401870000
2011/12/080953 Longwood Av Boston Ma 02115
Soldering only;associated with maintenancerepair of various mechanical systems @;hunnewell bldg
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30743 | Parcel: 0401870002
2010/06/290953 Longwood Av Boston Ma 02115
Welding cutting heating for installation of chilled water valves and piping bfd paid detail required
Date:  February 3, 2010

Permit status: Na | Permit id: Cbw13180 | Parcel: 0401870000
2010/02/030953 Longwood Av Boston Ma 02115
Brand new construction of 13-story elevator tower
Date:  September 26, 2013

Permit status: Na | Permit id: Fdc289174 | Parcel: 0401870000
2013/09/260953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems in farley pavillion bldg
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55603 | Parcel: 0401870002
2010/12/160953 Longwood Av Boston Ma 02115
Cutting and welding for installation of new hot water piping and a new hot water; pump skid and air separator (dpl) bfd paid detail required
Date:  June 28, 2013

Permit status: Na | Permit id: Cbw258108 | Parcel: 0401870000
2013/06/280953 Longwood Av Boston Ma 02115
Cutting burning welding for hvac installation of new cooling towers (dpl); bfd paid detail required
Date:  March 28, 2012

Permit status: Na | Permit id: Cbw125312 | Parcel: 0401870002
2012/03/280953 Longwood Av Boston Ma 02115
Demo (3) sprinkler heads relocate (14) sprinkler heads ((11) heads on 1st floor and (3) heads on 3rd floor) due to ambulatory upgrades work to be done per nfpa 13 requirements. Work to be done one floor zone at a time.; no patients in impaired zone.
Date:  March 7, 2011

Permit status: Na | Permit id: Sprk65695 | Parcel: 0401870002
2011/03/070953 Longwood Av Boston Ma 02115
Relocate sprinkler heads on floors 2nd and 4th floor.
Date:  June 17, 2013

Permit status: Na | Permit id: Sprk246807 | Parcel: 0401870002
2013/06/170953 Longwood Av Boston Ma 02115
"soldering only";of pipe associated with maintenance of various mechanical systems &; hvac system @;bader bldg
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459262 | Parcel: 0401870000
2015/04/070953 Longwood Av Boston Ma 02115
Soldering only for installation of water piping system for plumbing work
Date:  May 31, 2012

Permit status: Na | Permit id: Cbw144654 | Parcel: 0401870000
2012/05/310953 Longwood Av Boston Ma 02115
Phase 2 sequence 2 consists of 1 725 located on level 1. Installation in this sequence to include 34 new sprinkler heads and lines. To be installed per nfpa13 &; cmr780. Main lobby renovations. Work is to be performed one sequence at a time.
Date:  June 27, 2013

Permit status: Na | Permit id: Sprk254258 | Parcel: 0401870002
2013/06/270953 Longwood Av Boston Ma 02115
Relocate (6) heads on flr. 11 and (2) heads on flr 7 for new ceiling per engineered drawings
Date:  September 21, 2012

Permit status: Na | Permit id: Sprk182686 | Parcel: 0401870002
2012/09/210953 Longwood Av Boston Ma 02115
Main building. Installation of pre-engineered fire suppression system into a kitchen hood work per nfpa stands 7 cmr; to be tied to building fa system.; on seperate zone.
Date:  July 14, 2015

Permit status: Na | Permit id: Sprk462157 | Parcel: 0401870000
2015/07/140953 Longwood Av Boston Ma 02115
2nd floor tenant - renovations - 23 heads. Work to be done one floor zone at a time per nfpa stands. No patient occupancy in impaired floor.
Date:  May 18, 2012

Permit status: Na | Permit id: Sprk138342 | Parcel: 0401870002
2012/05/180953 Longwood Av Boston Ma 02115
System shall remain active at all time coordinate impairment with building management so that only one floor is impaired at any given time.
Date:  May 31, 2013

Permit status: Na | Permit id: Sprk248500 | Parcel: 0401870002
2013/05/310953 Longwood Av Boston Ma 02115
Cutting burning &; welding of door frames brackets mechine beam &; door frames for new elevator tower bfd paid detail required
Date:  March 25, 2013

Permit status: Na | Permit id: Cbw228470 | Parcel: 0401870000
2013/03/250953 Longwood Av Boston Ma 02115
Cutting burning &; welding for the installation of pipe for hvac system (dpl) bfd paid detail required
Date:  June 5, 2014

Permit status: Na | Permit id: Cbw369711 | Parcel: 0401870000
2014/06/050953 Longwood Av Boston Ma 02115
SCORE
92
Add new office to area.; new office has a new smoke detector and bathroom has a new horn strobe - hunnewell 305; ~; doc# 20121297 ; ;3rd floor
Date:  December 5, 2012

Permit status: Na | Permit id: Bfdf198820 | Parcel: 0401870002
2012/12/050923 Longwood Av Boston Ma 02115Daniel Murphy Electrical
Bch main lobby renovation phase 2 - seq;4 perm smokes &; temp heats previously submitted ~ doc% 20140663
Date:  July 17, 2014

Permit status: Na | Permit id: Bfdf366880 | Parcel: 0401870000
2014/07/170953 Longwood Av Boston Ma 02115
Relocating (199) existing sprinkler heads 4th floor
Date:  August 4, 2010

Permit status: Na | Permit id: Sprk34509 | Parcel: 0401870002
2010/08/040953 Longwood Av Boston Ma 02115
Renovation to 2nd floor corridor consisting of replacing (8) existing smokes with new ones and adding (1) new speaker strobe
Date:  December 30, 2014

Permit status: Na | Permit id: Bfdf424842 | Parcel: 0401870000
2014/12/300953 Longwood Av Boston Ma 02115
Soldering &; welding of ductwork @ childrens hospital pavilion bldg (research pharmacy); bfd paid detail required
Date:  October 8, 2014

Permit status: Na | Permit id: Cbw390910 | Parcel: 0401870002
2014/10/080953 Longwood Av Boston Ma 02115
Modify and expand existing addressable fa system floors 3 &; 4; work to be done per nfpa 72.; no occupancy in impaired zone. Doc#20100759 now doc 20110938 extended per r. Baldowski
Date:  September 15, 2010

Permit status: Na | Permit id: Bfdf40311 | Parcel: 0401870002
2010/09/150953 Longwood Av Boston Ma 02115
Cutting &; welding of chilled water valves supports &; piping exterior main bldg;
Date:  March 4, 2010

Permit status: Na | Permit id: Cbw16621 | Parcel: 0401870000
2010/03/040953 Longwood Av Boston Ma 02115
SCORE
86
Renovation of existing lab space. Demo of existing finishes. New lab casework finishes and mep upgrades.
Date:  December 18, 2015
Contractor: Dan Parisi

Permit type: Bfd other | Permit status: Na | Permit id: Fdc548677 | Parcel: 0401886000
2015/12/180863 Longwood Av Boston Ma 02115Dan Parisi
Alterations to existing system
Date:  December 21, 2015

Permit status: Na | Permit id: Bfdf536164 | Parcel: 0401870002
2015/12/210953 Longwood Av Boston Ma 02115
SCORE
86
New paint carpet millwork
Date:  July 20, 2015
Contractor: Richard Pugsley

Permit type: Bfd other | Permit status: Na | Permit id: Fdc495755 | Parcel: 0401870000
2015/07/200863 Longwood Av Boston Ma 02115Richard Pugsley
SCORE
100
Partial remodel of the 2nd and 6th floors including 2 new speakerstrobes and 1 strobe. Activation of smoke detectors to initiate smoke control systems.
Date:  November 23, 2015
Contractor: Michael Mcdonald

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf527680 | Parcel: 0401870000
2015/11/2301003 Longwood Av Boston Ma 02115Michael Mcdonald
SCORE
100
Relocate 208 volt feed to blast chiller in fegan sub basement.
Date:  July 30, 2013
Value:   $1,000

Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E268573 | Parcel: 0401870000
2013/07/3010001003 Longwood Av Boston Ma 02115Murphy Electrical And Industrial Control
Welding for installation of stainless steel ductwork in hospital room bfd paid detail required
Date:  April 25, 2011

Permit status: Na | Permit id: Cbw72715
2011/04/250953 Longwood Av Boston Ma 02115
;work will be done one floor-at-a-time;coordinate impairment with building managment
Date:  May 3, 2013

Permit status: Na | Permit id: Sprk238270 | Parcel: 0401870000
2013/05/030953 Longwood Av Boston Ma 02115
Existing fa system will be modified becasue of minor renovation to the 2nd fl of the hunnewell bldg we will be re-using existing devices
Date:  April 10, 2012

Permit status: Na | Permit id: Bfdf130352 | Parcel: 0401870002
2012/04/100953 Longwood Av Boston Ma 02115
Installation of 2 fire alarm audible visual devices on the 6th floor of the pavilion building (research pharmacy); doc# 20140570
Date:  December 8, 2014

Permit status: Na | Permit id: Bfdf358973 | Parcel: 0401870002
2014/12/080953 Longwood Av Boston Ma 02115
Install new pre-action valve &; sprinklers in imaging suite. Remove &; replace some existing sprinklers to accomodate new partition &; ceiling lay-out in sub-basement. Work to be done 1-floor-at-a-time per nfpa 12 standards 7 cmr.;no occupancy during impairment.
Date:  October 13, 2011

Permit status: Na | Permit id: Sprk99373 | Parcel: 0401870000
2011/10/130953 Longwood Av Boston Ma 02115
Permit is for the use of butane lighter fluid and a lighter to create an open flame for surgical fire safety training at bostons childrens hospital by a member of russell phillips &; associates llc. On wednesday november 13 2013. Bfd paid detail required
Date:  November 13, 2013

Permit type: Special effects | Permit status: Na | Permit id: Gp302951 | Parcel: 0401870002
2013/11/130953 Longwood Av Boston Ma 02115
Relocate add (12) sprinkler heads per engineered drawings fl 2. Work to be done one floor zone at a tme per nfpa stands.
Date:  July 18, 2011

Permit status: Na | Permit id: Sprk83688 | Parcel: 0401870002
2011/07/180953 Longwood Av Boston Ma 02115
Install new system &; risers including 418 sprinkler heads in hunnewell building.; (areas of work currently do not have sprinkler coverage); tie in new 6" main to existing hunnewell main
Date:  June 3, 2014

Permit status: Na | Permit id: Sprk350309 | Parcel: 0401870002
2014/06/030953 Longwood Av Boston Ma 02115
Renovate fire alarm in rooms hv246 includes speakerstrobes and one smoke dector doc20131218
Date:  March 13, 2014

Permit status: Na | Permit id: Bfdf296186 | Parcel: 0401870002
2014/03/130953 Longwood Av Boston Ma 02115
Minor renovation to main bldg. Offices.; add (3) smoke detectors (3) avs &; (1) control module.; ~; doc# 20120080
Date:  February 15, 2012

Permit status: Na | Permit id: Bfdf115693 | Parcel: 0401870002
2012/02/150953 Longwood Av Boston Ma 02115
Minor renovations to include walls and millwork
Date:  September 27, 2010

Permit status: Na | Permit id: Fdc16345 | Parcel: 0401870000
2010/09/270953 Longwood Av Boston Ma 02115
Cutting &; welding of chilled water coils in main bldg (dpl) bfd paid detail required
Date:  November 14, 2013

Permit status: Na | Permit id: Cbw302157 | Parcel: 0401870000
2013/11/140953 Longwood Av Boston Ma 02115
There shall be no impairment to any other buildings sprinkler system;during;the tie in of;hunnewell building sprinkler system into the;6" water main.
Date:  July 9, 2014

Permit status: Na | Permit id: Sprk374113 | Parcel: 0401870000
2014/07/090953 Longwood Av Boston Ma 02115
Cutting &; welding for new structural foundation to include wales struts &; clips bfd paid detail required
Date:  January 5, 2011

Permit status: Na | Permit id: Cbw57665 | Parcel: 0401870000
2011/01/050953 Longwood Av Boston Ma 02115
Cutting burning &; welding for installation of structural steel @ enders research bldg;(dpl 7302013) bfd paid detail required
Date:  March 20, 2012

Permit status: Na | Permit id: Cbw124986 | Parcel: 0401870002
2012/03/200953 Longwood Av Boston Ma 02115
Relocate (15) sprinkler heads. Plug section of sprinkler pipe no longer in use. Work to be done one floor zone at a time per nfpa stands. No patient occupancy in impaired zone.
Date:  December 8, 2011

Permit status: Na | Permit id: Sprk107553 | Parcel: 0401870002
2011/12/080953 Longwood Av Boston Ma 02115
Tenant re-fit on 8th floor (171) heads coordinate;with building management so that only one floor is impaired within the building at any time
Date:  November 29, 2010

Permit status: Na | Permit id: Sprk52803 | Parcel: 0401870000
2010/11/290953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of hvac piping system in fegan bldg
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79118 | Parcel: 0401870000
2011/06/030953 Longwood Av Boston Ma 02115
Renovation at children hospital farley bld. 3rd floor installation of modules for smoke damper. Relocate one av unit bsmt level. Doc#20141304 ; relocated speaker strobe to maintain highr-sie selective evacuation sequence.
Date:  October 22, 2014

Permit status: Na | Permit id: Bfdf409951 | Parcel: 0401870000
2014/10/220953 Longwood Av Boston Ma 02115
Cutting burning welding of structural steel and miscellaneous metals for installation of new elevator tower for new construction
Date:  June 5, 2012

Permit status: Na | Permit id: Cbw146895 | Parcel: 0401870000
2012/06/050953 Longwood Av Boston Ma 02115
Pipe 168 heads on an existing system to accommodate ceiling renovation. Demo pre-existing heads following tie in of new line piping. Work to be done per nfpa stands. 7 cmr. One floor zone at a time.; no patient occupancy in impaired zone.
Date:  July 8, 2013

Permit status: Na | Permit id: Sprk259765 | Parcel: 0401870000
2013/07/080953 Longwood Av Boston Ma 02115
Coordinate impairment with building management so that only 735 sf of floor 6;is the only active impaired within the building.
Date:  March 20, 2013

Permit status: Na | Permit id: Sprk225425 | Parcel: 0401870000
2013/03/200953 Longwood Av Boston Ma 02115
Relocate 2 sprinklers. Work to be done per nfpa stands. 7 cmr. Only one floor shall be impaired at any given time coordinate impairment with building managment
Date:  November 25, 2013

Permit status: Na | Permit id: Sprk306313 | Parcel: 0401870002
2013/11/250953 Longwood Av Boston Ma 02115
Soldering only associated with maintenancerepair of various mechanical systems @;enders bldg
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79142 | Parcel: 0401886000
2011/06/030953 Longwood Av Boston Ma 02115
Main building. Installation of pre-engineered fire suppression system into a kitchen hood per nfpa stands. 7 cmr. To be on sep. Fire alarm zone.
Date:  July 14, 2015

Permit status: Na | Permit id: Sprk462151 | Parcel: 0401870000
2015/07/140953 Longwood Av Boston Ma 02115
Removal and re-installation of existing fire alarm equiptment 16 units no new equiptment installed doc20121073
Date:  October 4, 2012

Permit status: Na | Permit id: Bfdf182204 | Parcel: 0401870002
2012/10/040953 Longwood Av Boston Ma 02115
Installation of pre-engineered fire suppression system into a kitchen hood. Work per nfpa stands 7 cmr. To be tied to building fire alarm system on sep zone.
Date:  July 14, 2015

Permit status: Na | Permit id: Sprk462173 | Parcel: 0401870002
2015/07/140953 Longwood Av Boston Ma 02115
Stand truck &; pumper truck at curb; x 12; hoses to be ramped for pedestrian access
Date:  February 11, 2014

Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-325996 | Parcel: 0401870000
2014/02/110953 Longwood Av Boston Ma 02115
Relocating (11) heads on an existing system to accomodate ceiling renovation.;no patient occupancy in impaired zone. Work to be done per nfpa stands. 7 cmr. One floor zone at a time.
Date:  March 27, 2012

Permit status: Na | Permit id: Sprk124641 | Parcel: 0401870002
2012/03/270953 Longwood Av Boston Ma 02115
SCORE
100
Installation;shall comply with 7 cmr and nfpa 72. ;~; doc# 20130906
Date:  March 31, 2014
Contractor: Michael Mcdonald

Permit status: Na | Permit id: Bfdf270792 | Parcel: 0401870002
2014/03/3101003 Longwood Av Boston Ma 02115Michael Mcdonald
Remove fire alarm devices install temp heat detectors reinstall fa devices add smoke detectors on av units doc20131216
Date:  March 18, 2014

Permit status: Na | Permit id: Bfdf296180 | Parcel: 0401870000
2014/03/180953 Longwood Av Boston Ma 02115
Add devices to existing mri preaction system on 2nd fl main radiology dept; per nfpa 72 7 cmr doc20110810
Date:  August 16, 2011

Permit status: Na | Permit id: Bfdf88121 | Parcel: 0401870000
2011/08/160953 Longwood Av Boston Ma 02115
Renovate fire alarm devices in childrens hospital pre-op clinich doc20111395
Date:  January 30, 2012

Permit status: Na | Permit id: Bfdf112209 | Parcel: 0401870000
2012/01/300953 Longwood Av Boston Ma 02115
Install a temporary food truck for 6 months during construction.
Date:  December 17, 2014
Value:   $1,000

Permit type: Temporary trailers | Permit status: Expired | Current use: Vacld | Permit id: Sf435482 | Parcel: 0401870000
2014/12/171000953 Longwood Av Boston Ma 02115
Connect to existing and extend dry sprinkler system piping into chb neuro storage room &; install 8 upright heads in new area.
Date:  May 20, 2013

Permit status: Na | Permit id: Sprk242389 | Parcel: 0401870000
2013/05/200953 Longwood Av Boston Ma 02115
Installation shall comply with nfpa 72 and 7 cmr doc#20131151
Date:  March 13, 2014

Permit status: Na | Permit id: Bfdf291036 | Parcel: 0401886000
2014/03/130953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 5b. Doc#20130774
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259486 | Parcel: 0401870000
2013/07/160953 Longwood Av Boston Ma 02115
SCORE
92
Hunnell 3 - 386. Split room 386 into 2 rooms.; add new smoke detector in new room; ~; doc# 20121296
Date:  November 30, 2012

Permit status: Na | Permit id: Bfdf198840 | Parcel: 0401870002
2012/11/300923 Longwood Av Boston Ma 02115Daniel Murphy Electrical
Burning &; welding for removal &; installation of ductwork hangers &; piping in farleyfegan bldg;(dpl) bfd paid detail required
Date:  January 14, 2010

Permit status: Na | Permit id: Cbw10787 | Parcel: 0401870000
2010/01/140953 Longwood Av Boston Ma 02115
Cutting burning &; welding of existing 15" underground drain line with new 24" drain line installation of new storm infiltration tank &; associated piping to include temporary earth retention systems (dpl 12-5-2014);
Date:  June 18, 2014

Permit status: Na | Permit id: Cbw371794 | Parcel: 0401870000
2014/06/180953 Longwood Av Boston Ma 02115
Add fire alarm door holders and speaker strobes in 4 locations on 7th8th9th and 19th fl of main bldg work to be done per nfpa stands 7 cmr doc20111012 ;
Date:  October 20, 2011

Permit status: Na | Permit id: Bfdf97626 | Parcel: 0401870002
2011/10/200953 Longwood Av Boston Ma 02115
Tenant refit of multiple floors (100) heads total floors 3 5-8 11 &; 13 (10) heads per floor only one floor at a time
Date:  October 5, 2010

Permit status: Na | Permit id: Sprk44914 | Parcel: 0401870000
2010/10/050953 Longwood Av Boston Ma 02115
Installing a new pre-action system in the existing electrical room(vault). Not: this room has no existing sprinkler system tie-into the existing 6" main to feed pa valve. Work to be done per nfpa stands 7 cmr. One floor zone at a time. No patient occupancy in impaired zone.
Date:  December 19, 2013

Permit status: Na | Permit id: Sprk314405 | Parcel: 0401870000
2013/12/190953 Longwood Av Boston Ma 02115
Cutting burning welding for removal of rolling steel door and installation of new door and frame for replacement (dpl) bfd paid detail required
Date:  July 8, 2014

Permit status: Na | Permit id: Cbw380686
2014/07/080953 Longwood Av Boston Ma 02115
Relocate 5 sprinkler heads in restrooms to accommodate new architectural planslayout. One floor at a time. Per nfpa 13 and 7 cmr.(pavilion)
Date:  August 28, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk504935 | Parcel: 0401870002
2015/08/280953 Longwood Av Boston Ma 02115
SCORE
82
Relocate existing sprinklers in the first floor clinical building and 1st floor farley building due to architectural renovations per nfpa 13 and 7 cmr requirements.; one floor zone at a time. No patient occupancy in impaired zone.
Date:  September 21, 2015

Permit type: Bfd other | Permit status: Na | Permit id: Sprk518389 | Parcel: 0401870002
2015/09/210823 Longwood Av Boston Ma 02115Fp Permit J.C. Cannistraro Llc
SCORE
86
Install new drain; x 5 street only; # 1400770331794; jackies law permit on file; ds 2014-160-9550
Date:  June 6, 2014

Permit type: Service | Permit status: Expired | Permit id: Exca-369828 | Parcel: 0401870000
2014/06/060863 Longwood Av Boston Ma 02115Bond Cancelled J F White Contracting Co
Installation of temporary heat detectors during renovation work.; sprinkler system to remain active until partition walls are demolished and heat detectors are in place.
Date:  February 13, 2013

Permit status: Na | Permit id: Bfdf209899 | Parcel: 0401870002
2013/02/130953 Longwood Av Boston Ma 02115
Remodeling of folkman auditorium up-grading fire alarm system; ~; doc# 20120485 alarm activation to initiate any smoke control functions.
Date:  May 23, 2012

Permit status: Na | Permit id: Bfdf135537 | Parcel: 0401870002
2012/05/230953 Longwood Av Boston Ma 02115
Installing new tamper &; flow switches on new sprinkler riser running from basement to the 5th floor.; ~; doc# 20111235
Date:  January 30, 2012

Permit status: Na | Permit id: Bfdf106269 | Parcel: 0401870000
2012/01/300953 Longwood Av Boston Ma 02115
Installation of new smoke damper and duct smoke detector doc # 20140284
Date:  March 17, 2014

Permit status: Na | Permit id: Bfdf341475
2014/03/170953 Longwood Av Boston Ma 02115
Impairment shall be coordinated with building managment; ~; doc# 20121388
Date:  January 7, 2013

Permit status: Na | Permit id: Bfdf204089 | Parcel: 0401870002
2013/01/070953 Longwood Av Boston Ma 02115
Install 2;duct detectors in mri suite;on 2nd floor - main bldg.; -; doc #20110857
Date:  August 23, 2011

Permit status: Na | Permit id: Bfdf89805 | Parcel: 0401870002
2011/08/230953 Longwood Av Boston Ma 02115
SCORE
100
Work approved for hunnewell section of 3 longwood ave which is a non high rise building with partial sprinkler system.
Date:  September 30, 2015
Contractor: Michael Mcdonald

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf490876 | Parcel: 0401870002
2015/09/3001003 Longwood Av Boston Ma 02115Michael Mcdonald
SCORE
100
Replace the existing fire alarm riser in the farley building and install a smoke control panel.
Date:  September 30, 2015
Contractor: Michael Mcdonald

Permit type: Bfd other | Permit status: Na | Permit id: Bfdf493936 | Parcel: 0401870000
2015/09/3001003 Longwood Av Boston Ma 02115Michael Mcdonald
Installation of drap
Date:  August 22, 2012

Permit status: Na | Permit id: Chm175418 | Parcel: 0401870002
2012/08/220953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave @ childrens hospital
Date:  September 24, 2012

Permit status: Na | Permit id: Asb185272 | Parcel: 0401870000
2012/09/240953 Longwood Av Boston Ma 02115
Welding only of leaking pipe in equipment unit (dpl)
Date:  February 4, 2014

Permit status: Na | Permit id: Cbw322775 | Parcel: 0401870000
2014/02/040953 Longwood Av Boston Ma 02115
To remove asbestos
Date:  December 3, 2012

Permit status: Na | Permit id: Asb204381 | Parcel: 0401870002
2012/12/030953 Longwood Av Boston Ma 02115
Installation of upho
Date:  June 13, 2014

Permit status: Na | Permit id: Chm370819 | Parcel: 0401870002
2014/06/130953 Longwood Av Boston Ma 02115
Removal of asbestos from;hunnewell bldg
Date:  July 25, 2012

Permit status: Na | Permit id: Asb166357 | Parcel: 0401870000
2012/07/250953 Longwood Av Boston Ma 02115
Cardiac office suite removal of carpet (adhesive)
Date:  August 18, 2015

Permit status: Na | Permit id: Asb508986 | Parcel: 0401870000
2015/08/180953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave boston
Date:  September 27, 2011

Permit status: Na | Permit id: Asb97828 | Parcel: 0401870000
2011/09/270953 Longwood Av Boston Ma 02115
Welding / burning for hvac installation of stainless steel and black steel piping 4-firefighters bfd paid detail required
Date:  February 17, 2011

Permit status: Na | Permit id: Cbw64208 | Parcel: 0401870002
2011/02/170953 Longwood Av Boston Ma 02115
Bagging of smoke detectors
Date:  August 5, 2015

Permit status: Na | Permit id: Bsd502011 | Parcel: 0401870000
2015/08/050953 Longwood Av Boston Ma 02115
Add (1) speaker/ strobe in lounge area doc#20100594
Date:  July 26, 2010

Permit status: Na | Permit id: Bfdf34681 | Parcel: 0401870000
2010/07/260953 Longwood Av Boston Ma 02115
Installation of upho
Date:  January 17, 2013

Permit status: Na | Current use: Comm | Permit id: Chm183663 | Parcel: 0401870002
2013/01/170953 Longwood Av Boston Ma 02115
Minor renovations to offices and labs floors 4 &; 7.; work to be done per nfpa 72 7 cmr 7th ed. Doc#20110124
Date:  March 1, 2011

Permit status: Na | Permit id: Bfdf62342 | Parcel: 0401870000
2011/03/010953 Longwood Av Boston Ma 02115
Cutting welding &; burning associated with maintenance/repair of various mechanical systems in hunnewell bldg 2-firefighters required bfd paid detail required
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79153 | Parcel: 0401870000
2011/06/030953 Longwood Av Boston Ma 02115
Installation of upho
Date:  July 14, 2015

Permit status: Na | Permit id: Chm494522 | Parcel: 0401870000
2015/07/140953 Longwood Av Boston Ma 02115
Install new;co;detection system in (3) fegan building food service (4) main building and (4) clinical building.; install per 527 cmr chp 31 technical;option a.; work to be done per nfpa stand. 7 cmr 7th ed. Doc#20100990
Date:  November 24, 2010

Permit status: Na | Permit id: Bfdf50159 | Parcel: 0401870002
2010/11/240953 Longwood Av Boston Ma 02115
Welding cutting &; burning for installation of the hvac &; plumbing systems (dpl) for each separate location bfd paid detail required
Date:  October 30, 2013

Permit status: Na | Permit id: Cbw299525 | Parcel: 0401870002
2013/10/300953 Longwood Av Boston Ma 02115
Welding of stainless steel ductwork for repair maintenance and minor alterations to mechanical system (dpl) bfd paid detail required
Date:  July 23, 2010

Permit status: Na | Permit id: Cbw35285 | Parcel: 0401870002
2010/07/230953 Longwood Av Boston Ma 02115
To remove asbestos from the fegan building 1st floor
Date:  June 28, 2010

Permit status: Na | Permit id: Asb31543 | Parcel: 0401870002
2010/06/280953 Longwood Av Boston Ma 02115
Demolition of existing walls and finishes for renovation of main lobby
Date:  November 30, 2012

Permit status: Na | Permit id: Fdc203702 | Parcel: 0401870000
2012/11/300953 Longwood Av Boston Ma 02115
Soldering only of new hot/chilled ;water piping in enders arch &; cage wash levels ;(dpl)
Date:  May 24, 2012

Permit status: Na | Permit id: Cbw143560 | Parcel: 0401870000
2012/05/240953 Longwood Av Boston Ma 02115
Renovation of existing office to include new walls for construction of new office
Date:  May 21, 2012

Permit status: Na | Permit id: Fdc143386 | Parcel: 0401870002
2012/05/210953 Longwood Av Boston Ma 02115
Interior renovation of existing space to include upgrading finishes new ceilings flooring and paint
Date:  July 31, 2014

Permit status: Na | Permit id: Fdc387866 | Parcel: 0401870002
2014/07/310953 Longwood Av Boston Ma 02115
Installation of inte
Date:  June 11, 2012
Value:   $20

Permit status: Na | Current use: Comm | Permit id: Chm149702 | Parcel: 0401870002
2012/06/1120953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 5a. Doc#20130777
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259495 | Parcel: 0401870000
2013/07/160953 Longwood Av Boston Ma 02115
Cutting burning &; welding of misc steel erection (dpl) bfd paid detail required
Date:  December 3, 2013

Permit status: Na | Permit id: Cbw307681 | Parcel: 0401870000
2013/12/030953 Longwood Av Boston Ma 02115
To remove asbestos from the bader building 1st floor
Date:  May 19, 2010

Permit status: Na | Permit id: Asb26523 | Parcel: 0401870000
2010/05/190953 Longwood Av Boston Ma 02115
Phase 1;install temporary heat detectors phase 2 re-install fire alarm devices &; add smoke detector &; av unit.; ~; doc# 20121259
Date:  December 27, 2012

Permit status: Na | Permit id: Bfdf201984 | Parcel: 0401870002
2012/12/270953 Longwood Av Boston Ma 02115
Removal;of asbestos
Date:  September 17, 2013

Permit status: Na | Permit id: Asb286314 | Parcel: 0401870000
2013/09/170953 Longwood Av Boston Ma 02115
To remove asbestos from the hunnewell building 1st floor
Date:  May 27, 2010

Permit status: Na | Permit id: Asb27621 | Parcel: 0401870002
2010/05/270953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave
Date:  October 25, 2011

Permit status: Na | Permit id: Asb102531 | Parcel: 0401870000
2011/10/250953 Longwood Av Boston Ma 02115
Welding only;for plumbing installation of stainless steel piping bfd paid detail required
Date:  November 30, 2012

Permit status: Na | Permit id: Cbw202268 | Parcel: 0401870002
2012/11/300953 Longwood Av Boston Ma 02115
Cutting of steel plates;in existing bldg bfd paid detail required
Date:  April 4, 2013

Permit status: Na | Permit id: Cbw230811 | Parcel: 0401870000
2013/04/040953 Longwood Av Boston Ma 02115
Cutting burning &; welding for the installation of hvac pipe (dpl) bfd paid detail required
Date:  October 12, 2011

Permit status: Na | Permit id: Cbw99316 | Parcel: 0401870002
2011/10/120953 Longwood Av Boston Ma 02115
Date:  January 14, 2014

Permit status: Na | Permit id: Asb319181 | Parcel: 0401870002
2014/01/140953 Longwood Av Boston Ma 02115
To remove asbestos from the 1st floor rooms throughout and corridors
Date:  February 19, 2010

Permit status: Na | Permit id: Asb15481 | Parcel: 0401870000
2010/02/190953 Longwood Av Boston Ma 02115
Renovation of main lobby at boston childrens hospital. Doc#20130699
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf252575 | Parcel: 0401870002
2013/07/160953 Longwood Av Boston Ma 02115
Burning &; welding for the demoing &; installation of pipe @ hunnewll bldg bfd paid detail required
Date:  November 20, 2013

Permit status: Na | Permit id: Cbw303526 | Parcel: 0401870000
2013/11/200953 Longwood Av Boston Ma 02115
Add fa devices to cover renovations on 1st floor existing to remain active until new operation new tied into existing fa panel doc#20100816
Date:  October 21, 2010

Permit status: Na | Permit id: Bfdf42835 | Parcel: 0401870000
2010/10/210953 Longwood Av Boston Ma 02115
Welding ;cutting &; burning;associated with maintenance/repair of various mechanical systems in;farley pavillion bldg 2-firefighters bfd paid detail required
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55608 | Parcel: 0401870002
2010/12/160953 Longwood Av Boston Ma 02115
Cutting burning &; welding for installation of;rails &; stairs 4-firefighters &; 1-officer required ; bfd paid detail required
Date:  May 6, 2011

Permit status: Na | Permit id: Cbw75185 | Parcel: 0401870002
2011/05/060953 Longwood Av Boston Ma 02115
Cutting / burning / welding for installation of under-deck ramp support steel and metal deck (dpl) bfd paid detail required
Date:  December 17, 2012

Permit status: Na | Permit id: Cbw205278 | Parcel: 0401870002
2012/12/170953 Longwood Av Boston Ma 02115
Cutting &; welding for maintenance / repair of hvac piping systems bfd paid detail required
Date:  November 19, 2010

Permit status: Na | Permit id: Cbw50846 | Parcel: 0401870002
2010/11/190953 Longwood Av Boston Ma 02115
Welding of boom supports ; bfd paid detail required
Date:  March 1, 2010

Permit status: Na | Permit id: Cbw16246 | Parcel: 0401870000
2010/03/010953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave childrens hospital
Date:  April 19, 2011

Permit status: Na | Permit id: Asb72986 | Parcel: 0401870000
2011/04/190953 Longwood Av Boston Ma 02115
4th floor newborn medicine
Date:  March 29, 2010

Permit status: Na | Permit id: Asb19673 | Parcel: 0401870002
2010/03/290953 Longwood Av Boston Ma 02115
Bagging of smoke detectors
Date:  October 31, 2013

Permit status: Na | Permit id: Bsd291674 | Parcel: 0401870000
2013/10/310953 Longwood Av Boston Ma 02115
Soldering only for work associated with maintenance/repair of various mechanical systems bfd paid fire detail required
Date:  December 16, 2011

Permit status: Na | Permit id: Cbw108875 | Parcel: 0401870002
2011/12/160953 Longwood Av Boston Ma 02115
Minor renovation work to include ceilings walls and floors of existing offices and conference rooms
Date:  January 19, 2010

Permit status: Na | Permit id: Fdc10799 | Parcel: 0401870002
2010/01/190953 Longwood Av Boston Ma 02115
Renovation work to include floors walls and ceilings
Date:  October 13, 2010

Permit status: Na | Permit id: Fdc46507 | Parcel: 0401870000
2010/10/130953 Longwood Av Boston Ma 02115
Welding / cutting / heating associated with maintenance / repair ofvarious mechanical;systems
Date:  October 17, 2014

Permit status: Na | Permit id: Cbw413623 | Parcel: 0401870002
2014/10/170953 Longwood Av Boston Ma 02115
Previoulsy under bfdf182166; ~; doc# 20140736
Date:  July 14, 2014

Permit status: Na | Permit id: Bfdf369427 | Parcel: 0401870002
2014/07/140953 Longwood Av Boston Ma 02115
Welding only of elevator equipement in main bldg (dpl) bfd paid detail required
Date:  March 7, 2012

Permit status: Na | Permit id: Cbw110924 | Parcel: 0401870002
2012/03/070953 Longwood Av Boston Ma 02115
Welding to install curtain wall support steel; new curtains wallframes; &; glass bfd paid detail required 1 ff required
Date:  December 1, 2014

Permit status: Na | Permit id: Cbw430368 | Parcel: 0401870002
2014/12/010953 Longwood Av Boston Ma 02115
To remove asbestos from the 2nd floor
Date:  July 9, 2010

Permit status: Na | Permit id: Asb33217 | Parcel: 0401870000
2010/07/090953 Longwood Av Boston Ma 02115
Cutting &; welding of hvac piping systems in fegan bldg; bfd paid detail required
Date:  May 20, 2010

Permit status: Na | Permit id: Cbw25555 | Parcel: 0401870002
2010/05/200953 Longwood Av Boston Ma 02115
Removal of asbestos
Date:  May 21, 2013

Permit status: Na | Permit id: Asb245954 | Parcel: 0401870002
2013/05/210953 Longwood Av Boston Ma 02115
To remove asbestos from the enders building on the 9th floor
Date:  March 19, 2010

Permit status: Na | Permit id: Asb18452 | Parcel: 0401870002
2010/03/190953 Longwood Av Boston Ma 02115
Add (2) a/vs to existing dining area being renovated doc#20110175
Date:  March 4, 2011

Permit status: Na | Permit id: Bfdf64708 | Parcel: 0401870000
2011/03/040953 Longwood Av Boston Ma 02115
Removal of asbestos from fegan bldg
Date:  July 25, 2012

Permit status: Na | Permit id: Asb166355 | Parcel: 0401870000
2012/07/250953 Longwood Av Boston Ma 02115
Welding ;cutting &; burning;associated with maintenance/repair of various mechanical systems in;hunnewell;bldg bfd paid detail required
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55610 | Parcel: 0401870002
2010/12/160953 Longwood Av Boston Ma 02115
Renovate hospital entrance - excavate sidewalk at retaining wall; / maintain pedestrian safety &; thru traffic;
Date:  August 1, 2012

Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-168150 | Parcel: 0401870000
2012/08/010953 Longwood Av Boston Ma 02115
Cutting burning;&;welding;of pipe associated with maintenance of various mechanical systems &; hvac system @;bader bldg bfd paid detail required
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459257 | Parcel: 0401870002
2015/04/070953 Longwood Av Boston Ma 02115
Reno to include adding 2 walls relocation of 4 lights 4 fiffusers installation of new carpet painting replacing flooring in 2 existing offices.
Date:  September 15, 2014

Permit status: Na | Permit id: Fdc407151 | Parcel: 0401870000
2014/09/150953 Longwood Av Boston Ma 02115
To remove asbestos @ childrens hospital
Date:  December 14, 2010

Permit status: Na | Permit id: Asb55677 | Parcel: 0401870000
2010/12/140953 Longwood Av Boston Ma 02115
To remove asbestos from the hunnewell building on the ground floor
Date:  May 20, 2010

Permit status: Na | Permit id: Asb26716 | Parcel: 0401870002
2010/05/200953 Longwood Av Boston Ma 02115
Welding for installation of stainless steel ductwork (dpl) bfd paid detail required
Date:  May 10, 2012

Permit status: Na | Permit id: Cbw137901
2012/05/100953 Longwood Av Boston Ma 02115
Construction of attic in open area consisting of new gwb
Date:  September 16, 2010

Permit status: Na | Permit id: Fdc42252 | Parcel: 0401870000
2010/09/160953 Longwood Av Boston Ma 02115
Renovations to include ceiling painting flooring and millwork
Date:  May 8, 2012

Permit status: Na | Permit id: Fdc139010 | Parcel: 0401870002
2012/05/080953 Longwood Av Boston Ma 02115
Cutting &; welding for installation of support framing in enders bldg bfd paid detail required
Date:  January 19, 2012

Permit status: Na | Permit id: Cbw113400 | Parcel: 0401870002
2012/01/190953 Longwood Av Boston Ma 02115
Cutting / burning / welding;for installation;of black iron ductwork system and;access panels for cafetria renovation;(dpl) bfd paid detail required
Date:  December 19, 2014

Permit status: Na | Permit id: Cbw435797 | Parcel: 0401870000
2014/12/190953 Longwood Av Boston Ma 02115
To remove asbestos from the main building 8th floor
Date:  February 19, 2010

Permit status: Na | Permit id: Asb15467 | Parcel: 0401870000
2010/02/190953 Longwood Av Boston Ma 02115
To remove asbestos from the fegan building 6th floor
Date:  January 20, 2010

Permit status: Na | Permit id: Asb11650 | Parcel: 0401870000
2010/01/200953 Longwood Av Boston Ma 02115
Temporary bagging of smoke detectors for dust control during construction work
Date:  August 27, 2013

Permit status: Na | Permit id: Bsd274709 | Parcel: 0401870002
2013/08/270953 Longwood Av Boston Ma 02115
Cutting welding &; burning associated with maintenance/repair of various mechanical systems @;farley/pavillion bldg bfd paid detail required
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30748 | Parcel: 0401870002
2010/06/290953 Longwood Av Boston Ma 02115
Cutting burning &; welding to reinstall a;steel support;that was removed due to equipment removal from pavilion bldg room-pv-0 bfd paid detail required
Date:  October 17, 2013

Permit status: Na | Permit id: Cbw295872 | Parcel: 0401870002
2013/10/170953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave
Date:  June 21, 2011

Permit status: Na | Permit id: Asb82575 | Parcel: 0401870000
2011/06/210953 Longwood Av Boston Ma 02115
Renovations to include removal of ;existing trash chute new wall ss sheet protection new acoustical &; painting @ loading dock;
Date:  March 27, 2012

Permit status: Na | Permit id: Fdc126760 | Parcel: 0401870000
2012/03/270953 Longwood Av Boston Ma 02115
Install new duct smoke detectors in ahu-6 main building 4th floor doc#20100883
Date:  October 29, 2010

Permit status: Na | Permit id: Bfdf45305 | Parcel: 0401870000
2010/10/290953 Longwood Av Boston Ma 02115
Renovation work to include painting walls ceilings and floors
Date:  June 23, 2014

Permit status: Na | Permit id: Fdc375501 | Parcel: 0401870000
2014/06/230953 Longwood Av Boston Ma 02115
To remove asbestos
Date:  December 21, 2011

Permit status: Na | Permit id: Asb111416 | Parcel: 0401870000
2011/12/210953 Longwood Av Boston Ma 02115
Burning &; welding of structural steel framing (dpl); bfd paid detail required
Date:  October 13, 2011

Permit status: Na | Permit id: Cbw99168 | Parcel: 0401870000
2011/10/130953 Longwood Av Boston Ma 02115
Enders building; removal of transite panels from fume hood
Date:  February 25, 2015

Permit status: Na | Permit id: Asb449542 | Parcel: 0401870000
2015/02/250953 Longwood Av Boston Ma 02115
Cutting welding &; grinding;associated with fuel oil pipe installations bfd paid detail required
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30350 | Parcel: 0401870002
2010/06/290953 Longwood Av Boston Ma 02115
Cutting &; burning for removal of misc steel in main lobby bfd paid detail required
Date:  February 22, 2013

Permit status: Na | Permit id: Cbw214807 | Parcel: 0401870002
2013/02/220953 Longwood Av Boston Ma 02115
Welding cutting and burning in persuant to the installation of new low pressure steam piping for humidifiers in the childrens hospital main building bfd paid detail required
Date:  August 26, 2014

Permit status: Na | Permit id: Cbw397961 | Parcel: 0401870000
2014/08/260953 Longwood Av Boston Ma 02115
Date:  January 10, 2013

Permit status: Na | Permit id: Asb212030 | Parcel: 0401870000
2013/01/100953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave boston
Date:  June 6, 2011

Permit status: Na | Permit id: Asb80065 | Parcel: 0401870000
2011/06/060953 Longwood Av Boston Ma 02115
Interior renovations to include metal shelving patching &;painting
Date:  September 7, 2012

Permit status: Na | Permit id: Fdc180814 | Parcel: 0401870002
2012/09/070953 Longwood Av Boston Ma 02115
Renovation of existing space to include finishes flooring wall and millwork
Date:  February 11, 2014

Permit status: Na | Permit id: Fdc325414 | Parcel: 0401870000
2014/02/110953 Longwood Av Boston Ma 02115
To remove asbestos
Date:  November 17, 2010

Permit status: Na | Permit id: Asb52120 | Parcel: 0401870000
2010/11/170953 Longwood Av Boston Ma 02115
To remove asbestos from the childrens hospital- fegan building- 16th floor and roof;
Date:  March 2, 2010

Permit status: Na | Permit id: Asb16602 | Parcel: 0401870000
2010/03/020953 Longwood Av Boston Ma 02115
Construction of new office and renovation to include floors painting &; ceilings
Date:  March 8, 2012

Permit status: Na | Permit id: Fdc122588 | Parcel: 0401870002
2012/03/080953 Longwood Av Boston Ma 02115
Soldering associated with maintenance/repair of various mechanical systems @ main bldg
Date:  May 1, 2014

Permit status: Na | Permit id: Cbw357352 | Parcel: 0401870002
2014/05/010953 Longwood Av Boston Ma 02115
To remove asbestos from childrens hospital at 3 longwood ave
Date:  April 20, 2011

Permit status: Na | Permit id: Asb73117 | Parcel: 0401870002
2011/04/200953 Longwood Av Boston Ma 02115
Date:  October 30, 2012

Permit status: Na | Permit id: Aspce195356 | Parcel: 0401870002
2012/10/300953 Longwood Av Boston Ma 02115
Removal of asbestos from cagewish wing enders bldg
Date:  April 25, 2012

Permit status: Na | Permit id: Asb135624 | Parcel: 0401870000
2012/04/250953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 7. Doc#20130776
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259493 | Parcel: 0401870002
2013/07/160953 Longwood Av Boston Ma 02115
Hunnewell bldg-sprinkler route drill holes in plaster walls/ceiling &; plaster wall openings
Date:  August 22, 2014

Permit status: Na | Permit id: Asb399178 | Parcel: 0401870002
2014/08/220953 Longwood Av Boston Ma 02115
Convert office space in to research pharmacy upgrade flooring ceiling millwork &; paint new lighting 2 new sinks new diffusers and relocate 4 sprinkler heads.
Date:  September 12, 2014

Permit status: Na | Permit id: Fdc349712 | Parcel: 0401870002
2014/09/120953 Longwood Av Boston Ma 02115
SCORE
81
Concrete coring piping demo and removal
Date:  June 26, 2015
Contractor: Matthew Giovanni

Permit type: Bfd other | Permit status: Na | Permit id: Fdc488023 | Parcel: 0401870002
2015/06/260813 Longwood Av Boston Ma 02115Matthew Giovanni
12th floor mechanical room
Date:  March 29, 2010

Permit status: Na | Permit id: Asb19666 | Parcel: 0401870000
2010/03/290953 Longwood Av Boston Ma 02115
Drill holes w/shrouded drill
Date:  January 14, 2014

Permit status: Na | Permit id: Asb319160 | Parcel: 0401870002
2014/01/140953 Longwood Av Boston Ma 02115
Welding/cutting; associated with;piping maintenance of various mechanical systems bfd paid detail required
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459503 | Parcel: 0401886000
2015/04/070953 Longwood Av Boston Ma 02115
Hunnewell bldg-east wing/ clean above suspended ceiling tiles-drill holes-cut holes plaster for gc
Date:  June 2, 2014

Permit status: Na | Permit id: Asb368793 | Parcel: 0401870002
2014/06/020953 Longwood Av Boston Ma 02115
To remove asbestos from the 2nd floor room 221. 1
Date:  May 11, 2010

Permit status: Na | Permit id: Asb25357 | Parcel: 0401870000
2010/05/110953 Longwood Av Boston Ma 02115
Cutting burning &; welding for installation of hvac pipe in main bldg (dpl) bfd paid detail required
Date:  August 25, 2011

Permit status: Na | Permit id: Cbw86527 | Parcel: 0401870002
2011/08/250953 Longwood Av Boston Ma 02115
Welding/cutting associated;with maintenance ;of heating piping for various mechanical systems bfd paid detail required
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459528 | Parcel: 0401870002
2015/04/070953 Longwood Av Boston Ma 02115
Cutting / burning /welding associated with maintenance / repair of;hvac piping;system bfd paid detail required ((one bfd detail per welder/torch))
Date:  May 28, 2014

Permit status: Na | Permit id: Cbw366299 | Parcel: 0401870000
2014/05/280953 Longwood Av Boston Ma 02115
Welding cutting &; burning;associated with maintenance/repair of various mechanical systems @ farley pavillion bldg 2-firefighters required bfd paid detail required
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79131 | Parcel: 0401870002
2011/06/030953 Longwood Av Boston Ma 02115
Maintain existing fire alarm devicesand add new devices to tie into existing system doc#20101094
Date:  March 7, 2011

Permit status: Na | Permit id: Bfdf53963 | Parcel: 0401870002
2011/03/070953 Longwood Av Boston Ma 02115
Installation of pre-action fire alarm for the farley/pavilion electric room.; install base-building audio/visual units in the space. Work to be done per nfpa stands. 7 cmr. No occupancy in impaired zone.
Date:  February 28, 2014

Permit status: Na | Permit id: Bfdf322196 | Parcel: 0401870002
2014/02/280953 Longwood Av Boston Ma 02115
Renovations to include flooring &; ceilings
Date:  May 9, 2011

Permit status: Na | Permit id: Fdc75452 | Parcel: 0401870000
2011/05/090953 Longwood Av Boston Ma 02115
Fa renovation of farley 4 cat/ cr area 4th floor.; doc#20100595
Date:  August 2, 2010

Permit status: Na | Permit id: Bfdf34678 | Parcel: 0401870002
2010/08/020953 Longwood Av Boston Ma 02115
Main lobby renovation-sequence 3 of 7 doc#20130771 phase 1 heat detectors phase 2 new devices
Date:  July 16, 2013

Permit status: Na | Permit id: Bfdf259474 | Parcel: 0401870000
2013/07/160953 Longwood Av Boston Ma 02115
Lobby renovations to include new doors and patching to finishes
Date:  February 14, 2013

Permit status: Na | Permit id: Fdc219595 | Parcel: 0401870000
2013/02/140953 Longwood Av Boston Ma 02115
Welding / cutting &; heating for installation of chilled water valves and piping work being done in main building mechanical room bfd paid detail required
Date:  January 21, 2010

Permit status: Na | Permit id: Cbw11080 | Parcel: 0401870000
2010/01/210953 Longwood Av Boston Ma 02115
Welding &;brazing of hot/chilled water piping to install new fan coil units (dpl) bfd paid detail required
Date:  October 5, 2015

Permit status: Na | Permit id: Cbw525181 | Parcel: 0401870002
2015/10/050953 Longwood Av Boston Ma 02115
Removal and re-installation of existing fire alarm equiptment 78 units no new equiptment installed doc20121074
Date:  October 4, 2012

Permit status: Na | Permit id: Bfdf182209 | Parcel: 0401870002
2012/10/040953 Longwood Av Boston Ma 02115
Brazing for installation of medical gas &; plumbing in rm-cb 4101 mechanical to ma-4 mechanical 3926 in main bldg addition (dpl 6-30-2013); 2-firefighters bfd paid detail required
Date:  December 7, 2012

Permit status: Na | Permit id: Cbw193431 | Parcel: 0401870000
2012/12/070953 Longwood Av Boston Ma 02115
Welding of stainless steel &; black iron pipe@ enders research bldg ;(dpl) bfd paid detail required
Date:  March 4, 2011

Permit status: Na | Permit id: Cbw66005 | Parcel: 0401870002
2011/03/040953 Longwood Av Boston Ma 02115
Soldering only;associated with maintenance/repair of various mechanical systems @;enders bldg
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30739 | Parcel: 0401886000
2010/06/290953 Longwood Av Boston Ma 02115
Remove and relocate existing smokes and existing speaker strobes units add (2) new spearker/ strobes units
Date:  July 19, 2010

Permit status: Na | Permit id: Bfdf32509 | Parcel: 0401870000
2010/07/190953 Longwood Av Boston Ma 02115
Interior renovations to include doors frames patching &;painting
Date:  September 7, 2012

Permit status: Na | Permit id: Fdc180816 | Parcel: 0401870000
2012/09/070953 Longwood Av Boston Ma 02115
To remove asbestos from the fegan building on the basement and 1st floor
Date:  April 14, 2010

Permit status: Na | Permit id: Asb21627 | Parcel: 0401870002
2010/04/140953 Longwood Av Boston Ma 02115
Cutting &; welding of heating work associated with maintenance/repair of various mechanical systems @;enders bldg bfd paid detail required
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30738 | Parcel: 0401886000
2010/06/290953 Longwood Av Boston Ma 02115
Renovation of sub-basement lab areas with new devices (13) added; doc20110322
Date:  April 5, 2011

Permit status: Na | Permit id: Bfdf68722 | Parcel: 0401870002
2011/04/050953 Longwood Av Boston Ma 02115
The smoke control panel schematic is approved. The contractor shall schedule a test with;bfd to test the smoke control contol system. Approved on 5/17/12
Date:  October 4, 2011

Permit status: Na | Permit id: Bfdf87251 | Parcel: 0401870002
2011/10/040953 Longwood Av Boston Ma 02115
To remove asbestos from the 3 longwood ave childrens hospital
Date:  November 14, 2011

Permit status: Na | Permit id: Asb105519 | Parcel: 0401870002
2011/11/140953 Longwood Av Boston Ma 02115
Install new elevator recall smokes on floors sub-basement - 10th floor and new fire alarm system devices;in penthouse.; work to be done per nfpa stands. 7 cmr 7th ed. Doc#20100884
Date:  October 18, 2010

Permit status: Na | Permit id: Bfdf45313 | Parcel: 0401870002
2010/10/180953 Longwood Av Boston Ma 02115
To remove asbestos;
Date:  January 21, 2011

Permit status: Na | Permit id: Asb61377 | Parcel: 0401870002
2011/01/210953 Longwood Av Boston Ma 02115
To remove asbestos from the;enders building;9th floor
Date:  April 28, 2010

Permit status: Na | Permit id: Asb23579 | Parcel: 0401870002
2010/04/280953 Longwood Av Boston Ma 02115
Welding cutting &; burning for installation of permanent structural micro-piles for the support of excavation system
Date:  June 13, 2011

Permit status: Na | Permit id: Cbw81068 | Parcel: 0401870000
2011/06/130953 Longwood Av Boston Ma 02115
Cutting &; welding of new hot/chilled ;water piping in enders arch &; cage wash levels ;(dpl) bfd paid detail required
Date:  May 24, 2012

Permit status: Na | Permit id: Cbw143570 | Parcel: 0401870002
2012/05/240953 Longwood Av Boston Ma 02115
Cutting / burning / welding for installation of new hvac and plumbing systems for renovation work for each separate location bfd paid detail required
Date:  October 31, 2013

Permit status: Na | Permit id: Cbw299834 | Parcel: 0401870000
2013/10/310953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave - childrens hospital
Date:  August 1, 2011

Permit status: Na | Permit id: Asb88513 | Parcel: 0401870000
2011/08/010953 Longwood Av Boston Ma 02115
Renovation work of existing patient room and intensive care units to include arch finishes flooring painting and ceiling work
Date:  December 23, 2014

Permit status: Na | Permit id: Fdc436742 | Parcel: 0401870000
2014/12/230953 Longwood Av Boston Ma 02115
Cutting burning &; welding associated with maintenance/repair of various mechanical systems @;main bldg bfd paid detail required
Date:  June 29, 2010

Permit status: Na | Permit id: Cbw30740 | Parcel: 0401870002
2010/06/290953 Longwood Av Boston Ma 02115
Brazing for the installation of medical gas &; plumbing scope;in main bldg;(dpl 12-31-2013) bfd paid detail required
Date:  November 29, 2012

Permit status: Na | Permit id: Cbw203048 | Parcel: 0401870002
2012/11/290953 Longwood Av Boston Ma 02115
SCORE
74
Selective demo of offices and construction of new offices
Date:  August 7, 2015
Contractor: Brett Magnuson

Permit type: Bfd other | Permit status: Na | Permit id: Fdc502162 | Parcel: 0401870000
2015/08/070743 Longwood Av Boston Ma 02115Brett Magnuson
Cutting burning &; welding for installation of internal braced earth retention system
Date:  August 23, 2010

Permit status: Na | Permit id: Cbw38894 | Parcel: 0401870000
2010/08/230953 Longwood Av Boston Ma 02115
Cutting / burning / welding of miscellaneous steel for new steel erection (dpl) bfd paid detail required
Date:  June 20, 2013

Permit status: Na | Permit id: Cbw254611 | Parcel: 0401870002
2013/06/200953 Longwood Av Boston Ma 02115
Install temp heat detection in the enders 2nd &; 3rd floor bio-repositiry area. Sprinklers to remain fully acitve during work no patient occupancy in work area.
Date:  July 10, 2012

Permit status: Na | Permit id: Bfdf145169 | Parcel: 0401870000
2012/07/100953 Longwood Av Boston Ma 02115
To remove asbestos from the enders building floors 2-12
Date:  January 15, 2010

Permit status: Na | Permit id: Asb11329 | Parcel: 0401870002
2010/01/150953 Longwood Av Boston Ma 02115
SCORE
86
;demo;only of ;walls &; ceilings flooring concrete partations;
Date:  August 4, 2015
Contractor: Michael Nortey

Permit type: Bfd other | Permit status: Na | Permit id: Fdc498145 | Parcel: 0401870000
2015/08/040863 Longwood Av Boston Ma 02115Michael Nortey
11481wal-tie in new fire alarm equip in new building to existing system at chb doc20120271
Date:  April 24, 2012

Permit status: Na | Permit id: Bfdf123678 | Parcel: 0401870000
2012/04/240953 Longwood Av Boston Ma 02115
Welding ;cutting &; burning;associated with maintenance/repair of various mechanical systems in;main bldg 4-firefighters bfd paid detail required
Date:  December 16, 2010

Permit status: Na | Permit id: Cbw55607 | Parcel: 0401870002
2010/12/160953 Longwood Av Boston Ma 02115
Install and wire (1) new heat detector and (1) new remote indicating device doc#20100914
Date:  October 25, 2010

Permit status: Na | Permit id: Bfdf46685 | Parcel: 0401870002
2010/10/250953 Longwood Av Boston Ma 02115
Demo &; ;reconstruction of;existing curtain wall &;finishes
Date:  January 17, 2013

Permit status: Na | Permit id: Fdc214358 | Parcel: 0401870002
2013/01/170953 Longwood Av Boston Ma 02115
Cutting &; welding associated with maintenance/repair of hvac piping system in fegan bldg 2-firefighters required bfd paid detail required
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79116 | Parcel: 0401870000
2011/06/030953 Longwood Av Boston Ma 02115
Hunnewell bldg-sprinkler route. Drill holes in plaster walls/ceiling and plaster wall openings. Rms/hallwy
Date:  June 10, 2015

Permit status: Na | Permit id: Asb481952 | Parcel: 0401870002
2015/06/100953 Longwood Av Boston Ma 02115
To remove asbestos from the fegan building on the 10th floor
Date:  May 20, 2010

Permit status: Na | Permit id: Asb26695 | Parcel: 0401870000
2010/05/200953 Longwood Av Boston Ma 02115
To remove asbestos from the from the hunnewell building 2nd floor -room 282
Date:  March 19, 2010

Permit status: Na | Permit id: Asb18462 | Parcel: 0401870000
2010/03/190953 Longwood Av Boston Ma 02115
Demolition of partitions flooring ceiling and finish work
Date:  June 14, 2010

Permit status: Na | Permit id: Fdc29339 | Parcel: 0401870002
2010/06/140953 Longwood Av Boston Ma 02115
Removal of asbestos from;fegan &; pavilion bldgs
Date:  July 25, 2012

Permit status: Na | Permit id: Asb166359 | Parcel: 0401870000
2012/07/250953 Longwood Av Boston Ma 02115
Cutting burning &; welding for the installation of supplemental steel for stairs rails window &; wall supports bfd paid detail required
Date:  May 22, 2014

Permit status: Na | Permit id: Cbw360303 | Parcel: 0401870000
2014/05/220953 Longwood Av Boston Ma 02115
SCORE
100
Demo of ceilings flooring concrete &; existing cooling tower and installation of new ceilings flooring to accommodate relocation of new cooling tower. No hot work allowed
Date:  October 2, 2015
Contractor: Michele Engber

Permit type: Bfd other | Permit status: Na | Permit id: Fdc524903 | Parcel: 0401870000
2015/10/0201003 Longwood Av Boston Ma 02115Michele Engber
Childrens hospital
Date:  January 28, 2014

Permit status: Na | Permit id: Asb322459 | Parcel: 0401870002
2014/01/280953 Longwood Av Boston Ma 02115
Floor tile and associated mastic
Date:  February 20, 2014

Permit status: Na | Permit id: Asb327559 | Parcel: 0401870000
2014/02/200953 Longwood Av Boston Ma 02115
Welding only for the installation of curtain wall (dpl 7-5-2014) bfd paid detail required
Date:  February 11, 2014

Permit status: Na | Permit id: Cbw325440 | Parcel: 0401870000
2014/02/110953 Longwood Av Boston Ma 02115
Furnish &; wire (2) new audio/visual devices in the new utility tunnel doc#20100915
Date:  October 25, 2010

Permit status: Na | Permit id: Bfdf46801 | Parcel: 0401870002
2010/10/250953 Longwood Av Boston Ma 02115
To remove asbestos
Date:  January 13, 2011

Permit status: Na | Permit id: Asb58778 | Parcel: 0401870002
2011/01/130953 Longwood Av Boston Ma 02115
Welding for ;installation of strucrural support system;to support patient boom system;dpl3/23/14-4/24/15 bfd paid detail required
Date:  March 19, 2015

Permit status: Na | Permit id: Cbw454947 | Parcel: 0401870002
2015/03/190953 Longwood Av Boston Ma 02115
Childrens hospital/wolbach bldg-wb 107-108-126; clean above suspended ceiling tiles
Date:  May 28, 2014

Permit status: Na | Permit id: Asb367259 | Parcel: 0401870002
2014/05/280953 Longwood Av Boston Ma 02115
Renovations to include finishes flooring &; ceilings
Date:  December 20, 2013

Permit status: Na | Permit id: Fdc304138 | Parcel: 0401870000
2013/12/200953 Longwood Av Boston Ma 02115
Renovations of bathroom to include removal &; replacement of flooring toilet fixtures;&; lighting
Date:  December 20, 2013

Permit status: Na | Permit id: Fdc306736 | Parcel: 0401870000
2013/12/200953 Longwood Av Boston Ma 02115
Alterations will involve the removal of existing initiating devices or notification appliances.; the installation of temporary heat detectors &; new permanent devices.; work to be done per nfpa stands. Sub basement and sub sub basement.
Date:  July 10, 2012

Permit status: Na | Permit id: Bfdf147209 | Parcel: 0401870002
2012/07/100953 Longwood Av Boston Ma 02115
Renovations to existing space to include flooring paint ceiling and millwork
Date:  November 9, 2011

Permit status: Na | Permit id: Fdc104422 | Parcel: 0401870000
2011/11/090953 Longwood Av Boston Ma 02115
Hunnewell bldg. Sprinkler route drill holes in plaster walls/ceiling &; plaster wall openings-rms/hallway
Date:  December 18, 2014

Permit status: Na | Permit id: Asb435025 | Parcel: 0401870002
2014/12/180953 Longwood Av Boston Ma 02115
Cutting &; welding of brackets machine beam &; door frames for new elevator tower bfd paid detail required
Date:  September 27, 2012

Permit status: Na | Permit id: Cbw184457 | Parcel: 0401870000
2012/09/270953 Longwood Av Boston Ma 02115
1st floor plastic surgery clinic
Date:  March 29, 2010

Permit status: Na | Permit id: Asb19669 | Parcel: 0401870000
2010/03/290953 Longwood Av Boston Ma 02115
Brazing for plumbing installation of medical gas pipe in mechanical room (cb-4101 mech to ma-4 mech 3929) (dpl 3-31-2013)
Date:  November 3, 2011

Permit status: Na | Permit id: Cbw102720 | Parcel: 0401870002
2011/11/030953 Longwood Av Boston Ma 02115
Demolition of partitions flooring ceilings and;millwork
Date:  May 26, 2010

Permit status: Na | Permit id: Fdc27000 | Parcel: 0401870000
2010/05/260953 Longwood Av Boston Ma 02115
Cutting burning &; welding;for work;associated with maintenance of various mechanical systems @ main bldg ; bfd paid detail required
Date:  April 27, 2015

Permit status: Na | Permit id: Cbw459331 | Parcel: 0401870002
2015/04/270953 Longwood Av Boston Ma 02115
Welding only of steel decking for conduit installation for new fegan elevator tower
Date:  August 15, 2012

Permit status: Na | Permit id: Cbw173115 | Parcel: 0401870000
2012/08/150953 Longwood Av Boston Ma 02115
Temporary bagging of smoke detectors for dust control during demolition relocation and installation work
Date:  October 2, 2015

Permit status: Na | Permit id: Bsd525115 | Parcel: 0401870002
2015/10/020953 Longwood Av Boston Ma 02115
Childrens hospital boston bfd paid detail required
Date:  August 11, 2014

Permit status: Na | Permit id: Cbw392424 | Parcel: 0401870000
2014/08/110953 Longwood Av Boston Ma 02115
To remove asbestos from the 4th floor rooms 430- 466
Date:  February 19, 2010

Permit status: Na | Permit id: Asb15485 | Parcel: 0401870002
2010/02/190953 Longwood Av Boston Ma 02115
To conduct the following: install one (1) 5 0 btu kerosene fired unit heater to heat temporary cafeteria tent : applicant states they will not use diesel or kerosene. James quigley told me by phone call march 2 2015;that they would be using electricity for the heaters instead of kerosene.
Date:  February 5, 2015

Permit type: Temporary heat | Permit status: Na | Permit id: Gp444274 | Parcel: 0401870002
2015/02/050953 Longwood Av Boston Ma 02115
To remove asbestos from the ground floor; rooms 101 thro 143
Date:  April 23, 2010

Permit status: Na | Permit id: Asb22886 | Parcel: 0401870000
2010/04/230953 Longwood Av Boston Ma 02115
Cutting burning &; welding associated with maintenance/repair of various mechanical systems for main bldg ; bfd paid detail required
Date:  May 6, 2014

Permit status: Na | Permit id: Cbw358325 | Parcel: 0401870002
2014/05/060953 Longwood Av Boston Ma 02115
Cutting &; welding of hot/chilled water &; steam piping for each separate location bfd paid detail required
Date:  April 22, 2013

Permit status: Na | Permit id: Cbw235944 | Parcel: 0401870000
2013/04/220953 Longwood Av Boston Ma 02115
Cutting burning &; welding for the installation of new structural steel assembly (dpl) bfd paid detail required
Date:  October 1, 2015

Permit status: Na | Permit id: Cbw523468 | Parcel: 0401870002
2015/10/010953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave @ childrens hospital
Date:  April 5, 2011

Permit status: Na | Permit id: Asb70831 | Parcel: 0401870000
2011/04/050953 Longwood Av Boston Ma 02115
Renovations to include removal/replacement of equipment new drywall &; paint;
Date:  January 3, 2011

Permit status: Na | Permit id: Fdc57173 | Parcel: 0401870000
2011/01/030953 Longwood Av Boston Ma 02115
Date:  October 30, 2012

Permit status: Na | Permit id: Insmod195616 | Parcel: 0401870000
2012/10/300953 Longwood Av Boston Ma 02115
Bagging of smoke detectors
Date:  December 20, 2013

Permit status: Na | Permit id: Bsd306660 | Parcel: 0401870002
2013/12/200953 Longwood Av Boston Ma 02115
To remove asbestos from 3 longwood ave farley building
Date:  October 12, 2011

Permit status: Na | Permit id: Asb100348 | Parcel: 0401870000
2011/10/120953 Longwood Av Boston Ma 02115
Cutting &; welding for installation of supports @ new opening for access to new pump room bfd paid detail required
Date:  July 7, 2010

Permit status: Na | Permit id: Cbw30342 | Parcel: 0401870000
2010/07/070953 Longwood Av Boston Ma 02115
Cutting burning;&;welding;of pipe associated with maintenance of various mechanical systems @ main bldg bfd paid detail required
Date:  April 7, 2015

Permit status: Na | Permit id: Cbw459252 | Parcel: 0401870002
2015/04/070953 Longwood Av Boston Ma 02115
Renovation work to include concrete pad flooring paint and walls
Date:  March 27, 2012

Permit status: Na | Permit id: Fdc126540 | Parcel: 0401870000
2012/03/270953 Longwood Av Boston Ma 02115
Cutting welding &; burning ;associated with maintenance/repair of various mechanical systems @;enders bldg bfd paid detail required
Date:  June 3, 2011

Permit status: Na | Permit id: Cbw79144 | Parcel: 0401886000
2011/06/030953 Longwood Av Boston Ma 02115
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.