SCORE

ECS MIDATLANTI ECS MIDATLANTIC

ABOUT ECS MIDATLANTI ECS MIDATLANTIC

Ecs Midatlanti Ecs Midatlantic specializes in:

Ecs Midatlanti Ecs Midatlantic offers services:

Based on the information received from , associated with Ecs Midatlanti Ecs Midatlantic over the past .

If you are considering hiring Ecs Midatlanti Ecs Midatlantic for your home renovation project, we recommend using our bidding system to get competitive quotes.




QUALITY


Ecs Midatlanti Ecs Midatlantic has CheckPermit score of which places them above % of local contractors.
We usually recommend hiring a contractor with a rank of 75 or above.

ACTIVITY



AVERAGE PROJECT COST



PERMITS VALUATION



PROJECTS PER TOWN:



SERVICES
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
PROJECT IMAGES



RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
SCORE
56
101 N St Nw, Washington, Dc 20001
As directed by ddoe toxic substance division in a letter from mr. Richard jackson, dated february 21, 2014, ecs will install a total of four deep monitoring wells in areas where mip results indicated the potential presence of possible chlorinated solvents. The mip boring locations selected for deep monitoring well installation include m1, m2, m6, and m7. These wells are in addition to previously proposed wells in the area of the former usts. In addition to the four deep wells one additional deep well will be placed in the geothermal well. One shallow well will also be placed next to mip location m7 to monitor the upper aquifer conditions. In total this work plan covers the installation and sampling of six monitoring wells. The locations of the proposed monitoring wells are depicted on figure 1. The wells will be installed using a hollow-stem auger rig. Five of the wells will be completed to approximately 45 ft below ground surface and one well will be installed to approximately 25 ft b
Date:  March 6, 2014

Client: District Of Columbia Department Of General Service Gebrmichael | Permit type: Miscellaneous | Permit status: Permit issued | Permit id: Sb1400192
2014/03/06056101 N St Nw, Washington, Dc 20001Ecs Midatlanti Ecs Midatlantic
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.