SCORE 82 3 Brookline Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa 13. All impairments shall be coordinated with the buildings listed impairment coordinator (per nfpa 241) so that only one zone is impaired. Date: September 19, 2016 Contractor: Dean Allaire Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk627674 | Parcel: 0401862000 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and ;nfpa 13. Coordinate the impairment with the buildings impairment coordinator. Date: September 22, 2016 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk623507 | Parcel: 0801420000 | |||||
SCORE 82 3 Brookline Av Boston Ma Coordinate sprinkler impairment with the building listed impairment coordinator (required by nfpa 241) so that only one zone shall be impaired. Date: September 22, 2016 Contractor: Dean Allaire Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk630772 | Parcel: 0401862000 | |||||
SCORE 82 880888 Boylston St Boston Ma Relocate sprinkler heads on level 1 of the eataly tenant space. Sprinkler system to be tied into the existing 888 boylston street system. Date: September 28, 2016 Contractor: Dean Allaire Client: Bp Prucenter Acquisition Llc | Permit type: Bfd sprinkler system | Permit id: Sprk639472 | Parcel: 0401037100 | |||||
SCORE 82 25 Harvard St Boston Ma Replace damaged gate valve on underground fire protection service on ziskind building bfd paid detail required - 1 officer &; 3 firefighters w pump; Date: October 11, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk643412 | |||||
SCORE 82 1555 New Sudbury St Boston Ma Relocate (6) sprinklers on 10th floor due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: October 14, 2016 Contractor: Dean Allaire Client: United States Of Amer | Permit type: Bfd sprinkler system | Permit id: Sprk636174 | Parcel: 0302605000 | |||||
SCORE 82 3 Blackfan Ci Boston Ma Relocate sprinkler heads on 3rd floor due to architectural modifications. Work to be performed per nfpa 13 & 7 cmr. Date: October 18, 2016 Contractor: Dean Allaire Client: Clsb Condo Trust | Permit type: Bfd sprinkler system | Permit id: Sprk641300 | Parcel: 0401853020 | |||||
SCORE 82 New Sudbury St Boston Ma During this schedule impairment no other zone in the building shall be impaired. ; Date: October 20, 2016 Contractor: Dean Allaire Client: Bulfinch Congress Holdings | Permit type: Bfd sprinkler system | Permit id: Sprk637523 | Parcel: 0302700000 | |||||
SCORE 82 55 Fruit St Boston Ma No other zone in the building shall be impaired with this scheduled impairment. All impairments shall be coordinated with the hospital listed impairment coordinator Date: October 21, 2016 Contractor: Dean Allaire Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk639394 | Parcel: 0300370000 | |||||
SCORE 82 84 Seattle St Allston Ma Install new sprinkler system in basement level 1 and level 2 per nfpa 13 and 7 cmr requirements Date: October 24, 2016 Contractor: Dean Allaire Client: Harvard College Pres&fellows | Permit type: Bfd sprinkler system | Permit id: Sprk643463 | Parcel: 2200185000 | |||||
SCORE 82 3 Brookline Av Boston Ma Relocate sprinkler heads due to architectural changes on the 1st floor of the rabb building on bidmcs east campus. Installation per nfpa 13 and 7 cmr. Date: October 25, 2016 Contractor: Dean Allaire Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk647038 | Parcel: 0401862000 | |||||
SCORE 82 1 Kneeland St Boston Ma Relocate sprinkler heads on floors 3 4 8 11 12 and 14 due to architectural modifications per nfpa 13 and 7 cmr. Date: October 25, 2016 Contractor: Dean Allaire Client: Tufts N E Med Ctr Inc | Permit type: Bfd sprinkler system | Permit id: Sprk647520 | Parcel: 0305380000 | |||||
SCORE 82 32 Fruit St Boston Ma Relocate sprinkler heads throughout 5th and 6th floors of mgh yawkey. Work will be phased over a 18 month period. Floors will be zoned out and no more than 1 floor will be shut down at a time. Shutdowns to last no longer than 8 hours. (extension of sprk458361) Date: October 26, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk645682 | |||||
SCORE 82 322 Washington St Boston Ma Only one;floor;shall be impaired at any time. All impairments shall be coordinated with the buildings nfpa 241 impairment coordinator. Date: October 26, 2016 Contractor: Dean Allaire Client: One Transcript Llc | Permit type: Bfd sprinkler system | Permit id: Sprk647651 | Parcel: 0304637010 | |||||
SCORE 82 79 Channel Center S Boston Ma Relocate sprinkler heads on 3rd floor for tenant fit out. Work to be completed per nfpa 13 and 7 cmr. Date: October 26, 2016 Contractor: Dean Allaire Client: Five Channel Center Llc | Permit type: Bfd sprinkler system | Permit id: Sprk640930 | Parcel: 0602750030 | |||||
SCORE 82 1 Harbor St Boston Ma No other sprinkler zone shall be impaired within the building during this scheduled impairment. Coordinate impairment with the;buildings listed nfpa 241 impairment coordinator. Date: October 27, 2016 Contractor: Dean Allaire Client: Economic Development And | Permit type: Bfd sprinkler system | Permit id: Sprk618546 | Parcel: 0602674000 | |||||
SCORE 82 101 Seaport Bl Boston Ma Relocation of sprinkler heads on level 1 for tenant fit out. Work to be performed per nfpa 13 & 7 cmr. Date: November 1, 2016 Contractor: Dean Allaire Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk650839 | Parcel: 0602640030 | |||||
SCORE 82 1 Congress St Boston Ma Bfd witness test shall be scheduled with lt curry 617-343-3034 bfd paid detail required - 1 officer &; 3 firefighters w pump Date: November 1, 2016 Contractor: Dean Allaire Client: United States Of Amer | Permit type: Bfd sprinkler system | Permit id: Sprk647826 | Parcel: 0302605000 | |||||
SCORE 82 1 Franklin St Boston Ma Relocate sprinklers on level 49 (unit ph1b) due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: November 2, 2016 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk651668 | Parcel: 0304584010 | |||||
SCORE 82 1 High St Boston Ma Relocate sprinklers on level 13 and level 14 due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: November 2, 2016 Contractor: Dean Allaire Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk651031 | Parcel: 0304408000 | |||||
SCORE 82 1 Franklin St Boston Ma Relocation of existing sprinklers and installation of new sprinklers on level (unit 4706) due to architectural renovations per nfpa 13 and 7 cmr requirements Date: November 2, 2016 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk650146 | Parcel: 0304584010 | |||||
SCORE 82 8 Harrison Av Boston Ma Coordinate impairment with the listed buildings impairment coordinator per nfpa 241 so that only one zone is impaired at any given time within the building. This floor shall not be occupied during impairment Date: July 12, 2016 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk610497 | Parcel: 0801420000 | |||||
SCORE 82 149 Thirteenth St Boston Ma Installation per 7 cmr and nfpa 13..... Coordinate impairment with the buildings impairment coordinator so that only one impairment is in effect during this scheduled impairment. Bfd paid detail required Date: August 2, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk610944 | |||||
SCORE 82 8 Harrison Av Boston Ma Replace damaged fire pump test header control valve per nfpa 13 and 7 cmr requirements. Bfd paid detail required - 1 officer &; 4 ffs w pump; Date: September 15, 2016 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk636118 | Parcel: 0801420000 | |||||
SCORE 82 1 Franklin St Boston Ma Impairment is limited to;one zone at a time coordinate impairment with the buildings listed impairment coordinator Date: August 16, 2016 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk616532 | Parcel: 0304584010 | |||||
SCORE 82 2 Fenway Boston Ma Only one zone shall be impaired at any given time.... Install shall comply with 7 cmr and nfpa 72 Date: July 27, 2016 Contractor: Dean Allaire Client: Museum Of Fine Arts | Permit type: Bfd sprinkler system | Permit id: Sprk612626 | Parcel: 0401806000 | |||||
SCORE 82 Emerson Pl Boston Ma Relocate leaking standpipe distribution piping in basement electrical closet per nfpa 14 and 7 cmr requirements. Bfd paid detail required -- 1 officer &; 3 ffs w pump Date: August 31, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk623403 | |||||
SCORE 82 94108 Holton St Brighton Ma Relocate sprinklers off of existing dry system to accommodate new lab mock up. Sprinklers will be put back into original location upon removal of lab mock up. Installation per the requirements of 7 cmr and nfpa 13 Date: July 29, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk610929 | |||||
SCORE 82 149 Thirteenth St Boston Ma Conditions of approval: in addition to the mist system the buildings sprinkler system shall be maintained in this room installation shall comply with the requirements of nfpa 750. Date: August 11, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk616090 | |||||
SCORE 82 6 Bowdoin Sq Boston Ma Rework of sprinkler system on level 9 due to architectural changes. Work to be done per 7 cmr and nfpa 13. Date: September 13, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk626599 | |||||
SCORE 82 1 Emerson Pl Boston Ma Turn existing pendant sprinkler heads upright with the removal of ceiling tiles for temporary protection per nfpa 13 & 780cmr Date: August 5, 2016 Contractor: Dean Allaire Client: Erp Operating Lp | Permit type: Bfd sprinkler system | Permit id: Sprk610453 | Parcel: 0300449000 | |||||
SCORE 82 3 Brookline Av Boston Ma Installation of temp standpipe accompanied with standpipe air pac to monitor and alarm the standpipe during construction. The standpipe air pac will be monitored by local bell and beacon. In case of alarm the onsite construction manager will notify the sprinkler contractor to resolve the issue. Date: April 3, 2017 Contractor: Dean Allaire Client: Emmanuel College Trustees | Permit type: Bfd sprinkler system | Permit id: Sprk684065 | Parcel: 0401862030 | |||||
SCORE 82 7 Albany St Boston Ma ;installation shall be in accordance with the isd approved shop drawings 7 cmr and nfpa 13. Coordinate impairment with the building owners listed;nfpa 241 impairment coordinator so that no more than one sprinkler zone is impairment at any given time. Date: April 3, 2017 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk682790 | Parcel: 0801067020 | |||||
SCORE 82 1 Franklin St Boston Ma Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator so that no other sprinkler zones are impaired during this scheduled impairment Date: April 3, 2017 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk685697 | Parcel: 0304584010 | |||||
SCORE 82 Date: April 3, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk685690 | |||||
SCORE 82 7791 Seaport Bl Boston Ma Relocate existing and install new sprinklers in ben & jerrys space on first floor due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: April 4, 2017 Contractor: Dean Allaire Client: Watermark Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk680089 | Parcel: 0602640060 | |||||
SCORE 82 1 Post Office Sq Boston Ma Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator. Date: April 5, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk685818 | |||||
SCORE 82 123137 Guest St Brighton Ma Installation of temp standpipe accompanied with standpipe air pac to monitor and alarm the standpipe during construction. Please see attached documentation. Date: April 7, 2017 Contractor: Dean Allaire Client: Rail Spur Llc | Permit type: Bfd sprinkler system | Permit id: Sprk688443 | Parcel: 2201904004 | |||||
SCORE 82 3 Longwood Av Boston Ma Relocate existing and install new sprinklers on ground floor of the bader building due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: April 11, 2017 Contractor: Dean Allaire Client: Childrens Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk688892 | Parcel: 0401870000 | |||||
SCORE 82 Seaport Bl Boston Ma Install new sprinkler system on level 3 and 3. 5 per nfpa 13 and 7 cmr requirements Date: April 13, 2017 Contractor: Dean Allaire Client: Ms Boston Seaport Llc | Permit type: Bfd sprinkler system | Permit id: Sprk689399 | Parcel: 0602640020 | |||||
SCORE 82 1 N Beacon St Allston Ma Impairments shall be coordinated with the buildings nfpa 241 impairment coordinator. Date: April 14, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk690666 | |||||
SCORE 82 4 Blackfan Ci Boston Ma Part of the harvard institute for medicine project is a to replace existing fire department valves on floor 4 to new pressure reducing valves due to pressures on that floor being in excess of 175 psi. That would include all valves on the 2 combination standpipes and all valves on the 2 standpipes bfd paid detail required - 1 officer &; 3 firefighters w pump Date: April 25, 2017 Contractor: Dean Allaire Client: President And Fellows | Permit type: Bfd sprinkler system | Permit id: Sprk691758 | Parcel: 0401849000 | |||||
SCORE 82 1 Blossom St Boston Ma Relocate sprinklers on first floor of cox building due to architectural renovations per nfpa 13 and 7 cmr requirements Date: April 25, 2017 Contractor: Dean Allaire Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk697831 | Parcel: 0300370000 | |||||
SCORE 82 332 Longwood Av Boston Ma Relocate sprinklers in 1st floor byers conference room due to architectural renovations per nfpa 13 and 7 cmr requirements Date: April 25, 2017 Contractor: Dean Allaire Client: Childrens Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk699027 | Parcel: 0401885000 | |||||
SCORE 82 Date: April 25, 2017 Contractor: Dean Allaire Client: Opg 125 Summer Owner (de)llc | Permit type: Bfd sprinkler system | Permit id: Sprk692912 | Parcel: 0304256000 | |||||
SCORE 82 1725 Blackfan St Boston Ma Relocate existing and add new sprinklers in sub-basement of main building due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: April 25, 2017 Contractor: Dean Allaire Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk696407 | Parcel: 0401894000 | |||||
SCORE 82 204216 Massachusett Boston Ma Relocate sprinklers on 2nd floor due to architectural renovations per nfpa 13 and 7 cmr requirements Date: April 25, 2017 Contractor: Dean Allaire Client: First Church Of Christian | Permit type: Bfd sprinkler system | Permit id: Sprk700759 | Parcel: 0401185000 | |||||
SCORE 82 181 Newbury St Boston Ma Repack fire pump in basement due to leaking packing per nfpa requirements. Bfd paid detail required - 1 officer &; 3 firefighters w pump;(detail to remain on scene from start of shut down until the system is refilled tested approved and fully operational) Date: April 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk696454 | |||||
SCORE 82 Rowes Wh Boston Ma Relocate sensing lines on fire pump per nfpa requirements back up fire pump to remain active during work. Per cannistraro impairment letter dated 4 26 17. Date: May 3, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk696902 | |||||
SCORE 82 8 Harrison Av Boston Ma Impairment shall be coordinated with the buildings (menino bld) listed nfpa 241 impairment coordinate so that no other sprinkler zone is impaired within the building during this scheduled impairment. Date: May 8, 2017 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk694875 | Parcel: 0801420000 | |||||
SCORE 82 717 Melnea Cass Bl Boston Ma Coordinate impairment with buildings owner nfpa 241 impairment coordinator so that no other sprinkler zone is impaired during this scheduled impairment. Date: May 8, 2017 Contractor: Dean Allaire Client: Crosstown Center Hotel Llc | Permit type: Bfd sprinkler system | Permit id: Sprk696290 | Parcel: 0800900050 | |||||
SCORE 82 742744 Columbus Av Mission Hill Ma Installation of temp standpipe accompanied with standpipe air pac to monitor and alarm the standpipe during construction of new 22 story student residential high rise. The standpipe will be monitored by local bell and beacon and alarm will notify 24 hour security upon activation. Date: May 9, 2017 Contractor: Dean Allaire Client: Northeastern University | Permit type: Bfd sprinkler system | Permit id: Sprk697647 | Parcel: 0901401000 | |||||
SCORE 82 285 Centre St Boston Ma Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator. Bfd paid detail required - 1 officer &; 3 firefighters w pump Date: May 10, 2017 Contractor: Dean Allaire Client: Boston Housing Authority | Permit type: Bfd sprinkler system | Permit id: Sprk696734 | Parcel: 1002333100 | |||||
SCORE 82 3 Longwood Av Boston Ma Coordinate impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impairment within the building during this scheduled impairment. Date: May 23, 2017 Contractor: Dean Allaire Client: Childrens Hospital | Permit type: Bfd sprinkler system | Permit id: Sprk702191 | Parcel: 0401870002 | |||||
SCORE 82 742744 Columbus Av Mission Hill Ma Separate permit application is required for temporary standpipe system. Date: May 23, 2017 Contractor: Dean Allaire Client: Northeastern University | Permit type: Bfd sprinkler system | Permit id: Sprk702732 | Parcel: 0901401000 | |||||
SCORE 82 8 Harrison Av Boston Ma Coordinate impairment plan with buildings listed impairment coordinator so that no other sprinkler zone is impaired during this scheduled impairment. Sprinkler system shall be fully functioning at the end of each day. Date: May 24, 2017 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk704607 | Parcel: 0801420000 | |||||
SCORE 82 8 Harrison Av Boston Ma Coordinate impairment with the buildings nfpa 241;impairment coordinator so that no other sprinkler zone within the building is impaired during this scheduled impairment. Impaired sprinkler zone shall be fully restored within 8 hours. Date: May 25, 2017 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk705590 | Parcel: 0801420000 | |||||
SCORE 82 133 Brookline Av Boston Ma Impairment shall be coordinated with the buildings nfpa 241 impairment coordinator Date: May 30, 2017 Contractor: Dean Allaire Client: Harvard Vanguard Medical | Permit type: Bfd sprinkler system | Permit id: Sprk708118 | Parcel: 2100074000 | |||||
SCORE 82 4 Fenway Boston Ma Replacement of sprinkler heads in newly renovated dorm bathrooms on floors 2 through 6; no more than one floor at a time will be impaired for more then 8 hours per nfpa13 and 7 cmr.. Date: May 31, 2017 Contractor: Dean Allaire Client: Emmanuel College Trustees | Permit type: Bfd sprinkler system | Permit id: Sprk705543 | Parcel: 0401847000 | |||||
SCORE 82 2 Binney St Boston Ma Relocate existing sprinklers on 7th floor due to architectural renovations per nfpa 13 and 7 cmr requirements Date: April 25, 2017 Contractor: Dean Allaire Client: Dana-Farber Cancer | Permit type: Bfd sprinkler system | Permit id: Sprk698169 | Parcel: 0401919000 | |||||
SCORE 82 2 Binney St Boston Ma Relocate existing and install new sprinklers on 5th floor due to architectural renovations per nfpa 13 and 7 cmr requirements Date: April 25, 2017 Contractor: Dean Allaire Client: Dana-Farber Cancer | Permit type: Bfd sprinkler system | Permit id: Sprk698166 | Parcel: 0401919000 | |||||
SCORE 82 149 Thirteenth St Boston Ma Coordinate sprinkler;impairment with the buildings listed nfpa 241 impairment coordinator so that no other sprinkler zone within the building is impaired during this scheduled impairment. Date: May 31, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk703196 | |||||
SCORE 82 2 Binney St Boston Ma Conditions of approval: sprinkler system shall remain in any occupied space and egress path for occupied spaces. Impairment shall be coordinated with the building nfpa 241 impairment coordinator.; no other sprinkler zone shall be impaired during this scheduled impairment. Date: March 13, 2017 Contractor: Dean Allaire Client: Dana-Farber Cancer | Permit type: Bfd sprinkler system | Permit id: Sprk675931 | Parcel: 0401919000 | |||||
SCORE 82 57 Binney St Boston Ma Only one zone shall be impaired at any given time within the building coordinate impairment with the buildings owners nfpa 241 impairment coordinator. Date: June 1, 2017 Contractor: Dean Allaire Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk709286 | Parcel: 0401894000 | |||||
SCORE 82 3 Longwood Av Boston Ma Relocate existing and install new sprinklers in basement of main building due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: July 11, 2017 Contractor: Dean Allaire Client: Childrens Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk723195 | Parcel: 0401870000 | |||||
SCORE 82 117 Lincoln St Boston Ma Re-pack inspect and replace gland bolts on high rise and low rise fire pumps per nfpa requirements. Bfd paid detail required Date: July 11, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk726385 | |||||
SCORE 82 204216 Massachusett Boston Ma Coordinate impairment with the buildings nfpa 241 ;impairment coordinator so that no more than one zone shall be impaired at any time within the building. Date: June 19, 2017 Contractor: Dean Allaire Client: First Church Of Christian | Permit type: Bfd sprinkler system | Permit id: Sprk711194 | Parcel: 0401185000 | |||||
SCORE 82 375 Longwood Av Boston Ma Relocate existing and install new sprinklers on 4th floor of smith building due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: June 19, 2017 Contractor: Dean Allaire Client: Cong Adath Israel Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk715966 | Parcel: 0401996000 | |||||
SCORE 82 204216 Massachusett Boston Ma Relocate sprinklers in basement due to architectural renovations per nfpa 13 and 7 cmr requirements Date: June 19, 2017 Contractor: Dean Allaire Client: First Church Of Christian | Permit type: Bfd sprinkler system | Permit id: Sprk711193 | Parcel: 0401185000 | |||||
SCORE 82 Northern Av Boston Ma Coordinate impairment with the buildings nfpa 241 impairment coordinator so that no other sprinkler zone is impaired during this scheduled impairment. Date: June 19, 2017 Contractor: Dean Allaire Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk713532 | Parcel: 0602671025 | |||||
SCORE 82 243 Charles St Boston Ma Relocate existing and install new sprinklers on 3rd floor due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: June 19, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk715604 | |||||
SCORE 82 1725 Blackfan St Boston Ma Relocate sprinklers on 2nd floor of main building due to architectural renovations installation per nfpa 13 and 7 cmr requirements. Date: June 19, 2017 Contractor: Dean Allaire Client: Childrens Hospital Med Cntr | Permit type: Bfd sprinkler system | Permit id: Sprk715759 | Parcel: 0401894000 | |||||
SCORE 82 1 Blackfan Ci Boston Ma Relocate existing and install new sprinklers on 5th and 6th floor due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: June 19, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk712772 | |||||
SCORE 82 399 Boylston St Boston Ma Sprinkler impairment shall be coordinated with the building owners nfpa 241 impairment coordinator . Bfd paid detail required Date: June 26, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk717081 | |||||
SCORE 82 8 Harrison Ave Boston Ma Coordinate impairment with the buildings nfpa 241 listed impairment coordinator. Date: June 28, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk717984 | |||||
SCORE 82 Blossom St Boston Ma Install new sprinklers in new fire alarm closets in basement through 14th floor per nfpa 13 and 7 cmr requirements. Only one floor to be shut down at a time. Date: December 2, 2016 Contractor: Dean Allaire Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk660331 | Parcel: 0300370000 | |||||
SCORE 82 2 Avenue De Lafayett Boston Ma Relocate 3 sprinkler heads on the 6th floor due to architectural changes. Date: June 29, 2017 Contractor: Dean Allaire Client: Lafayette Abbey | Permit type: Bfd sprinkler system | Permit id: Sprk723385 | Parcel: 0304500200 | |||||
SCORE 82 Northern Av Boston Ma Remove sprinklers in main electric room on parking level 2 per nfpa 13 8. 15. 11. 3 Date: November 30, 2016 Contractor: Dean Allaire Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk658262 | Parcel: 0602671025 | |||||
SCORE 82 3 Longwood Av Boston Ma Only one sprinkler zone may be impaired at any time within the building.... Coordinated sprinkler impairment with the buildings listed nfpa 241 impairment coordinator..... Installation shall be in accordance with the requirements of 7 cmr and nfpa 13 and isd approved shop drawings. Date: January 26, 2017 Contractor: Dean Allaire Client: Childrens Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk668594 | Parcel: 0401870000 | |||||
SCORE 82 8 Harrison Ave Boston Ma Phase 04- this phase consists of a fit out of a portion of the existing menino first floor that will serve as new radiology department space. Per nfpa 13 and 7 cmr Date: July 5, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk722572 | |||||
SCORE 82 8 Harrison Ave Boston Ma Phase 05- this phase consists of a fit out of a portion of the existing menino first floor that will serve as new emergency department space. Per nfpa 13 and 7 cmr. Date: July 5, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk722574 | |||||
SCORE 82 8 Harrison Ave Boston Ma Phase 03a this phase consists of a fit out of a portion of the existing menino first floor that will serve as new emergency department space. Per nfpa 13 and 7 cmr Date: July 5, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk722566 | |||||
SCORE 82 8 Harrison Ave Boston Ma Phase 03 this phase consists of a fit out of a portion of the existing menino first floor that will serve as new radiology department space. Per nfpa 13 and 7 cmr Date: July 5, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk722562 | |||||
SCORE 82 8 Harrison Ave Boston Ma Phase 03b- this phase consists of a fit out of a portion of the existing menino first floor that will serve as new radiology department space. Per nfpa 13 and 7 cmr Date: July 5, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk722569 | |||||
SCORE 82 934 Parker St Boston Ma Replace leaking section of standpipe between the 5th &; 6th floor. Bfd paid detail required - 2 firefighters Date: July 6, 2017 Contractor: Dean Allaire Client: Boston Housing Auth | Permit type: Bfd sprinkler system | Permit id: Sprk726405 | Parcel: 1002333300 | |||||
SCORE 82 267 Charles St Boston Ma No other sprinkler;zone in the building shall be impaired during this scheduled impairment. Date: February 17, 2017 Contractor: Dean Allaire Client: Mass Gen Eye * Ear Inf | Permit type: Bfd sprinkler system | Permit id: Sprk676277 | Parcel: 0300381001 | |||||
SCORE 82 1 Franklin St Boston Ma Relocate sprinklers in unit 3605 on level due to architectural renovations per nfpa 1 3 and 7 cmr requirements. Date: December 2, 2016 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk659885 | Parcel: 0304584010 | |||||
SCORE 82 19 Thomson Pl Boston Ma System shall be installed tested in accordance with the requirements; of nfpa 13. Bfd paid detail required - 1 officer &; 3 firefighters w pump Date: January 26, 2017 Contractor: Dean Allaire Client: Fort Point Channel Investors | Permit type: Bfd sprinkler system | Permit id: Sprk670349 | Parcel: 0602652010 | |||||
SCORE 82 3 Brookline Av Boston Ma Relocate sprinkler heads on the 6th floor of the gryzmish buiding at bidmc due to architectural modifications. Work to be performed per nfpa 13 & 7 cmr. Date: November 15, 2016 Contractor: Dean Allaire Client: Beth Israel Deaconess | Permit type: Bfd sprinkler system | Permit id: Sprk650987 | Parcel: 0401862000 | |||||
SCORE 82 8 Harrison Ave Boston Ma Reconfiguration of sprinkler system in second floor fit out of the new infill addition for new neuro intervention radiology lab. Per nfpa 13 and 7 cmr. Please see attached impairment plans. Date: January 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671777 | |||||
SCORE 82 8 Harrison Ave Boston Ma No other sprinkler zone in the building shall be impaired during this scheduled impairment..... Coordinate impairment with the buildings listed nfpa 241 impairment coordinator..... Install shall be in accordance with the requirements of nfpa 13 ; 7 cmr and isd approved shop drawings Date: February 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk675613 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr nfpa standards and isd approved shop drawings. Coordinate sprinkler;impairment with buildings listed; nfpa 241 impairment coordinator so that only one zone is impaired at any given time within the building. Date: March 20, 2017 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk684323 | Parcel: 0801420000 | |||||
SCORE 82 6 Albany St Boston Ma No other sprinkler;zone in the building shall be impaired during this scheduled impairment coordinate impairment with the buildings listed nfpa 241 impairment coordinator. Installation shall be in accordance with the requirements of 7 cmr nfpa 13 and isd approved shop drawings. Date: February 23, 2017 Contractor: Dean Allaire Client: Biosquare Realty Tr | Permit type: Bfd sprinkler system | Permit id: Sprk675243 | Parcel: 0801066100 | |||||
SCORE 82 204216 Massachusett Boston Ma Turn existing sprinkler heads upright on 4th and 5th floors of the first church of christ scientist for temporary protection. Date: March 21, 2017 Contractor: Dean Allaire Client: First Church Of Christian | Permit type: Bfd sprinkler system | Permit id: Sprk688389 | Parcel: 0401185000 | |||||
SCORE 82 126 Border St East Boston Ma Installation of a new sprinkler system in a newly erected 6 story residential apartment building. Per nfpa 13 and 7 cmr Date: November 15, 2016 Contractor: Dean Allaire Client: Trinity Border Street Llc | Permit type: Bfd sprinkler system | Permit id: Sprk649800 | Parcel: 0105414000 | |||||
SCORE 82 1 Franklin St Boston Ma Relocate sprinklers in unit 4701 on level due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: December 2, 2016 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk659911 | Parcel: 0304584010 | |||||
SCORE 82 265 Franklin St Boston Ma No other sprinkler zone in the building shall be impaired during this scheduled impairment... Coordinate the impairment with the buildings listed nfpa 241 impairment coordinator. Date: March 6, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk678815 | |||||
SCORE 82 Date: March 6, 2017 Contractor: Dean Allaire Client: Fenway Ventures Point | Permit type: Bfd sprinkler system | Permit id: Sprk677992 | Parcel: 2100055000 | |||||
SCORE 82 698 Beacon St Boston Ma Marist fathers of boston building - relocate sprinkler heads on 1st floor of building due to architectural modifications. No existing fire alarm system in building. Date: January 30, 2017 Contractor: Dean Allaire Client: Marist Fathers Of Boston | Permit type: Bfd sprinkler system | Permit id: Sprk671767 | Parcel: 0504143000 | |||||
SCORE 82 8 Harrison Ave Boston Ma Reconfiguration of sprinkler system in second floor fit out of the new infill addition for new control room support space and catheterization lab. Per nfpa 13 and 7 cmr. Please see attached impairment plans. Date: January 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671779 | |||||
SCORE 82 2 Clarendon St Boston Ma Contact lt curry at 617-343-3034 to schedule bfd witness test;after replacement. Date: February 7, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671753 | |||||
SCORE 82 8 Harrison Ave Boston Ma Relocate and install new sprinklers on the first floor of the menino building per nfpa 13 and 7 cmr requirements. This is an extension of an existing permit #sprk526260 Date: November 15, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk638911 | |||||
SCORE 82 Blossom St Boston Ma Relocate existing and install new sprinklers on first floor due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: January 26, 2017 Contractor: Dean Allaire Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk665035 | Parcel: 0300370000 | |||||
SCORE 82 1 Post Office Sq Boston Ma Replace corroded manual dry standpipe in lower level garage and in stair 1g per nfpa 14 and 7 cmr requirements. Date: February 21, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk670370 | |||||
SCORE 82 204216 Massachusett Boston Ma Installation of new sprinklers main and branch lines that tie into existing sprinkler system in new 4th floor penthouse addition due to structural renovations per nfpa 13 and 7 cmr requirements. Date: February 2, 2017 Contractor: Dean Allaire Client: First Church Of Christian | Permit type: Bfd sprinkler system | Permit id: Sprk673120 | Parcel: 0401185000 | |||||
SCORE 82 114 Western Av Allston Ma No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator. Date: January 25, 2017 Contractor: Dean Allaire Client: Harvard College President | Permit type: Bfd sprinkler system | Permit id: Sprk668084 | Parcel: 2200268000 | |||||
SCORE 82 1 Franklin St Boston Ma Relocate sprinklers in unit 5503 on level 48 due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: February 2, 2017 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk672894 | Parcel: 0304584010 | |||||
SCORE 82 8 Harrison Ave Boston Ma Reconfiguration of sprinkler system in second floor fit out of the new infill addition for new consultation space. Per nfpa 13 and 7 cmr. Please see attached impairment plans. Date: January 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671785 | |||||
SCORE 82 123137 Guest St Brighton Ma Installation of a new sprinkler system throughout a newly erected 18 story high rise per nfpa 13 14 24 and 7 cmr Date: December 15, 2016 Contractor: Dean Allaire Client: Rail Spur Llc | Permit type: Bfd sprinkler system | Permit id: Sprk664266 | Parcel: 2201904004 | |||||
SCORE 82 4 Blackfan Ci Boston Ma No other sprinkler zone within the building shall be impaired during this scheduled impairment. Coordinate impairment with the buildings nfpa 241;impairment coordinator. Date: January 23, 2017 Contractor: Dean Allaire Client: President And Fellows | Permit type: Bfd sprinkler system | Permit id: Sprk667294 | Parcel: 0401849000 | |||||
SCORE 82 3 Brookline Av Boston Ma Installation of a new sprinkler system throughout newly erected high rise residence hall dormitory. Per nfpa 13 14 24 & 7 cmr Date: December 15, 2016 Contractor: Dean Allaire Client: Emmanuel College Trustees | Permit type: Bfd sprinkler system | Permit id: Sprk664274 | Parcel: 0401862030 | |||||
SCORE 82 44 Binney St Boston Ma Relocate sprinklers in ground floor kit storage suite due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: March 21, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk677425 | |||||
SCORE 82 1 Franklin St Boston Ma Relocate sprinklers on level (unit ph2b & ph2e) due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: November 9, 2016 Contractor: Dean Allaire Client: Four 26 Washington St Owner | Permit type: Bfd sprinkler system | Permit id: Sprk651663 | Parcel: 0304584010 | |||||
SCORE 82 85 Allerton St Boston Ma Installation of a new sprinkler system throughout a newly erected 3 story office building. Per nfpa standards and 7 cmr. Date: January 5, 2017 Contractor: Dean Allaire Client: Byda John | Permit type: Bfd sprinkler system | Permit id: Sprk670217 | Parcel: 0800957000 | |||||
SCORE 82 131131a Beverly St Boston Ma Installation of new sprinkler system for 17 story high rise per nfpa 13 14 24 & 7 cmr. Installtion of temporary standpipe to include standpipe pac (this is an extension of permit # sprk506587) Date: December 5, 2016 Contractor: Dean Allaire Client: Related Lovejoy Residential | Permit type: Bfd sprinkler system | Permit id: Sprk658936 | Parcel: 0303063000 | |||||
SCORE 82 11 Fan Pier Bl Boston Ma Remove sprinklers in main electric room on parking level 2 per nfpa 13 8. 15. 11. 3 Date: November 30, 2016 Contractor: Dean Allaire Client: Fan Pier Development Llc | Permit type: Bfd sprinkler system | Permit id: Sprk658255 | Parcel: 0602671025 | |||||
SCORE 82 8 Harrison Av Boston Ma Installation shall comply with the requirements of 7 cmr and nfpa standards coordinate sprinkler;impairment with buildings listed;nfpa 241 impairment coordinator (roger goudreau) so that only one zone is impaired at any given time within the building Date: March 6, 2017 Contractor: Dean Allaire Client: Boston Public Health Comm | Permit type: Bfd sprinkler system | Permit id: Sprk678934 | Parcel: 0801420000 | |||||
SCORE 82 275 Charles St Boston Ma Relocate sprinklers on 12th floor due to architectural renovations per nfpa 13 and 7 cmr requirements. Date: November 21, 2016 Contractor: Dean Allaire Client: General Hospital Corp | Permit type: Bfd sprinkler system | Permit id: Sprk657920 | Parcel: 0300371000 | |||||
SCORE 82 8 Harrison Ave Boston Ma Reconfiguration of sprinkler system in second floor fit out of the new infill addition for new pacu. Per nfpa 13 and 7 cmr. Please see attached impairment plans. Date: January 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671781 | |||||
SCORE 82 136 Harrison Av Boston Ma Heat detectors shall be installed and tested; by bfd;prior to impairing the sprinkler system.; there shall be no other impairment in the entire building during this scheduled impairment. The buildings impairment coordinator cory pouliot shall notify bfd if there are any changes to the buildings nfpa 241. Date: November 30, 2016 Contractor: Dean Allaire Client: Tufts University Trst | Permit type: Bfd sprinkler system | Permit id: Sprk647671 | Parcel: 0305251000 | |||||
SCORE 82 Binney St Boston Ma No other sprinkler;zone within the building shall be impaired during this scheduled impairment.... Verify with the buildings nfpa 241 impairment coordinator. Date: January 12, 2017 Contractor: Dean Allaire Client: Dana Farber Cancer Institute | Permit type: Bfd sprinkler system | Permit id: Sprk668548 | Parcel: 0401914002 | |||||
SCORE 82 32 Fruit St Boston Ma Turn existing sprinklers in 6th floor x-ray room 6448 upright to provide temporary protection. Install new sprinklers and branch lines due to architectural renovations. Demo existing sprinklers and branch lines when installation is complete. Date: November 9, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk650943 | |||||
SCORE 82 8 Harrison Ave Boston Ma Reconfiguration of sprinkler system in second floor fit out of the new infill addition for new locker rooms and catheterization labs . Per nfpa 13 and 7 cmr. Please see attached impairment plans. Date: January 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671768 | |||||
SCORE 82 5 Soldiers Field Rd Allston Ma Install (5) new sprinklers in 2nd floor autoclave clean room per nfpa 13 and 7 cmr requirements. Date: November 16, 2016 Contractor: Dean Allaire Client: Harvard Re Allston Inc | Permit type: Bfd sprinkler system | Permit id: Sprk653112 | Parcel: 2200301100 | |||||
SCORE 82 8 Harrison Ave Boston Ma Reconfiguration of sprinkler system in second floor fit out of the new infill addition for operating rooms ep lab and support spaces. Per nfpa 13 and 7 cmr. Please see attached impairment plans. Date: January 27, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk671765 | |||||
SCORE 82 Guest St Boston Ma Only one sprinkler zone shall be impaired at any given time within the building. Coordinate impairment with the buildings listed nfpa 241 impairment coordinator. Date: January 26, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk668476 | |||||
SCORE 82 1 Harbor St Boston Ma No other zone shall be impaired in the building during this scheduled impairment coordinate impairment with the buildings impairment coordinator. Installation shall be in accordance with 7 cmr nfpa 13 and isd approved shop drawings. Date: December 5, 2016 Contractor: Dean Allaire Client: Economic Development And | Permit type: Bfd sprinkler system | Permit id: Sprk659334 | Parcel: 0602674000 | |||||
SCORE 82 8 Harrison Ave Boston Ma Relocate and install new sprinklers on the basement level of the menino building per nfpa 13 and 7 cmr requirements. This is an extension of an existing permit #sprk526268 Date: November 15, 2016 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk638906 | |||||
SCORE 82 110126 Boylston St Boston Ma Installation of new sprinkler system in basement and level 1. Temporary heat detectors to be installed per attached nfpa 241 plan. Date: November 15, 2016 Contractor: Dean Allaire Client: Emerson College | Permit type: Bfd sprinkler system | Permit id: Sprk635203 | Parcel: 0500043010 | |||||
SCORE 82 25 Fid Kennedy Av Boston Ma Installation of a new sprinkler system throughout the entire building of newly renovated warehouse fabrication shop. Date: November 21, 2016 Contractor: Dean Allaire Client: Economic Development And | Permit type: Bfd sprinkler system | Permit id: Sprk636970 | Parcel: 0602674000 | |||||
SCORE 82 5 Rutherford Av Charlestown Ma Relocate sprinkler heads on level 2 due to architectural changes. Work to be performed per nfpa 13 & 7 cmr. Date: July 19, 2017 Contractor: Dean Allaire Client: Hood Park Llc | Permit type: Bfd sprinkler system | Expiration date: July 19, 2018 | Permit id: Sprk731939 | Parcel: 0202161000 | |||||
SCORE 82 185 Pilgrim Rd Boston Ma Replace sprinkler heads on level 04 room 0416 of the farr building at beth israel deaconess medical center. Date: July 20, 2017 Contractor: Dean Allaire Permit type: Bfd sprinkler system | Permit id: Sprk728831 |