Building Permits at 1 High St Boston MA


Estimated Price

Beds

Baths

Rooms

Sq.Ft.

Built:   Lot size:   Taxed:
RENOVATION HISTORY
Based on the information received from building department, associated with 1 High St Boston MA over the past .

If you are considering hiring for your home renovation project, we recommend using our bidding system to get competitive quotes.

ACTIVITY



PERMITS VALUATION



RENOVATIONS
Find out the best time of the year to complete your project on a minimal budget.
Get several free quotes from best contractors in your area.

REQUEST A QUOTE
Explore CheckPermit
Our dataset includes 30 milion building permits across 4 million addresses in US.

We analyzed and ranked over 1 million home remodeling contractors based on official government sources.

Every contractor's rank is calculated based on official government records.
RECENT PROJECTS


Content Date Cost Contractor Rank Address Contractor
Stand vehicles at curb for filming/ all work all day
Date:  July 7, 2015

Client: Equity Office | Permit type: Street occupancy permit | Expiration date: July 12, 2015 | Permit id: Occu-487359 | Parcel: 0304408000
2015/07/070951 High St Boston Ma
Bfd chemist certificate proces
Date:  August 5, 2015

Client: Equity Office | Permit id: Chm499160 | Parcel: 0304408000
2015/08/050951 High St Boston Ma
Minor renovation of existing office space on 15th floor; ~; doc# 20140859
Date:  July 22, 2014

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf379754 | Parcel: 0304408000
2014/07/220951 High St Boston Ma
Only one floor shall be impaired at any given time
Date:  January 7, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk435051 | Parcel: 0304408000
2015/01/070951 High St Boston Ma
Bagging of smoke detectors
Date:  June 12, 2013

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd251333 | Parcel: 0304408000
2013/06/120951 High St Boston Ma
SCORE
94
2nd & 3rd floor renovation
Date:  February 10, 2015
Value:   $15,000
Contractor: David Mccarthy

Client: Equity Office | Permit type: Plumbing permit | Expiration date: August 10, 2015 | Current use: Comm | Permit id: Pl445215 | Parcel: 0304408000
2015/02/1015000941 High St Boston MaDavid Mccarthy
SCORE
72
Renovation of 9th floor common corridor upgrade wiring and new devices...~; doc# 20141482
Date:  December 11, 2014

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf419056 | Parcel: 0304408000
2014/12/110721 High St Boston MaMichael Desesa Frisoli Electric
Minor renovation to existing office space on 5th floor &; f /a upgrade; ~; doc# 20141076
Date:  August 18, 2014

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf391994 | Parcel: 0304408000
2014/08/180951 High St Boston Ma
Relocating existing pendant sprinkler heads to new upright sprinkler heads in the 2nd floor vacant space after the ceilings are removed.; work is a head-for-head relocate. Work to be done one floor zone at a time per nfpa stands. 7 cmr.
Date:  August 21, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk172574 | Parcel: 0304408000
2012/08/210951 High St Boston Ma
SCORE
100
Installation of plumbing for a kitchen sink
Date:  August 18, 2014
Value:   $6,400
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 18, 2015 | Current use: Comm | Permit id: Pl395520 | Parcel: 0304408000
2014/08/1864001001 High St Boston MaKevin Maceachern
SCORE
100
Low voltage wiring
Date:  January 25, 2011
Value:   $92,953
Contractor: Christine Mckeown

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 25, 2011 | Current use: Comm | Permit id: Elv61648 | Parcel: 0304408000
2011/01/25929531001 High St Boston MaChristine Mckeown
Relocate 33 existing sprinkler leads to new location on the 15th fl. Work to be done per nfpa stands. One floor zone at a time.
Date:  July 30, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk164881 | Parcel: 0304408000
2012/07/300951 High St Boston Ma
SCORE
100
Installation of plumbing for a kitchen sink
Date:  October 7, 2014
Value:   $4,300
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: April 7, 2015 | Current use: Comm | Permit id: Pl414282 | Parcel: 0304408000
2014/10/0743001001 High St Boston MaKevin Maceachern
SCORE
95
Install 46 luminaries.
Date:  January 28, 2010
Value:   $1
Contractor: Brian Murphy

Permit type: Electrical permit | Expiration date: July 28, 2010 | Current use: Comm | Permit id: E12404 | Parcel: 0304045000
2010/01/281951 High St Boston MaBrian Murphy
Turn up of (230) existing sprinkler heads on 7th floor
Date:  August 6, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk163558 | Parcel: 0304408000
2012/08/060951 High St Boston Ma
SCORE
89
Interior renovation of office space includes gwb painting electrical hvac &;^ plumbing.
Date:  August 3, 2012
Value:   $400,000
Contractor: John Ladakakos

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: February 3, 2013 | Current use: Comm | Permit id: Alt166042 | Parcel: 0304408000
2012/08/03400000891 High St Boston MaJohn Ladakakos
Bfd chemist certificate proces
Date:  July 5, 2012

Client: Equity Office | Permit id: Chm159771 | Parcel: 0304408000
2012/07/050951 High St Boston Ma
Fire alarm revision;of office space on 2 &; 3.; 24 devices work per nfpa stands 7 cmr. ; ~; doc# 20150090
Date:  March 19, 2015

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf447505 | Parcel: 0304408000
2015/03/190951 High St Boston Ma
SCORE
100
Demolition of existing drywall. Construction of new drywall. New electrical plumbing hvac sprinkler flooring and millwork.
Date:  September 29, 2014
Value:   $422,128
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: March 29, 2015 | Current use: Comm | Permit id: Alt406138 | Parcel: 0304408000
2014/09/294221281001 High St Boston MaJonathan Lake
SCORE
100
New lights outlets and fire alarm modification
Date:  June 24, 2013
Value:   $19,000
Contractor: Ronald Forgione

Client: Equity Office | Permit type: Electrical permit | Expiration date: December 24, 2013 | Current use: Comm | Permit id: E256077 | Parcel: 0304408000
2013/06/24190001001 High St Boston MaRonald Forgione
SCORE
99
Tenant fitout consisting of new walls finishes hvac lighting electrical fire alarm and rework of existing sprinkler system to fit the new layou.
Date:  July 6, 2012
Value:   $376,500
Contractor: Joe Crowley

Client: Equity Office | Permit type: Long form/alteration permit | Current use: Comm | Permit id: Alt151396 | Parcel: 0304408000
2012/07/06376500991 High St Boston MaJoe Crowley
Renovation of existing office space; ~; doc# 20150366
Date:  July 10, 2015

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf484956 | Parcel: 0304408000
2015/07/100951 High St Boston Ma
SCORE
100
Control work
Date:  August 12, 2011
Value:   $5,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: February 12, 2012 | Current use: Comm | Permit id: E90646 | Parcel: 0304408000
2011/08/1250001001 High St Boston MaJohn Omahony
Alteration of existing system: doc#201209 - storage room smoke detector to initiate smoke control system functions.
Date:  August 20, 2012

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf168834 | Parcel: 0304408000
2012/08/200951 High St Boston Ma
Smoke detection is; being added for a new tel/data closet build-out on 25th floor; ~; doc# 20120281 smoke detector activation to initiate auxiliary functions also ie. Smoke control/stair pressurization/door release.
Date:  March 29, 2012

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf123797 | Parcel: 0304408000
2012/03/290951 High St Boston Ma
SCORE
100
S13-467. Control wiring for vav boxes.
Date:  June 19, 2013
Value:   $2,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: December 19, 2013 | Current use: Comm | Permit id: E255247 | Parcel: 0304408000
2013/06/1920001001 High St Boston MaJohn Omahony
Burning / welding for installation of new structural steel (dpl- 7/16/10) bfd paid detail required
Date:  May 24, 2010

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw26387 | Parcel: 0304408000
2010/05/240951 High St Boston Ma
SCORE
100
Interior renovations on 15th fllor which include demo drywall new finishes sprinkler and electrical
Date:  July 1, 2014
Value:   $73,865
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: January 1, 2015 | Current use: Comm | Permit id: Alt376159 | Parcel: 0304408000
2014/07/01738651001 High St Boston MaJonathan Lake
SCORE
100
New outlets floor boxes reloacte lights
Date:  December 5, 2013
Value:   $36,000
Contractor: Ronald Forgione

Client: Equity Office | Permit type: Electrical permit | Expiration date: June 5, 2014 | Current use: Comm | Permit id: E308844 | Parcel: 0304408000
2013/12/05360001001 High St Boston MaRonald Forgione
SCORE
100
Installation of plumbing for a kitchen sink
Date:  August 18, 2014
Value:   $6,400
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 18, 2015 | Current use: Comm | Permit id: Pl395530 | Parcel: 0304408000
2014/08/1864001001 High St Boston MaKevin Maceachern
Relocating existing pendent sprinkler heads to new upright sprinkler heads in the first floor vacant retail space after the ceilings are removed.; the upright sprinklers will be installed to provide coverage.; the retail space has its own shut-off valve.; the work is a head-for-head relocate. Work to be done per nfpa stands. 7 cmr one floor zone at a time.
Date:  January 22, 2013

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk162083 | Parcel: 0304408000
2013/01/220951 High St Boston Ma
Burning &; welding for the removal of internal stair &; in-filling with new slab (dpl) bfd paid detail required
Date:  February 12, 2014

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw324451 | Parcel: 0304408000
2014/02/120951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during cutting / burning / welding
Date:  February 28, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd326936 | Parcel: 0304408000
2014/02/280951 High St Boston Ma
SCORE
100
Install emt breakers thhn and associated hardware as required to extend (2) 15a circuits and (2) 20a circuits from an existing electrical panel. @ level (3) communications 1 high street boston ma 29th floor
Date:  July 23, 2014
Value:   $2,500
Contractor: John Mclaughlin

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 23, 2015 | Current use: Comm | Permit id: E387112 | Parcel: 0304408000
2014/07/2325001001 High St Boston MaJohn Mclaughlin
Special effects for the production/performances of "black mass"-interior office sequences-fbi headquarters product name: look solutions fog/haze fluid bfd paid detail required
Date:  July 15, 2014

Client: Equity Office | Permit type: Bfd general permit | Permit id: Gp383991 | Parcel: 0304408000
2014/07/150951 High St Boston Ma
Relocate 25 existing sprinklers on 8th floor. Work to be done per nfpastands. One floor zone at a time.
Date:  October 11, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk97597 | Parcel: 0304408000
2011/10/110951 High St Boston Ma
Relocate #254 existing sprinkler heads to new ceiling grid. Work to be done one floor zone at a time. Work to be done per nfpa 13 stands.
Date:  May 27, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk78440 | Parcel: 0304408000
2011/05/270951 High St Boston Ma
Bfd chemist certificate proces
Date:  June 23, 2014

Client: Equity Office | Permit id: Chm376312 | Parcel: 0304408000
2014/06/230951 High St Boston Ma
Relocate (10) existing sprinklers on ground floor. Work to be done one floor zone at a time per nfpa stands.
Date:  July 27, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk86636 | Parcel: 0304408000
2011/07/270951 High St Boston Ma
Turn sprinklers to the up-right position to provide temporary protection for construction/demo project. Work to be done per nfpa stands. 7 cmr. One floor zone at a time.
Date:  March 20, 2014

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk341319 | Parcel: 0304408000
2014/03/200951 High St Boston Ma
SCORE
100
Tenant fit up of 20th floor
Date:  September 30, 2010
Value:   $185,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 30, 2011 | Current use: Comm | Permit id: E45050 | Parcel: 0304408000
2010/09/301850001001 High St Boston MaMarc Frisoli
Remodel 20th floor; ~; doc# 20120852
Date:  August 15, 2012

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf162427 | Parcel: 0304408000
2012/08/150951 High St Boston Ma
Relocating existing pendant heads to suit the tenant renovations on the 15th fl 9 sprinklers
Date:  December 20, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk207830 | Parcel: 0304408000
2012/12/200951 High St Boston Ma
Temporary bagging of smoke detectors
Date:  January 2, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd438234 | Parcel: 0304408000
2015/01/020951 High St Boston Ma
Relocate (98) existing sprinkler heads to new location on the 15th floor. Work to be done one floor zone at a time per nfpa stands. 7 cmr.
Date:  August 28, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk172508 | Parcel: 0304408000
2012/08/280951 High St Boston Ma
SCORE
61
Low voltage wiring zurich insurance
Date:  August 20, 2010
Value:   $45,000
Contractor: Stephen Mahon

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: February 20, 2011 | Current use: Comm | Permit id: Elv39212 | Parcel: 0304408000
2010/08/2045000611 High St Boston MaStephen Mahon
Bfd chemist certificate proces
Date:  August 21, 2013

Client: Equity Office | Permit id: Chm277230 | Parcel: 0304408000
2013/08/210951 High St Boston Ma
SCORE
100
New lights outlets and demo
Date:  August 10, 2014
Value:   $7,900
Contractor: Ronald Forgione

Client: Equity Office | Permit type: Electrical permit | Expiration date: February 10, 2015 | Current use: Comm | Permit id: E383417 | Parcel: 0304408000
2014/08/1079001001 High St Boston MaRonald Forgione
SCORE
100
Add 1 smoke det. And reinstall 13 existing speaker strobes in new ceiling
Date:  August 9, 2012
Value:   $4,000
Contractor: Bruce Cialdea

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: February 9, 2013 | Current use: Comm | Permit id: Efa171367 | Parcel: 0304408000
2012/08/0940001001 High St Boston MaBruce Cialdea
SCORE
93
Minor interior improvements to existing commercial office space to include demo new drywall ceiling flooring and finishes. 5th floor
Date:  January 31, 2014
Value:   $355,000
Contractor: Daniel Guimond

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: July 31, 2014 | Current use: Comm | Permit id: Alt318460 | Parcel: 0304408000
2014/01/31355000931 High St Boston MaDaniel Guimond
SCORE
61
Actual work being done at 1 high st. Floors 13-14.
Date:  September 23, 2010
Value:   $4,000
Contractor: Vincent Tamburello

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: March 23, 2011 | Current use: Comm | Permit id: Elv43995 | Parcel: 0304408000
2010/09/234000611 High St Boston MaVincent Tamburello
Relocating existing sprinkler heads to accommodate the expansion of an existing tenant on the 26th floor (12 sprinklers)
Date:  June 10, 2013

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk248446 | Parcel: 0304408000
2013/06/100951 High St Boston Ma
Relocate (11) existing sprinkler heads to new ceiling grid
Date:  July 10, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk157850 | Parcel: 0304408000
2012/07/100951 High St Boston Ma
SCORE
100
16th 17th 18th floors remodel itg
Date:  January 14, 2011
Value:   $230,000
Contractor: William Weber

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 14, 2011 | Current use: Comm | Permit id: E58334 | Parcel: 0304408000
2011/01/142300001001 High St Boston MaWilliam Weber
Minor renovations to existing 8th fl tenant space doc20111099
Date:  November 3, 2011

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf101025 | Parcel: 0304408000
2011/11/030951 High St Boston Ma
Coordinated impairment with building management so that only one floor is impaired at any given time. Installation in accordance with nfpa 13
Date:  October 3, 2013

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk287421 | Parcel: 0304408000
2013/10/030951 High St Boston Ma
SCORE
100
Minor renovation to existing office space on the 15th floor (statpro multifond)
Date:  July 3, 2014
Value:   $4,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: January 3, 2015 | Current use: Comm | Permit id: Efa380141 | Parcel: 0304408000
2014/07/0340001001 High St Boston MaJeffrey Catalano
SCORE
100
Bathroom fixture upgrades
Date:  August 20, 2015
Value:   $87,631
Contractor: Michael Petrilli

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 20, 2016 | Current use: Comm | Permit id: Pl510179 | Parcel: 0304408000
2015/08/20876311001 High St Boston MaMichael Petrilli
Bfd chemist certificate proces
Date:  March 31, 2014

Client: Equity Office | Permit id: Chm348259 | Parcel: 0304408000
2014/03/310951 High St Boston Ma
SCORE
79
Supply and install 3 break room sinks and hot water heaters. 2 on 14th floor and 1 on 13th floor. Tenant is zurich insurance.
Date:  August 26, 2010
Value:   $20,000
Contractor: Ronald Donohoe

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 26, 2011 | Current use: Comm | Permit id: Pl39485 | Parcel: 0304408000
2010/08/2620000791 High St Boston MaRonald Donohoe
Renovation to existing office space on the 10th floor. Bfdf20130649
Date:  July 10, 2013

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf250111 | Parcel: 0304408000
2013/07/100951 High St Boston Ma
Relocate (39) sprinkler heads.; turn up heads to meet code on 5th floor. Work to be done per nfpa stands. 7 cmr.
Date:  February 18, 2014

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk324517 | Parcel: 0304408000
2014/02/180951 High St Boston Ma
Relocate and add new sprinklers to accommodate new ceiling floors 13 &; 14 one floor impaired at a time
Date:  August 20, 2010

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk38595 | Parcel: 0304408000
2010/08/200951 High St Boston Ma
SCORE
95
Job number 11694 - zuora security - 1 high street - install security system 12th floor
Date:  August 21, 2015
Value:   $3,000
Contractor: Brian Murphy

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: February 21, 2016 | Current use: Comm | Permit id: Elv506295 | Parcel: 0304408000
2015/08/213000951 High St Boston MaBrian Murphy
SCORE
88
Build out of unfinished half of 16th floor @ 1 high street. Work to include new finishes such as carpet vct wood flooring drywall and paint acoustical ceiling and millwork. Mechanical work to include select new hvac equipment air distribution devices sink electric water heater dishwasher refrigerator and the relocation of select fire protection heads. Electrical work to include new receptacles light fixtures and fire alarm devices.
Date:  April 15, 2011
Value:   $500,000
Contractor: Greg St. Mary

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: October 15, 2011 | Current use: Comm | Permit id: Alt70662 | Parcel: 0304408000
2011/04/15500000881 High St Boston MaGreg St. Mary
SCORE
100
Instalation of plumbing for two kitchen sinks
Date:  May 2, 2011
Value:   $10,000
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: November 2, 2011 | Current use: Comm | Permit id: Pl74084 | Parcel: 0304408000
2011/05/02100001001 High St Boston MaKevin Maceachern
Provide coverage in new tenant fit out area. Doc#20141428
Date:  November 14, 2014

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf415178 | Parcel: 0304408000
2014/11/140951 High St Boston Ma
SCORE
82
Install new structured cables.
Date:  December 10, 2013
Value:   $3,800
Contractor: Odair Dasilva

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: June 10, 2014 | Current use: Comm | Permit id: Elv311078 | Parcel: 0304408000
2013/12/103800821 High St Boston MaOdair Dasilva
SCORE
100
Demo ceilings and partitions electrical demo painting
Date:  July 13, 2012
Value:   $54,000
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: January 13, 2013 | Current use: Comm | Permit id: Sf162352 | Parcel: 0304408000
2012/07/13540001001 High St Boston MaJonathan Lake
SCORE
100
Low voltage wiring - zurich
Date:  November 3, 2011
Value:   $3,000
Contractor: Christine Mckeown

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: May 3, 2012 | Current use: Comm | Permit id: Elv103872 | Parcel: 0304408000
2011/11/0330001001 High St Boston MaChristine Mckeown
Minor demo non structural;&; interior alteration to include general finishes removal &; relocation of mep systems.
Date:  December 11, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc433558 | Parcel: 0304408000
2014/12/110951 High St Boston Ma
Temporary bagging of smoke detectors bag one floor at a time remove bags at end of work day
Date:  June 19, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd485129 | Parcel: 0304408000
2015/06/190951 High St Boston Ma
SCORE
100
Build out of 0 sqft tenant space. The 21st floor will be build out first once complete and moved in work will begin on the 22nd floor work includes demo drywall partition ceiling flooring hvac electrcail sprinkler plumbing and finish work
Date:  August 15, 2011
Value:   $5,430,000
Contractor: Francesca Dirico

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: February 15, 2012 | Current use: Comm | Permit id: Alt89954 | Parcel: 0304408000
2011/08/1554300001001 High St Boston MaFrancesca Dirico
SCORE
100
Tenant renovations to 4th floor space; ~; doc# 20121085
Date:  October 2, 2012
Contractor: Michael Mcdonald

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf184674 | Parcel: 0304408000
2012/10/0201001 High St Boston MaMichael Mcdonald
Relocate (60) existing sprinklers in 20th floor
Date:  September 28, 2010

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk44443 | Parcel: 0304408000
2010/09/280951 High St Boston Ma
SCORE
100
21frist floor
Date:  September 1, 2011
Value:   $470,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 1, 2012 | Current use: Comm | Permit id: E93467 | Parcel: 0304408000
2011/09/014700001001 High St Boston MaKaren Sykes
Welding for installation of new steel beams and posts for re-inforcement to existing framing
Date:  September 16, 2011

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw95155 | Parcel: 0304408000
2011/09/160951 High St Boston Ma
Only one floor shall be impaired at any given time. Installation shall be inaccordance with 7 cmr and nfpa 13.
Date:  August 13, 2014

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk376091 | Parcel: 0304408000
2014/08/130951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during renovation work
Date:  June 4, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd369468 | Parcel: 0304408000
2014/06/040951 High St Boston Ma
SCORE
100
Minor renovation to existing office space on 5th floor (transperfect)
Date:  July 3, 2014
Value:   $2,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: January 3, 2015 | Current use: Comm | Permit id: Efa380144 | Parcel: 0304408000
2014/07/0320001001 High St Boston MaJeffrey Catalano
Temporary bagging of smoke detectors for dust control during renovation work
Date:  February 19, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd326868 | Parcel: 0304408000
2014/02/190951 High St Boston Ma
Interior remodel for new office fit-up to include floors gwb partitions &;ceiling (secure any floor openings)
Date:  May 31, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc145413 | Parcel: 0304408000
2012/05/310951 High St Boston Ma
SCORE
100
Build out of spec suite on the 20th floor work to include new finishes new lighting mep upgrades.
Date:  September 14, 2010
Value:   $800,000

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: March 14, 2011 | Current use: Comm | Permit id: Alt41468 | Parcel: 0304408000
2010/09/148000001001 High St Boston MaGarland Building Company
4th floor parsons boston
Date:  August 20, 2012

Client: Equity Office | Permit type: Bfd chemist certificate proces | Permit id: Chm174793 | Parcel: 0304408000
2012/08/200951 High St Boston Ma
SCORE
100
Make safe demo office area. Install temporary string lights.
Date:  September 9, 2014
Value:   $6,500
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 9, 2015 | Current use: Comm | Permit id: E405151 | Parcel: 0304408000
2014/09/0965001001 High St Boston MaMarc Frisoli
Renovation to existing office space on 1st floor; ~; doc# 20131059
Date:  October 11, 2013

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf284591 | Parcel: 0304408000
2013/10/110951 High St Boston Ma
SCORE
100
Install new fire alarm devices on the 19th floor
Date:  June 24, 2010
Value:   $6,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: December 24, 2010 | Current use: Comm | Permit id: Efa31185 | Parcel: 0304408000
2010/06/2460001001 High St Boston MaMarc Frisoli
SCORE
100
26th floor 1 high st bank of montreal
Date:  March 29, 2012
Value:   $49,000
Contractor: Joseph Mccluskey

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: September 29, 2012 | Current use: Comm | Permit id: Elv127888 | Parcel: 0304408000
2012/03/29490001001 High St Boston MaJoseph Mccluskey
SCORE
100
Renovation to existing office space on 15th floor (pgi)
Date:  January 17, 2013
Value:   $2,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: July 17, 2013 | Current use: Comm | Permit id: Efa214388 | Parcel: 0304408000
2013/01/1720001001 High St Boston MaJeffrey Catalano
Bag smoke detectors
Date:  February 7, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd324377 | Parcel: 0304408000
2014/02/070951 High St Boston Ma
SCORE
100
Low voltage wiring 1 high street (fragomen)
Date:  January 29, 2015
Value:   $74,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 29, 2015 | Current use: Comm | Permit id: Elv442407 | Parcel: 0304408000
2015/01/29740001001 High St Boston MaJulie Colantoni
SCORE
100
Renovation to existing office space on 1st floor (amenity space)
Date:  September 3, 2013
Value:   $3,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: March 3, 2014 | Current use: Comm | Permit id: Efa281573 | Parcel: 0304408000
2013/09/0330001001 High St Boston MaJeffrey Catalano
Bfd chemist certificate proces
Date:  February 21, 2013

Client: Equity Office | Permit id: Chm219741 | Parcel: 0304408000
2013/02/210951 High St Boston Ma
The contractor shall verify that no other floor is impaired prior to scheduling impairement of the 28th floor
Date:  April 28, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk73738 | Parcel: 0304408000
2011/04/280951 High St Boston Ma
SCORE
99
White noise speaker system
Date:  December 12, 2011
Value:   $7,000
Contractor: Ronald Wallace

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: June 12, 2012 | Current use: Comm | Permit id: Elv109948 | Parcel: 0304408000
2011/12/127000991 High St Boston MaRonald Wallace
SCORE
99
Tenant fit-up of the 13th and 14th floors existing panelboards reused hvac remain some relocation
Date:  August 17, 2010
Value:   $250,000
Contractor: Angela Noenickx

Client: Equity Office | Permit type: Electrical permit | Expiration date: February 17, 2011 | Current use: Comm | Permit id: E38664 | Parcel: 0304408000
2010/08/17250000991 High St Boston MaAngela Noenickx
SCORE
100
Replace - worn out carpet clean exising carpets and paint space
Date:  January 21, 2011
Value:   $55,000
Contractor: Francesca Dirico

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: July 21, 2011 | Current use: Comm | Permit id: Sf61415 | Parcel: 0304408000
2011/01/21550001001 High St Boston MaFrancesca Dirico
Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13
Date:  July 30, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk495617 | Parcel: 0304408000
2015/07/300951 High St Boston Ma
Relocate upright heads into new ceiling layout. Work to be done one floor zone at a time floors 16 17 18 only work to be done per nfpa 13. ;
Date:  February 25, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk64382 | Parcel: 0304408000
2011/02/250951 High St Boston Ma
SCORE
100
Preparatory demo of space on the 19th floor for future renovations. Egress not affected.
Date:  March 16, 2010
Value:   $76,500

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: September 16, 2010 | Current use: Comm | Permit id: Sf17917 | Parcel: 0304408000
2010/03/16765001001 High St Boston MaGarland Building Company
Temporary bagging of smoke detectors for dust control during construction work
Date:  October 21, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd530935 | Parcel: 0304408000
2015/10/210951 High St Boston Ma
SCORE
93
Interior demolition only of non load-bearing partitions carpet and bathroom fixtures on the 27th floor.
Date:  October 21, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc530844 | Parcel: 0304408000
2015/10/210931 High St Boston MaMatt Santapaula
SCORE
100
15-146 amenities 1 high street
Date:  April 28, 2015
Value:   $7,500
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: October 28, 2015 | Current use: Comm | Permit id: Efa466501 | Parcel: 0304408000
2015/04/2875001001 High St Boston MaJohn Omahony
SCORE
100
15-146 amenities 1 high street
Date:  April 28, 2015
Value:   $55,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: October 28, 2015 | Current use: Comm | Permit id: E466500 | Parcel: 0304408000
2015/04/28550001001 High St Boston MaJohn Omahony
SCORE
96
Minor demo 4 temp lights
Date:  October 28, 2015
Value:   $3,000

Client: Equity Office | Permit type: Electrical permit | Expiration date: April 28, 2016 | Current use: Comm | Permit id: E533456 | Parcel: 0304408000
2015/10/283000961 High St Boston MaMgm Electric Co. Inc
SCORE
93
Demo covered under fdc530844. New office build out on the 27th floor to include new architectural finishes (partitions ceilings flooring millwork paint etc.)
Date:  October 29, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc532777 | Parcel: 0304408000
2015/10/290931 High St Boston MaMatt Santapaula
SCORE
93
Brown advisory -; demo portion covered under sf530825. New office build out to include new architectural and mep finishes. This includes new non-load bearing partitions flooring ceiling millwork paint electrical plumbing hvac fire protection fire alarm etc.
Date:  November 4, 2015
Value:   $1,271,337
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: May 4, 2016 | Current use: Comm | Permit id: Alt532769 | Parcel: 0304408000
2015/11/041271337931 High St Boston MaMatt Santapaula
Temporary bagging of smoke detectors
Date:  November 5, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd535545 | Parcel: 0304408000
2015/11/050951 High St Boston Ma
SCORE
93
New office build out on the 7th floor to include: demolition of existing finishes and new architectural finishes (i. E. Millwork non load-bearing partitions ceilings flooring paint etc.).
Date:  November 5, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc535500 | Parcel: 0304408000
2015/11/050931 High St Boston MaMatt Santapaula
SCORE
100
To install 1 shower 2 sinks 2 hw and 2 floor drains @ 1 high st 27th floor
Date:  November 9, 2015
Value:   $32,500
Contractor: Douglas Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: May 9, 2016 | Current use: Comm | Permit id: Pl536601 | Parcel: 0304408000
2015/11/09325001001 High St Boston MaDouglas Howard
SCORE
100
Low voltage wiring at fragoman
Date:  November 13, 2015
Value:   $4,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: May 13, 2016 | Current use: Comm | Permit id: Elv532366 | Parcel: 0304408000
2015/11/1340001001 High St Boston MaJulie Colantoni
SCORE
93
New office build out on the 7th floor to include: demolition of existing finishes new architectural finishes (i. E. Millwork non load-bearing partitions ceilings flooring paint etc.) and mep systems (i. E. Sprinklers plumbing hvac electrical fire alarm etc.).
Date:  November 13, 2015
Value:   $2,073,213
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: May 13, 2016 | Current use: Comm | Permit id: Alt535499 | Parcel: 0304408000
2015/11/132073213931 High St Boston MaMatt Santapaula
SCORE
100
27th floor
Date:  November 16, 2015
Value:   $13,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: May 16, 2016 | Current use: Comm | Permit id: Efa539328 | Parcel: 0304408000
2015/11/16130001001 High St Boston MaKaren Sykes
SCORE
100
Renovation to 7th floor
Date:  November 17, 2015
Value:   $65,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: May 17, 2016 | Current use: Comm | Permit id: Efa539786 | Parcel: 0304408000
2015/11/17650001001 High St Boston MaJeffrey Catalano
SCORE
100
Renovation to 7th floor
Date:  November 17, 2015
Value:   $300,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: May 17, 2016 | Current use: Comm | Permit id: E539785 | Parcel: 0304408000
2015/11/173000001001 High St Boston MaJeffrey Catalano
SCORE
96
Remodel of 11 0 square feet
Date:  November 18, 2015
Value:   $181,000

Client: Equity Office | Permit type: Electrical permit | Expiration date: May 18, 2016 | Current use: Comm | Permit id: E540239 | Parcel: 0304408000
2015/11/18181000961 High St Boston MaMgm Electric Co. Inc
SCORE
100
Install sink and elec hot water heater to office space
Date:  May 19, 2015
Value:   $3,000
Contractor: Stephen Mcelhinney

Client: Equity Office | Permit type: Plumbing permit | Expiration date: November 19, 2015 | Current use: Comm | Permit id: Pl474579 | Parcel: 0304408000
2015/05/1930001001 High St Boston MaStephen Mcelhinney
Bfd chemist certificate proces
Date:  November 19, 2015

Client: Equity Office | Permit id: Chm537615 | Parcel: 0304408000
2015/11/190951 High St Boston Ma
SCORE
100
Low voltage permit for placester at 1 high st
Date:  November 20, 2015
Value:   $60,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: May 20, 2016 | Current use: Comm | Permit id: Elv540449 | Parcel: 0304408000
2015/11/20600001001 High St Boston MaJulie Colantoni
SCORE
100
Corderman & company telephone and data wiring for brown advisory 27th floor at 1 high street boston ma
Date:  November 23, 2015
Value:   $2,000
Contractor: Kevin Flaherty

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: May 23, 2016 | Current use: Comm | Permit id: Elv541893 | Parcel: 0304408000
2015/11/2320001001 High St Boston MaKevin Flaherty
SCORE
100
New sink & heater new lavs
Date:  November 23, 2015
Value:   $30,000
Contractor: Kevin Almeida

Client: Equity Office | Permit type: Plumbing permit | Expiration date: May 23, 2016 | Current use: Comm | Permit id: Pl541491 | Parcel: 0304408000
2015/11/23300001001 High St Boston MaKevin Almeida
Temporary bagging of smoke detectors for dust control during construction
Date:  April 25, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd134034 | Parcel: 0304408000
2012/04/250951 High St Boston Ma
SCORE
100
Install 2 kitchen sinks and 1 water heater on 4th floor
Date:  August 8, 2012
Value:   $7,700
Contractor: Paul Dionne

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 8, 2013 | Current use: Comm | Permit id: Pl168460 | Parcel: 0304408000
2012/08/0877001001 High St Boston MaPaul Dionne
SCORE
93
Amendment to alt458549: construct a new deck on the roof of the 9th floor at 1 high street. The work consists of installing new steel structural beams and roof penetrations underneath a finished wood decking. On top of the deck there will be a wood pergola steel screens and glass perimeter guardrails. As per plans;cost reflected on alt458549.
Date:  June 4, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Amendment to a long form | Expiration date: December 4, 2015 | Current use: Comm | Permit id: A475174 | Parcel: 0304408000
2015/06/040931 High St Boston MaMatt Santapaula
SCORE
100
New bathrooms and pantry sinks
Date:  June 5, 2015
Value:   $60,000
Contractor: Kevin Almeida

Client: Equity Office | Permit type: Plumbing permit | Expiration date: December 5, 2015 | Current use: Comm | Permit id: Pl471656 | Parcel: 0304408000
2015/06/05600001001 High St Boston MaKevin Almeida
Bfd chemist certificate proces
Date:  December 8, 2015

Client: Equity Office | Permit id: Chm544436 | Parcel: 0304408000
2015/12/080951 High St Boston Ma
SCORE
86
Filtered water cooler
Date:  June 10, 2015
Value:   $50

Client: Equity Office | Permit type: Plumbing permit | Expiration date: December 10, 2015 | Current use: Comm | Permit id: Pl477384 | Parcel: 0304408000
2015/06/1050861 High St Boston MaNorman R St. Hilaire Jr
Relocation of 201 sprinklers. Work to be done per nfpa stands 7 one floor zone at a time.
Date:  December 11, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk541675 | Parcel: 0304408000
2015/12/110951 High St Boston Ma
SCORE
100
Renovation to the 12th floor
Date:  December 14, 2015
Value:   $12,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: June 14, 2016 | Current use: Comm | Permit id: Efa547259 | Parcel: 0304408000
2015/12/14120001001 High St Boston MaJeffrey Catalano
SCORE
100
Renovation to the 12th floor
Date:  December 14, 2015
Value:   $65,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: June 14, 2016 | Current use: Comm | Permit id: E547258 | Parcel: 0304408000
2015/12/14650001001 High St Boston MaJeffrey Catalano
Cutting &; welding;of (3) cooling towers (dpl) bfd paid detail required
Date:  December 14, 2015

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw543578 | Parcel: 0304408000
2015/12/140951 High St Boston Ma
SCORE
93
Marketing suite build out to include: selective demolition only and new architectural finishes (i. E. Millwork flooring ceiling paint etc.).
Date:  December 14, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc546877 | Parcel: 0304408000
2015/12/140931 High St Boston MaMatt Santapaula
Cutting only of (3) cooling towers (dpl 3-1-2016) bfd paid detail required
Date:  November 5, 2015

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw533720 | Parcel: 0304408000
2015/11/050951 High St Boston Ma
Bagging of smoke detectors
Date:  December 16, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd547483 | Parcel: 0304408000
2015/12/160951 High St Boston Ma
SCORE
86
5th floor - removal of non structural office partitions. Mep make safes.
Date:  February 3, 2015
Value:   $9,980
Contractor: Richard Pugsley

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: August 3, 2015 | Current use: Comm | Permit id: Sf445204 | Parcel: 0304408000
2015/02/039980861 High St Boston MaRichard Pugsley
SCORE
99
Temp generator power for film production. 6-21-13 sunday
Date:  June 25, 2015
Value:   $500
Contractor: Edward Marcotti

Client: Equity Office | Permit type: Electrical temporary service | Expiration date: December 25, 2015 | Current use: Vacld | Permit id: Ets487935 | Parcel: 0304408000
2015/06/25500991 High St Boston MaEdward Marcotti
SCORE
93
Zuora - 12th floor: architectural &; mep upgrades of office space. Work to include new drywall partitions paint carpet ceilings mep upgrades and fp.
Date:  June 25, 2015
Value:   $400,000
Contractor: David Corderman Jr

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: December 25, 2015 | Current use: Comm | Permit id: Alt484858 | Parcel: 0304408000
2015/06/25400000931 High St Boston MaDavid Corderman Jr
Relocate 37 sprinkler heads.; work to be done one floor zone at a time per nfpa stands. 780cmr.
Date:  December 30, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk547409 | Parcel: 0304408000
2015/12/300951 High St Boston Ma
SCORE
100
Renovation to existing office space on the 18th floor (tro-jb)
Date:  December 30, 2015
Value:   $45,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: June 30, 2016 | Current use: Comm | Permit id: E551182 | Parcel: 0304408000
2015/12/30450001001 High St Boston MaJeffrey Catalano
Bfd chemist certificate proces
Date:  January 4, 2016

Client: Equity Office | Permit id: Chm550004 | Parcel: 0304408000
2016/01/040951 High St Boston Ma
SCORE
93
Vsp marketing suite -;12th floor -; office build-out work;to include: selective demolition new architectural finishes (i. E. Millwork flooring ceiling paint etc.) and mep systems (i. E. Fire alarm sprinkler;fire protection hvac electrical etc.).
Date:  January 5, 2016
Value:   $308,781
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: July 5, 2016 | Current use: Comm | Permit id: Alt547319 | Parcel: 0304408000
2016/01/05308781931 High St Boston MaMatt Santapaula
SCORE
93
Construction for tro jung brannens office space on the 18th floor. Work to include demolition of drywall partitions. Construction of new drywall carpet paint ceilings &; mep upgrades.
Date:  January 7, 2016
Value:   $350,000
Contractor: David Corderman Jr

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: July 7, 2016 | Current use: Comm | Permit id: Sf552796 | Parcel: 0304408000
2016/01/07350000931 High St Boston MaDavid Corderman Jr
Bfd chemist certificate proces
Date:  January 7, 2016

Client: Equity Office | Permit id: Chm550807 | Parcel: 0304408000
2016/01/070951 High St Boston Ma
SCORE
82
Install new fire alarm devices in tenant space 27th floor in-accordance with the requirements of 7 cmr and nfpa 72
Date:  January 8, 2016

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf540275 | Parcel: 0304408000
2016/01/080821 High St Boston MaErica Burgos J And M Brown Company
SCORE
98
Installation of kitchen equipment ventless hood table top warmers griddle fryer coffee machine.
Date:  July 9, 2015
Value:   $2,000
Contractor: Michael Conway

Permit type: Electrical permit | Expiration date: January 9, 2016 | Current use: Comm | Permit id: E489112 | Parcel: 0304045000
2015/07/092000981 High St Boston MaMichael Conway
Install soundmasking speakers
Date:  January 8, 2016
Value:   $7,500

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 8, 2016 | Current use: Comm | Permit id: Elv552740 | Parcel: 0304408000
2016/01/087500951 High St Boston Ma
SCORE
93
Demolition of existing offices. Construction of new offices & open area to include new carpet paint ceilings & hvac & lighting upgrades.
Date:  January 11, 2016
Contractor: David Corderman Jr

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc552728 | Parcel: 0304408000
2016/01/110931 High St Boston MaDavid Corderman Jr
Construction of new offices to include walls floors ceilings new carpet and paint
Date:  January 11, 2016

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc552946 | Parcel: 0304408000
2016/01/110951 High St Boston Ma
Temporary bagging of smoke detectors for dust control durng renovation work
Date:  January 11, 2016

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd552940 | Parcel: 0304408000
2016/01/110951 High St Boston Ma
Temporary bagging of smoke detectors due to construction debris
Date:  January 11, 2016

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd553003 | Parcel: 0304408000
2016/01/110951 High St Boston Ma
SCORE
100
Install new speaker strobes in existing tenant space
Date:  January 14, 2016
Value:   $5,000
Contractor: David Lynch

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: July 14, 2016 | Current use: Comm | Permit id: Efa554447 | Parcel: 0304408000
2016/01/1450001001 High St Boston MaDavid Lynch
SCORE
100
Minor renovation of existing tenant space on 11th floor
Date:  January 14, 2016
Value:   $30,000
Contractor: David Lynch

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 14, 2016 | Current use: Comm | Permit id: E554446 | Parcel: 0304408000
2016/01/14300001001 High St Boston MaDavid Lynch
SCORE
71
New carpet paint renovating existing office;with new workstations
Date:  January 14, 2016
Value:   $155,000
Contractor: Brian Keenan

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: July 14, 2016 | Current use: Comm | Permit id: Alt551046 | Parcel: 0304408000
2016/01/14155000711 High St Boston MaBrian Keenan
SCORE
100
Renovation to 7th floor
Date:  January 15, 2016
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf544683 | Parcel: 0304408000
2016/01/1501001 High St Boston MaJeffrey Catalano
SCORE
86
3rd floor roof deck roof terrance build out on existing structure.
Date:  July 17, 2015
Value:   $120,927
Contractor: Richard Pugsley

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: January 17, 2016 | Current use: Comm | Permit id: Alt462215 | Parcel: 0304408000
2015/07/17120927861 High St Boston MaRichard Pugsley
SCORE
100
To install 1 sink and 1 wh on the 12th floor of 1 high st
Date:  July 20, 2015
Value:   $10,000
Contractor: Douglas Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: January 20, 2016 | Current use: Comm | Permit id: Pl494760 | Parcel: 0304408000
2015/07/20100001001 High St Boston MaDouglas Howard
SCORE
100
Inergen and preaction fire protection system wiring.
Date:  June 30, 2010
Value:   $7,500
Contractor: Shawn Stalker

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: December 30, 2010 | Current use: Comm | Permit id: Efa31608 | Parcel: 0304408000
2010/06/3075001001 High St Boston MaShawn Stalker
SCORE
95
Job 11993 - zuora - 1 high street 12th floor - relocate security card reader
Date:  January 20, 2016
Value:   $400
Contractor: Brian Murphy

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 20, 2016 | Current use: Comm | Permit id: Elv554766 | Parcel: 0304408000
2016/01/20400951 High St Boston MaBrian Murphy
Brown advisory 27th fl. 1 high st. Small 2 door 2 camera security system
Date:  January 21, 2016
Value:   $8,000

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 21, 2016 | Current use: Comm | Permit id: Elv556436 | Parcel: 0304408000
2016/01/218000951 High St Boston Ma
SCORE
100
Interior demolition of ten office walls carpet and removing bathroom fixtures on 27th floor.
Date:  October 20, 2015
Value:   $28,600
Contractor: Linda Liporto

Client: Equity Office | Permit type: Short form bldg permit | Current use: Comm | Permit id: Sf530825 | Parcel: 0304408000
2015/10/20286001001 High St Boston MaLinda Liporto
SCORE
100
Buildout of freshi restaurant at suite 100
Date:  June 15, 2011
Value:   $37,852
Contractor: Gina Mishel

Client: Equity Office | Permit type: Electrical permit | Expiration date: December 15, 2011 | Current use: Comm | Permit id: E80823 | Parcel: 0304408000
2011/06/15378521001 High St Boston MaGina Mishel
SCORE
97
Remodel of existing suite
Date:  July 24, 2015
Value:   $67,000
Contractor: Robert Mckenna

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 24, 2016 | Current use: Comm | Permit id: E496149 | Parcel: 0304408000
2015/07/2467000971 High St Boston MaRobert Mckenna
SCORE
100
Install wiring within office cubicles on 7th floor for placester
Date:  January 25, 2016
Value:   $4,750
Contractor: Thomas Newton

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 25, 2016 | Current use: Comm | Permit id: E557459 | Parcel: 0304408000
2016/01/2547501001 High St Boston MaThomas Newton
SCORE
100
S16-2 office workstation wiring 27th floor @ 1 high st boston.
Date:  January 25, 2016
Value:   $500
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 25, 2016 | Current use: Comm | Permit id: E555510 | Parcel: 0304408000
2016/01/255001001 High St Boston MaJohn Omahony
SCORE
96
Bfd chemist certificate proces
Date:  January 26, 2016

Client: Equity Office | Permit id: Chm556462 | Parcel: 0304408000
2016/01/260961 High St Boston MaCompany Inc. Corderman
SCORE
100
12th floor
Date:  July 27, 2015
Value:   $10,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: January 27, 2016 | Current use: Comm | Permit id: Efa498498 | Parcel: 0304408000
2015/07/27100001001 High St Boston MaKaren Sykes
SCORE
100
New telephone and data wiring for zuora 1 high street boston ma
Date:  July 27, 2015
Value:   $2,500
Contractor: Kevin Flaherty

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: January 27, 2016 | Current use: Comm | Permit id: Elv499099 | Parcel: 0304408000
2015/07/2725001001 High St Boston MaKevin Flaherty
Temporary bagging of smoke detectors for dust control during sanding work
Date:  January 28, 2016

Permit type: Bfd bag smoke detectors | Permit id: Bsd557861 | Parcel: 0304045000
2016/01/280951 High St Boston Ma
SCORE
100
Installation of plumbing for a kitchen sink
Date:  February 1, 2016
Value:   $5,500
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: August 1, 2016 | Current use: Comm | Permit id: Pl555238 | Parcel: 0304408000
2016/02/0155001001 High St Boston MaKevin Maceachern
SCORE
100
Renovation to the 12th floor.; smoke detectors required at entrance to stairwells and in elevator lobbies if any exist directly adjacent to tenant space - none shown on plan.;
Date:  February 2, 2016
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf550081 | Parcel: 0304408000
2016/02/0201001 High St Boston MaJeffrey Catalano
SCORE
100
Demolition of exiting lights and receptacles in the tenant space on the 10th floor. Installation of 32 pendant light fixtures 14 recessed light fixtures 4 exit signs and 12 duplex receptacles throughout space based on contract drawings. Installation of new 1 amp service to supply power to tenant space.
Date:  February 26, 2015
Value:   $48,000

Client: Equity Office | Permit type: Electrical permit | Expiration date: August 26, 2015 | Current use: Comm | Permit id: E449441 | Parcel: 0304408000
2015/02/26480001001 High St Boston MaMurphy Electrical And Industrial Control
SCORE
100
Trojb 1 high street - misc low voltage hvac control wiring ap-163114
Date:  February 2, 2016
Value:   $4,900
Contractor: Paul Guarracino

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: August 2, 2016 | Current use: Comm | Permit id: Elv559702 | Parcel: 0304408000
2016/02/0249001001 High St Boston MaPaul Guarracino
SCORE
100
Vsp suite 1 high street - misc low voltage hvac control wiring - ap-163113
Date:  February 2, 2016
Value:   $6,950
Contractor: Paul Guarracino

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: August 2, 2016 | Current use: Comm | Permit id: Elv559699 | Parcel: 0304408000
2016/02/0269501001 High St Boston MaPaul Guarracino
Relocated existing 31 sprinkler lead to new location on the 15th fl. Work to be done per nfpa stands. 7 cmr.
Date:  August 1, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk164828 | Parcel: 0304408000
2012/08/010951 High St Boston Ma
Bfd chemist certificate proces
Date:  June 26, 2012

Client: Equity Office | Permit id: Chm157440 | Parcel: 0304408000
2012/06/260951 High St Boston Ma
Street occupancy permit
Date:  September 19, 2013

Client: Equity Office | Expiration date: September 24, 2013 | Permit id: Occu-287360 | Parcel: 0304408000
2013/09/190951 High St Boston Ma
SCORE
100
Renovation to existing office space on 10th floor (marcus & millichap)
Date:  June 4, 2013
Value:   $3,500
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: December 4, 2013 | Current use: Comm | Permit id: Efa248774 | Parcel: 0304408000
2013/06/0435001001 High St Boston MaJeffrey Catalano
SCORE
100
New power lighting and branch circuit wiring.
Date:  August 19, 2014
Value:   $23,000
Contractor: Ryan Toland Apl

Client: Equity Office | Permit type: Electrical permit | Expiration date: February 19, 2015 | Current use: Comm | Permit id: E397448 | Parcel: 0304408000
2014/08/19230001001 High St Boston MaRyan Toland Apl
Only one floor shall be impaired at any given time.... Installation shall comply with 7 cmr and nfpa 13
Date:  January 22, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk438068 | Parcel: 0304408000
2015/01/220951 High St Boston Ma
Demolition / renovations to existing office space to include drywall paint ceiling and flooring (secure any floor openings)
Date:  September 12, 2011

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc95009 | Parcel: 0304408000
2011/09/120951 High St Boston Ma
Relocate (41) sprinklers in coordination with new ceiling work on 4th floor. Work to be done per nfpa stands. 7 cmr. One floor zone at a time.
Date:  August 13, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk169493 | Parcel: 0304408000
2012/08/130951 High St Boston Ma
SCORE
82
Minor selective demoilition and interior fit out for an existing office space. Work includes new offices and conference rooms. Work includes mep upgrades new drywall partitions new flooring acoustical ceilings and painting.
Date:  June 13, 2012
Value:   $575,000
Contractor: Donald Cook

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: December 13, 2012 | Current use: Mixed | Permit id: Alt146012 | Parcel: 0304408000
2012/06/13575000821 High St Boston MaDonald Cook
Stand truck at curb for firepipe testing/ occupy sidewalk w/hose
Date:  August 9, 2013

Permit type: Street occupancy permit | Expiration date: August 13, 2013 | Permit id: Occu-272878 | Parcel: 0304045000
2013/08/090951 High St Boston Ma
Demolition / renovation to existing office space to include drywall flooring and ceilings
Date:  July 23, 2010

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc34252 | Parcel: 0304408000
2010/07/230951 High St Boston Ma
SCORE
100
Install of plumbing for two kitchen sinks
Date:  February 10, 2011
Value:   $16,000
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: August 10, 2011 | Current use: Comm | Permit id: Pl63532 | Parcel: 0304408000
2011/02/10160001001 High St Boston MaKevin Maceachern
SCORE
93
Re-carpet and paint entire office some minor drywall repair
Date:  June 3, 2014
Value:   $82,100
Contractor: Mark Price

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: December 3, 2014 | Current use: Comm | Permit id: Sf369096 | Parcel: 0304408000
2014/06/0382100931 High St Boston MaMark Price
Relocate line in conflict with new equipment. Work to be done per nfpa stands. 7 cmr one floor zone at a time
Date:  May 19, 2014

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk360455 | Parcel: 0304408000
2014/05/190951 High St Boston Ma
Relocate existing sprinkler heads to new ceiling grid. Work to be done per nfpa stands 7 cmr. One floor zone at a time.
Date:  March 29, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk123714 | Parcel: 0304408000
2012/03/290951 High St Boston Ma
SCORE
100
Common restroom sink replacement
Date:  November 30, 2010
Value:   $8,000
Contractor: Douglas Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: May 30, 2011 | Current use: Comm | Permit id: Pl53585 | Parcel: 0304408000
2010/11/3080001001 High St Boston MaDouglas Howard
SCORE
100
Install new lighting and fire alarm in 9th floor common corridor.
Date:  October 14, 2014
Value:   $28,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: April 14, 2015 | Current use: Comm | Permit id: E415763 | Parcel: 0304408000
2014/10/14280001001 High St Boston MaMarc Frisoli
SCORE
100
Install fire devices
Date:  April 26, 2011
Value:   $6,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: October 26, 2011 | Current use: Comm | Permit id: Efa72725 | Parcel: 0304408000
2011/04/2660001001 High St Boston MaJohn Omahony
Coordinate impairment with building management so that no other zone is impaired during this scheduled work.
Date:  February 14, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk440982 | Parcel: 0304408000
2015/02/140951 High St Boston Ma
SCORE
80
Build out of space for tenant bank of montreal (bmo) on the 26th floor to include new drywall partitions new finishes mechanical upgrades sprinkler relocates fire alarm work.
Date:  March 5, 2012
Value:   $725,000
Contractor: Jonathan D Lake

Client: Equity Office | Permit type: Long form/alteration permit | Current use: Comm | Permit id: Alt120968 | Parcel: 0304408000
2012/03/05725000801 High St Boston MaJonathan D Lake
Renovation to existing office space on 15th floor; ~; doc# 20120804
Date:  July 30, 2012

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf160205 | Parcel: 0304408000
2012/07/300951 High St Boston Ma
SCORE
94
Installation of (1) smoke detector for new it closet
Date:  March 14, 2012
Value:   $2,500
Contractor: Michael Weber

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: September 14, 2012 | Current use: Comm | Permit id: Efa124744 | Parcel: 0304408000
2012/03/142500941 High St Boston MaMichael Weber
SCORE
95
Job number 10158 - bank of montreal 1 high street 26th floor - renovation of office space
Date:  April 4, 2012
Value:   $6,000
Contractor: Brian Murphy

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: October 4, 2012 | Current use: Comm | Permit id: Efa128321 | Parcel: 0304408000
2012/04/046000951 High St Boston MaBrian Murphy
SCORE
100
Installation of one water closet one lavatory and one kitchen sink
Date:  October 16, 2013
Value:   $8,500
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: April 16, 2014 | Current use: Comm | Permit id: Pl294305 | Parcel: 0304408000
2013/10/1685001001 High St Boston MaKevin Maceachern
Bagging of smoke detectors (maintain log &; security)
Date:  July 26, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd161803 | Parcel: 0304408000
2012/07/260951 High St Boston Ma
SCORE
100
20th floor
Date:  July 20, 2012
Value:   $3,400
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: January 20, 2013 | Current use: Comm | Permit id: Elv163620 | Parcel: 0304408000
2012/07/2034001001 High St Boston MaKaren Sykes
SCORE
100
Plumbing for kitchen sink waste water and vent
Date:  January 30, 2013
Value:   $4,500
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: July 30, 2013 | Current use: Comm | Permit id: Pl217359 | Parcel: 0304408000
2013/01/3045001001 High St Boston MaKevin Maceachern
SCORE
100
Low voltage for equity office 1st fl 1 high
Date:  October 2, 2013
Value:   $4,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: April 2, 2014 | Current use: Comm | Permit id: Elv290374 | Parcel: 0304408000
2013/10/0240001001 High St Boston MaJulie Colantoni
Temporary bagging of smoke detectors for dust control during renovation work for dust control
Date:  July 26, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd165467 | Parcel: 0304408000
2012/07/260951 High St Boston Ma
SCORE
100
Remove existing speaker strobes from walls and re-support existing contents of space are being demod
Date:  July 11, 2014
Value:   $6,000
Contractor: David Lynch

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: January 11, 2015 | Current use: Comm | Permit id: Efa382869 | Parcel: 0304408000
2014/07/1160001001 High St Boston MaDavid Lynch
Temporary bagging of smoke detectors for dust control during construction
Date:  September 14, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd95075 | Parcel: 0304408000
2011/09/140951 High St Boston Ma
Bagging of;smoke detectors
Date:  April 2, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd128093 | Parcel: 0304408000
2012/04/020951 High St Boston Ma
SCORE
82
Installation shall be inaccordance with the requirements of 7 cmr and nfpa 13... Only one zone shall be impaired at any given time
Date:  March 10, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk450274 | Parcel: 0304408000
2015/03/100821 High St Boston MaBoston Fire Sprinkler Co. Inc
SCORE
100
Build out of space for tenant on the 19th floor. All work per attached plans. Prep demo permit already issued. Sf 17917 @; 1 high same bldg
Date:  April 9, 2010
Value:   $845,000

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: October 9, 2010 | Current use: Comm | Permit id: Alt20043 | Parcel: 0304408000
2010/04/098450001001 High St Boston MaGarland Building Company
Relocate (407) sprinkler heads to new ceiling grid on 20th 21st &; 22nd floors. Work to be done per nfpa stands one floor zone at a time.
Date:  September 16, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk94153 | Parcel: 0304408000
2011/09/160951 High St Boston Ma
Demolition
Date:  August 17, 2011

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc90722 | Parcel: 0304408000
2011/08/170951 High St Boston Ma
SCORE
100
Install supplemental heat in building lobby ductwork on the first floor.
Date:  February 2, 2010
Value:   $75,000
Contractor: Jack Moriarty

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: August 2, 2010 | Current use: Comm | Permit id: Sf13322 | Parcel: 0304408000
2010/02/02750001001 High St Boston MaJack Moriarty
Tenant fit-up to include new walls ceilings flooring and;millwork
Date:  August 13, 2010

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc37611 | Parcel: 0304408000
2010/08/130951 High St Boston Ma
SCORE
96
Temporary bagging of smoke detectors
Date:  February 19, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd448012 | Parcel: 0304408000
2015/02/190961 High St Boston MaCompany Inc. Corderman
SCORE
100
Install fire alarm devices on 24th & 25 th floors off existing simplex system.
Date:  May 24, 2011
Value:   $50,000
Contractor: Dennis Mahoney

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: November 24, 2011 | Current use: Comm | Permit id: Efa78308 | Parcel: 0304408000
2011/05/24500001001 High St Boston MaDennis Mahoney
SCORE
61
Floors 4 &; 5.; minor interior renovation to existing commercial space to include demo and infill;of stairs new drywall flooring ceiling and finishes.
Date:  February 4, 2014
Value:   $65,000
Contractor: Daniel M Guimond

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: August 4, 2014 | Current use: Comm | Permit id: Alt317597 | Parcel: 0304408000
2014/02/0465000611 High St Boston MaDaniel M Guimond
Work to include selective interior demolition; new drywall partitions new carpet &; paint new flooring as well as minor electrical and hvac work.
Date:  August 8, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd391426 | Parcel: 0304408000
2014/08/080951 High St Boston Ma
SCORE
100
Renovation to existing office space on 15th floor (pgi)
Date:  January 17, 2013
Value:   $15,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 17, 2013 | Current use: Comm | Permit id: E214386 | Parcel: 0304408000
2013/01/17150001001 High St Boston MaJeffrey Catalano
Installation shall be inaccordance with 7 cmr and nfpa 13...... Only one floor shall be impaired at any given time
Date:  July 25, 2014

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk383455 | Parcel: 0304408000
2014/07/250951 High St Boston Ma
SCORE
100
This permit is for the installation of wiring for the card access and camera system. Floors 16 and 18
Date:  January 26, 2011
Value:   $3,000
Contractor: Richard Longmire

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 26, 2011 | Current use: Comm | Permit id: Elv61845 | Parcel: 0304408000
2011/01/2630001001 High St Boston MaRichard Longmire
SCORE
100
Renovation to existing office space on 1st floor (amenity space)
Date:  September 3, 2013
Value:   $30,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 3, 2014 | Current use: Comm | Permit id: E281570 | Parcel: 0304408000
2013/09/03300001001 High St Boston MaJeffrey Catalano
SCORE
96
Demo and make safe tenant space on 4th floor
Date:  July 13, 2012
Value:   $2,500
Contractor: Michael Lawlor

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 13, 2013 | Current use: Comm | Permit id: E162141 | Parcel: 0304408000
2012/07/132500961 High St Boston MaMichael Lawlor
SCORE
100
Instalaltion of telephone and data cabling for collora 1 high street 20th floor.
Date:  July 10, 2012
Value:   $6,500
Contractor: Kevin Flaherty

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: January 10, 2013 | Current use: Comm | Permit id: Elv160613 | Parcel: 0304408000
2012/07/1065001001 High St Boston MaKevin Flaherty
SCORE
100
Minor interior renovations to existing commercial office space to include: demolition drywall electrical mechanical new carpet paint and carpentry as per plans
Date:  May 23, 2013
Value:   $600,000
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: November 23, 2013 | Current use: Comm | Permit id: Alt241097 | Parcel: 0304408000
2013/05/236000001001 High St Boston MaJonathan Lake
Burning/ welding for installation of a new roof deck and supporting structurl steel framing dpl8/15/15 bfd paid detail required
Date:  May 6, 2015

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw467941 | Parcel: 0304408000
2015/05/060951 High St Boston Ma
SCORE
100
Renovations to existing lobby space on the 5th floor to include minor demo drywall ceiling painting carpet electrical no sprinkler work fire alarm and egress are not affected.
Date:  October 21, 2010
Value:   $39,758

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: April 21, 2011 | Current use: Comm | Permit id: Sf47889 | Parcel: 0304408000
2010/10/21397581001 High St Boston MaGarland Building Company
Only one floor shall be impaired at any given time coordinate impairment with building management. Installation shall comply with the requirements of 7 cmr and nfpa 13
Date:  February 25, 2015

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk447512 | Parcel: 0304408000
2015/02/250951 High St Boston Ma
Installation of a new 11/2 inch pre-action system feeding (4) sprinkler heads in the computer room on the 22nd floor. Work to be done per 7 cmr. One floor zone at a time.
Date:  November 21, 2011

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk100428 | Parcel: 0304408000
2011/11/210951 High St Boston Ma
Relocating existing sprinkler heads &; adding sprinklers to accommodate the build-out of a new tenant space on the 26th floor - (86) sprinklers. Work to be done per nfpa stands. 7 cmr.
Date:  May 8, 2012

Client: Equity Office | Permit type: Bfd sprinkler system | Permit id: Sprk132965 | Parcel: 0304408000
2012/05/080951 High St Boston Ma
SCORE
100
Installation of plumbing for a kitchen sink
Date:  April 23, 2014
Value:   $7,500
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: October 23, 2014 | Current use: Comm | Permit id: Pl355463 | Parcel: 0304408000
2014/04/2375001001 High St Boston MaKevin Maceachern
SCORE
100
26th floor
Date:  April 18, 2012
Value:   $7,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: October 18, 2012 | Current use: Comm | Permit id: Elv130942 | Parcel: 0304408000
2012/04/1870001001 High St Boston MaKaren Sykes
Renovation of tenant on 10th floor.; installation of 4 strobe only devices and 2 horn strobe devices; ~; doc# 20150130
Date:  March 30, 2015

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf451559 | Parcel: 0304408000
2015/03/300951 High St Boston Ma
SCORE
100
Communication cabling on the 19th floor
Date:  May 17, 2010
Value:   $40,000
Contractor: Finley Mullally

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: November 17, 2010 | Current use: Comm | Permit id: Elv26241 | Parcel: 0304408000
2010/05/17400001001 High St Boston MaFinley Mullally
SCORE
80
Furnish and install 7 x 15 handicap ramp with handrail and materials to be fire resistant.;
Date:  June 21, 2010
Value:   $4,100
Contractor: Vincent P Ororke

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: December 21, 2010 | Current use: Comm | Permit id: Alt29710 | Parcel: 0304408000
2010/06/214100801 High St Boston MaVincent P Ororke
Stand eye vision truck at curb/ 7am-5pm
Date:  August 14, 2015

Client: Equity Office | Permit type: Street occupancy permit | Expiration date: August 25, 2015 | Permit id: Occu-506663 | Parcel: 0304408000
2015/08/140951 High St Boston Ma
SCORE
100
Ammenidies space wiring
Date:  September 3, 2015
Value:   $1,500
Contractor: Kevin Flaherty

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: March 3, 2016 | Current use: Comm | Permit id: Elv516203 | Parcel: 0304408000
2015/09/0315001001 High St Boston MaKevin Flaherty
SCORE
100
1 floor
Date:  March 9, 2015
Value:   $2,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: September 9, 2015 | Current use: Comm | Permit id: Elv451738 | Parcel: 0304408000
2015/03/0920001001 High St Boston MaKaren Sykes
SCORE
82
Installing new fire alarm devices in tenant space.
Date:  September 16, 2015

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf513407 | Parcel: 0304408000
2015/09/160821 High St Boston MaErica Burgos J And M Brown Company
SCORE
100
3rd floor
Date:  March 20, 2015
Value:   $5,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: September 20, 2015 | Current use: Comm | Permit id: Elv455652 | Parcel: 0304408000
2015/03/2050001001 High St Boston MaKaren Sykes
SCORE
100
Renew fabric as per existing
Date:  September 24, 2015
Value:   $1,200
Contractor: David Yennaco

Permit type: Short form bldg permit | Expiration date: March 24, 2016 | Current use: Mixed | Permit id: Sf522956 | Parcel: 0304045000
2015/09/2412001001 High St Boston MaDavid Yennaco
Bfd chemist certificate proces
Date:  January 29, 2014

Client: Equity Office | Permit id: Chm322977 | Parcel: 0304408000
2014/01/290951 High St Boston Ma
SCORE
100
Furnish and install mi cable for elevator feeder on 17th floor
Date:  January 29, 2010
Value:   $9,500
Contractor: John Mclaughlin

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 29, 2010 | Current use: Comm | Permit id: E12926 | Parcel: 0304408000
2010/01/2995001001 High St Boston MaJohn Mclaughlin
Bfd chemist certificate proces
Date:  July 3, 2012

Client: Equity Office | Permit id: Chm156423 | Parcel: 0304408000
2012/07/030951 High St Boston Ma
Work to include selective interior demolition; new drywall partitions new carpet &; paint new flooring as well as minor electrical and hvac work.
Date:  August 8, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc391433 | Parcel: 0304408000
2014/08/080951 High St Boston Ma
SCORE
82
Short form demo seveth floor for equity office
Date:  April 19, 2012
Value:   $100,000
Contractor: David A Pollack

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: October 19, 2012 | Current use: Comm | Permit id: Sf133568 | Parcel: 0304408000
2012/04/19100000821 High St Boston MaDavid A Pollack
Construction of new drywall partations carpet ceilings &; paint
Date:  June 19, 2015

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc485125 | Parcel: 0304408000
2015/06/190951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during construction
Date:  September 13, 2013

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd284222 | Parcel: 0304408000
2013/09/130951 High St Boston Ma
Welding of new steel supports for a folding partition wall bfd paid detail required
Date:  July 8, 2011

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw84949 | Parcel: 0304408000
2011/07/080951 High St Boston Ma
Bagging of smoke detectors
Date:  October 25, 2010

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd47459 | Parcel: 0304408000
2010/10/250951 High St Boston Ma
SCORE
100
Tenant fit-up fast casual restaurant freshii 1st floor interior partitions flooring ceilings mechanical electrical plumbing fire prevention and finsih work.
Date:  June 8, 2011
Value:   $250,000
Contractor: Mann Braga

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: December 8, 2011 | Current use: Comm | Permit id: Alt75592 | Parcel: 0304408000
2011/06/082500001001 High St Boston MaMann Braga
SCORE
93
Office renovation on the 10th floor to include new architectural finishes (ie. Drywall carpet paint ceiling etc.) and mep systems (ie. Electrical hvac plumbing etc.). The demo is under a seperate permit (sf447998).
Date:  February 26, 2015
Value:   $203,265
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: August 26, 2015 | Current use: Comm | Permit id: Alt449057 | Parcel: 0304408000
2015/02/26203265931 High St Boston MaMatt Santapaula
Renovation to exists office space on 15th floor.; new smoke detector to initiate apporpriate smoke control system functions.;
Date:  February 15, 2013

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf217196 | Parcel: 0304408000
2013/02/150951 High St Boston Ma
SCORE
93
Selective demolition of (3) interior offices with non-load bearing partitions. Temporary lights will be installed after. No new construction.
Date:  August 12, 2015
Value:   $18,498
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: February 12, 2016 | Current use: Comm | Permit id: Sf506138 | Parcel: 0304408000
2015/08/1218498931 High St Boston MaMatt Santapaula
Demo to include dryall ceilling installation of flooring ceiling electrical plumbing hvac and framing.
Date:  September 8, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc404549 | Parcel: 0304408000
2014/09/080951 High St Boston Ma
SCORE
100
Upgrades to the 8th floor fire alarm system in conjunction with the 8th floor buildout
Date:  September 27, 2011
Value:   $15,000
Contractor: Ryan Toland Apl

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: March 27, 2012 | Current use: Comm | Permit id: Efa97560 | Parcel: 0304408000
2011/09/27150001001 High St Boston MaRyan Toland Apl
SCORE
100
Temporary power for set of film production "black mass". We will tie into existing 200a service on 7th floor of building on july and will be in use for approximately 3 weeks during film shooting.
Date:  July 8, 2014
Value:   $500
Contractor: Robert Mccracken

Client: Equity Office | Permit type: Electrical temporary service | Expiration date: January 8, 2015 | Current use: Comm | Permit id: Ets373437 | Parcel: 0304408000
2014/07/085001001 High St Boston MaRobert Mccracken
On-going construction on 22nd floor
Date:  February 15, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd63380 | Parcel: 0304408000
2011/02/150951 High St Boston Ma
Bfd chemist certificate proces
Date:  September 11, 2013

Client: Equity Office | Permit id: Chm284951 | Parcel: 0304408000
2013/09/110951 High St Boston Ma
SCORE
100
#15-044 fragomen
Date:  January 23, 2015
Value:   $25,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: July 23, 2015 | Current use: Comm | Permit id: Efa440452 | Parcel: 0304408000
2015/01/23250001001 High St Boston MaJohn Omahony
SCORE
100
5th floor demo temp power and lighting new power panel and lighting
Date:  February 14, 2014
Value:   $25,000
Contractor: Ryan Toland Apl

Client: Equity Office | Permit type: Electrical permit | Expiration date: August 14, 2014 | Current use: Comm | Permit id: E325909 | Parcel: 0304408000
2014/02/14250001001 High St Boston MaRyan Toland Apl
Temporary bagging of smoke detectors for dust control during renovation work
Date:  May 28, 2013

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd247207 | Parcel: 0304408000
2013/05/280951 High St Boston Ma
SCORE
100
23rd floor interior demolition of drywall partitions act doors and frames patching of drywall painting minor electrical work including installing temporary lighting.
Date:  July 8, 2014
Value:   $157,000
Contractor: Urshula Patel

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: January 8, 2015 | Current use: Comm | Permit id: Sf381327 | Parcel: 0304408000
2014/07/081570001001 High St Boston MaUrshula Patel
Minor interior renovations of existing office space to include ceiling floor &; minor demo
Date:  December 10, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc205615 | Parcel: 0304408000
2012/12/100951 High St Boston Ma
Demolition / renovation to existing office space including drywall paint and flooring
Date:  October 13, 2010

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc46256 | Parcel: 0304408000
2010/10/130951 High St Boston Ma
Street closure for crane in street 100x25 / erect pedestrian staging on sidewalk/ all work 6am-6pm
Date:  August 26, 2015

Client: Equity Office | Permit type: Street occupancy permit | Expiration date: August 29, 2015 | Permit id: Occu-510482 | Parcel: 0304408000
2015/08/260951 High St Boston Ma
Bfd chemist certificate proces
Date:  August 21, 2013

Client: Equity Office | Permit id: Chm277227 | Parcel: 0304408000
2013/08/210951 High St Boston Ma
Removal of non -structural ;office partation ;
Date:  February 12, 2015

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc446311 | Parcel: 0304408000
2015/02/120951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during construction
Date:  July 17, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd162395 | Parcel: 0304408000
2012/07/170951 High St Boston Ma
Permit for the movie "black mass"
Date:  July 23, 2014

Client: Equity Office | Permit type: Bfd general permit | Permit id: Gp386670 | Parcel: 0304408000
2014/07/230951 High St Boston Ma
SCORE
88
17th floor interior office renovations to include new finishes (paint reflected ceiling carpet vct with a new cabinet and shelf) and the reworking of existing fire protection and mechanical systems to reflect the new layout. Work will also include new electrical devices and reworking of existing fire alarm system to accommodate the revised floor plan. This work included in alt54749 but an ammendment (a68203) was filed to remove the 17th floor from the scope of work of that permit. Cost reflected on alt54749.
Date:  April 1, 2011
Contractor: Greg St. Mary

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: October 1, 2011 | Current use: Comm | Permit id: Alt68202 | Parcel: 0304408000
2011/04/010881 High St Boston MaGreg St. Mary
Cutting &; welding of (3) cooling towers (dpl) bfd paid detail required
Date:  October 2, 2015

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw525368 | Parcel: 0304408000
2015/10/020951 High St Boston Ma
SCORE
100
Make safe demo vacant tenant space on half of the floor. Install 4 high bay lights.
Date:  November 5, 2014
Value:   $10,500
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: May 5, 2015 | Current use: Comm | Permit id: E423157 | Parcel: 0304408000
2014/11/05105001001 High St Boston MaMarc Frisoli
SCORE
100
Add new speaker strobes and (1) new smoke detector in tenant space.
Date:  October 1, 2014
Value:   $10,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: April 1, 2015 | Current use: Comm | Permit id: Efa412068 | Parcel: 0304408000
2014/10/01100001001 High St Boston MaMarc Frisoli
Demolition &; install drywall in closet only
Date:  April 23, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc352352 | Parcel: 0304408000
2014/04/230951 High St Boston Ma
Burning &; welding for the installation of steel channels (dpl) bfd paid detail required
Date:  May 2, 2014

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw355684 | Parcel: 0304408000
2014/05/020951 High St Boston Ma
SCORE
100
Build out of office space from existing cubicles on the 10th floor. Install new flooring act lighting painting relocating 1 sprinkler head no fire alarm and egress is not affected.
Date:  October 18, 2010
Value:   $17,000

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: April 18, 2011 | Current use: Comm | Permit id: Sf47544 | Parcel: 0304408000
2010/10/18170001001 High St Boston MaGarland Building Company
SCORE
100
Commercial office fit out on 15th floor (equity vsp)
Date:  July 24, 2012
Value:   $50,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 24, 2013 | Current use: Comm | Permit id: E165123 | Parcel: 0304408000
2012/07/24500001001 High St Boston MaJeffrey Catalano
SCORE
82
Change out pantry sink and watewr heater on 20th floor of 1 high street boston ma 02109
Date:  October 7, 2010
Value:   $7,600
Contractor: Scott Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: April 7, 2011 | Current use: Comm | Permit id: Pl45867 | Parcel: 0304408000
2010/10/077600821 High St Boston MaScott Howard
SCORE
100
Interior commercial office renovations to include: demo painting and carpentry.
Date:  February 20, 2014
Value:   $29,992
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: August 20, 2014 | Current use: Comm | Permit id: Sf338151 | Parcel: 0304408000
2014/02/20299921001 High St Boston MaJonathan Lake
Temporary bagging of smoke detectors for dust control during renovation work
Date:  June 3, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd368707 | Parcel: 0304408000
2014/06/030951 High St Boston Ma
Cutting / burning / welding for modifications and repairs to base; building piping and mechanical systems (dpl)
Date:  August 12, 2010

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw37208 | Parcel: 0304408000
2010/08/120951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during construction (maintain log and security)
Date:  May 31, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd145419 | Parcel: 0304408000
2012/05/310951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during construction maintain log &; security
Date:  May 23, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd77793 | Parcel: 0304408000
2011/05/230951 High St Boston Ma
SCORE
99
White noise system [ speech privacy]
Date:  April 17, 2012
Value:   $17,000
Contractor: Ronald Wallace

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: October 17, 2012 | Current use: Comm | Permit id: Elv132650 | Parcel: 0304408000
2012/04/1717000991 High St Boston MaRonald Wallace
SCORE
93
Minor interior improvements to existing commercial office space to include non structural demo new drywall ceiling flooring and finishes on the 5th floor.
Date:  August 4, 2014
Value:   $160,000
Contractor: Daniel Guimond

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: February 4, 2015 | Current use: Comm | Permit id: Sf391271 | Parcel: 0304408000
2014/08/04160000931 High St Boston MaDaniel Guimond
SCORE
82
Installing pantry sink in 1st floor office at 1 high street boston ma 02109
Date:  October 7, 2010
Value:   $9,000
Contractor: Scott Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: April 7, 2011 | Current use: Comm | Permit id: Pl45870 | Parcel: 0304408000
2010/10/079000821 High St Boston MaScott Howard
SCORE
100
#15-044 fragomen
Date:  January 23, 2015
Value:   $250,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: July 23, 2015 | Current use: Comm | Permit id: E440451 | Parcel: 0304408000
2015/01/232500001001 High St Boston MaJohn Omahony
SCORE
100
To install 1 kit sink and 1 hwh @ 1 high st-15th floor
Date:  July 11, 2012
Value:   $19,000
Contractor: Douglas Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: January 11, 2013 | Current use: Comm | Permit id: Pl161470 | Parcel: 0304408000
2012/07/11190001001 High St Boston MaDouglas Howard
Install new f/a devices on 24th &; 25th floor off existing simplex panel
Date:  June 20, 2011

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf80546 | Parcel: 0304408000
2011/06/200951 High St Boston Ma
SCORE
89
Build-out of new closet for data room network gear.
Date:  March 8, 2012
Value:   $12,267
Contractor: Marie Cunningham

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: September 8, 2012 | Current use: Mixed | Permit id: Sf121773 | Parcel: 0304408000
2012/03/0812267891 High St Boston MaMarie Cunningham
SCORE
100
Install wiring within office cubicles on 26th floor for bank of montreal
Date:  June 15, 2012
Value:   $500
Contractor: Thomas Newton

Client: Equity Office | Permit type: Electrical permit | Expiration date: December 15, 2012 | Current use: Comm | Permit id: E151751 | Parcel: 0304408000
2012/06/155001001 High St Boston MaThomas Newton
Temporary bagging of smoke detectors for dust control during ongoing construction work
Date:  July 21, 2010

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd34274 | Parcel: 0304408000
2010/07/210951 High St Boston Ma
Furnish and install (21) speaker strobes (4) strobes (2) smoke detectors (3 rai (2) pull stations and (1) booster panel doc#20100958
Date:  November 16, 2010

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf48747 | Parcel: 0304408000
2010/11/160951 High St Boston Ma
SCORE
99
Cat 5e cables on 8th floor
Date:  December 6, 2013
Value:   $20,000
Contractor: Ronald Wallace

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: June 6, 2014 | Current use: Comm | Permit id: Elv311048 | Parcel: 0304408000
2013/12/0620000991 High St Boston MaRonald Wallace
Temporary bagging smoke detectors for dust control from renovation work
Date:  April 1, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd458594 | Parcel: 0304408000
2015/04/010951 High St Boston Ma
SCORE
100
Install wiring within office cubicles on 15th floor for premier global
Date:  March 12, 2013
Value:   $250
Contractor: Thomas Newton

Client: Equity Office | Permit type: Electrical permit | Expiration date: September 12, 2013 | Current use: Comm | Permit id: E225669 | Parcel: 0304408000
2013/03/122501001 High St Boston MaThomas Newton
Minor demolition to include removal of drywall paint;and carpet and replace with new
Date:  June 4, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc369476 | Parcel: 0304408000
2014/06/040951 High St Boston Ma
SCORE
100
Preparatory demo of existing office space on the 18th floor for future tenant build out. Egress not affected.
Date:  July 15, 2010
Value:   $118,513

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: January 15, 2011 | Current use: Comm | Permit id: Sf33630 | Parcel: 0304408000
2010/07/151185131001 High St Boston MaGarland Building Company
Minor selective demolition and interior fit-out for existing office and construction of new offices and conference rooms renovation work to include new drywall partition new flooring accoustical ceilings and painting
Date:  June 27, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc156828 | Parcel: 0304408000
2012/06/270951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during renovation work
Date:  January 17, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd318747 | Parcel: 0304408000
2014/01/170951 High St Boston Ma
Construction / reno on 16th 17th &; 18th floors
Date:  January 7, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd57832 | Parcel: 0304408000
2011/01/070951 High St Boston Ma
Selective interior minor demolition to include drywall patching and;painting in prepartion for new tenants
Date:  July 11, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc381548 | Parcel: 0304408000
2014/07/110951 High St Boston Ma
SCORE
100
Demolition of partitions act ceiling tile flooring and installation of temp lighting.
Date:  December 11, 2014
Value:   $249,536
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: June 11, 2015 | Current use: Comm | Permit id: Sf433924 | Parcel: 0304408000
2014/12/112495361001 High St Boston MaJonathan Lake
SCORE
99
Installation of new tel-data cabling
Date:  June 15, 2011
Value:   $35,000
Contractor: Dennis Obrien

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: December 15, 2011 | Current use: Comm | Permit id: Elv81575 | Parcel: 0304408000
2011/06/1535000991 High St Boston MaDennis Obrien
SCORE
100
Tenant fittup on the 19th floor
Date:  May 3, 2010
Value:   $135,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: November 3, 2010 | Current use: Comm | Permit id: E22910 | Parcel: 0304408000
2010/05/031350001001 High St Boston MaMarc Frisoli
SCORE
99
Install new fire alarm system for 13th and 14th floors
Date:  August 17, 2010
Value:   $30,000
Contractor: Angela Noenickx

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: February 17, 2011 | Current use: Comm | Permit id: Efa38668 | Parcel: 0304408000
2010/08/1730000991 High St Boston MaAngela Noenickx
Demolition of existing walls and renovations to include paint and drywall
Date:  July 17, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc162389 | Parcel: 0304408000
2012/07/170951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during ongoing construction
Date:  January 19, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd58764 | Parcel: 0304408000
2011/01/190951 High St Boston Ma
SCORE
93
Selective demolition only of (3) interior offices with non-load bearing partitions. No new work is required.
Date:  August 14, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc506147 | Parcel: 0304408000
2015/08/140931 High St Boston MaMatt Santapaula
SCORE
100
Install new power lighting dimming and mechanical feeds for the 24th & 25th floors. Install temp lights & power misc demo.
Date:  May 24, 2011
Value:   $280,000
Contractor: Dennis Mahoney

Client: Equity Office | Permit type: Electrical permit | Expiration date: November 24, 2011 | Current use: Comm | Permit id: E78307 | Parcel: 0304408000
2011/05/242800001001 High St Boston MaDennis Mahoney
SCORE
100
Low voltage wiring orc 9th fl
Date:  October 8, 2014
Value:   $10,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: April 8, 2015 | Current use: Comm | Permit id: Elv414263 | Parcel: 0304408000
2014/10/08100001001 High St Boston MaJulie Colantoni
SCORE
100
Add outlets furniture feed relocate lights
Date:  September 3, 2014
Value:   $5,400
Contractor: Ronald Forgione

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 3, 2015 | Current use: Comm | Permit id: E393275 | Parcel: 0304408000
2014/09/0354001001 High St Boston MaRonald Forgione
SCORE
100
Office fit out on 15th floor (equity vsp)
Date:  July 25, 2012
Value:   $10,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: January 25, 2013 | Current use: Comm | Permit id: Efa165124 | Parcel: 0304408000
2012/07/25100001001 High St Boston MaJeffrey Catalano
SCORE
100
Bmo capital markets - 26th floor : selective demo in preparation of tenant fitout to include finishes relocation of fire alarm &; fire sprinkler heads;and meps. Per plans
Date:  June 12, 2013
Value:   $130,000
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: December 12, 2013 | Current use: Comm | Permit id: Alt250595 | Parcel: 0304408000
2013/06/121300001001 High St Boston MaJonathan Lake
SCORE
100
Renovation to existing office space on the 10th floor (marcus & millichap)
Date:  June 4, 2013
Value:   $45,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: December 4, 2013 | Current use: Comm | Permit id: E248772 | Parcel: 0304408000
2013/06/04450001001 High St Boston MaJeffrey Catalano
SCORE
100
Add new outlets and rewire lights
Date:  July 3, 2012
Value:   $80,000
Contractor: Bruce Cialdea

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 3, 2013 | Current use: Comm | Permit id: E159632 | Parcel: 0304408000
2012/07/03800001001 High St Boston MaBruce Cialdea
SCORE
100
Installation of generator on roof
Date:  February 4, 2010
Value:   $30,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: August 4, 2010 | Current use: Comm | Permit id: E12781 | Parcel: 0304408000
2010/02/04300001001 High St Boston MaJohn Omahony
Renovations to existing office space to include new walls ceilings flooring carpet &; paint
Date:  April 2, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc128088 | Parcel: 0304408000
2012/04/020951 High St Boston Ma
SCORE
93
Minor renovation to the hartford 8th floor 1 high street consisting of new carpet painting new millwork electrical and plumbing
Date:  December 5, 2013
Value:   $260,000
Contractor: Mark Price

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: June 5, 2014 | Current use: Comm | Permit id: Sf308734 | Parcel: 0304408000
2013/12/05260000931 High St Boston MaMark Price
Selective demo of existing finishes;for new tenant fit-out
Date:  June 12, 2013

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc251332 | Parcel: 0304408000
2013/06/120951 High St Boston Ma
SCORE
100
Remove existing single ply membrane roof and flashings and legally dispose. Install new insulationm and epdm membrane with associated flashings.
Date:  June 9, 2011
Value:   $282,843
Contractor: Daniel Hulverson

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: December 9, 2011 | Current use: Comm | Permit id: Sf79969 | Parcel: 0304408000
2011/06/092828431001 High St Boston MaDaniel Hulverson
Interior renovations to include demo painting &;carpentry;
Date:  February 25, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc338454 | Parcel: 0304408000
2014/02/250951 High St Boston Ma
SCORE
100
Demo space. Tenant fit out consisting of new power and lighting.
Date:  October 1, 2014
Value:   $87,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: April 1, 2015 | Current use: Comm | Permit id: E412060 | Parcel: 0304408000
2014/10/01870001001 High St Boston MaMarc Frisoli
SCORE
100
Prepatory of existing office space on the 13th & 14th floors for future tenant build out. Egress not affected.
Date:  July 15, 2010
Value:   $151,599

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: January 15, 2011 | Current use: Comm | Permit id: Sf33626 | Parcel: 0304408000
2010/07/151515991001 High St Boston MaGarland Building Company
SCORE
93
Install of water filtration system
Date:  March 11, 2011
Value:   $500
Contractor: Mark St. Hilaire

Client: Equity Office | Permit type: Plumbing permit | Expiration date: September 11, 2011 | Current use: Comm | Permit id: Pl66206 | Parcel: 0304408000
2011/03/11500931 High St Boston MaMark St. Hilaire
SCORE
100
Renovations to the 8th floor consiting of new power and reusing existing fixtures for new proposed layout
Date:  September 27, 2011
Value:   $35,000
Contractor: Ryan Toland Apl

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 27, 2012 | Current use: Comm | Permit id: E97557 | Parcel: 0304408000
2011/09/27350001001 High St Boston MaRyan Toland Apl
Interior renovations of existing space to include demo of stairs new drywall ;flooring &; ceiling
Date:  January 16, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc318283 | Parcel: 0304408000
2014/01/160951 High St Boston Ma
Architectural finishes (ie. Flooring ceiling millwork drywall paint)
Date:  April 1, 2015

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc458592 | Parcel: 0304408000
2015/04/010951 High St Boston Ma
Tenant fit out add a/v and initiating devices on floors 16 &; 18 doc#20110115
Date:  February 25, 2011

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf63916 | Parcel: 0304408000
2011/02/250951 High St Boston Ma
Interior fit-out of existing office space to include walls and finishes
Date:  June 27, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc156348 | Parcel: 0304408000
2012/06/270951 High St Boston Ma
SCORE
100
Low voltage wiring premiere global services 1 high street
Date:  January 18, 2013
Value:   $10,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: July 18, 2013 | Current use: Comm | Permit id: Elv214295 | Parcel: 0304408000
2013/01/18100001001 High St Boston MaJulie Colantoni
Temporary bagging of smoke detectors for dust control from demolition work
Date:  March 31, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd458011 | Parcel: 0304408000
2015/03/310951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during construction
Date:  October 20, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd101270 | Parcel: 0304408000
2011/10/200951 High St Boston Ma
SCORE
93
Filtered water cooler
Date:  April 30, 2013
Value:   $500
Contractor: Mark St. Hilaire

Client: Equity Office | Permit type: Plumbing permit | Expiration date: October 30, 2013 | Current use: Comm | Permit id: Pl238182 | Parcel: 0304408000
2013/04/30500931 High St Boston MaMark St. Hilaire
SCORE
75
New build out of tenant space on floors 24 &; 25. Work to include all new partitions new finishes and mechanical systems.
Date:  May 10, 2011
Value:   $1,925,000
Contractor: John M Maunsell

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: November 10, 2011 | Current use: Comm | Permit id: Alt75159 | Parcel: 0304408000
2011/05/101925000751 High St Boston MaJohn M Maunsell
SCORE
83
18 th floor fire alarm old address 1 high st
Date:  September 27, 2010
Value:   $9,000
Contractor: Thomas Tuton

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: March 27, 2011 | Current use: Comm | Permit id: Efa44416 | Parcel: 0304408000
2010/09/279000831 High St Boston MaThomas Tuton
Temporary bagging of smoke detectors for dust control during renovation work
Date:  June 27, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd156349 | Parcel: 0304408000
2012/06/270951 High St Boston Ma
To remove asbestos from 1 high street boston
Date:  May 19, 2011

Client: Equity Office | Permit type: Bfd asbestos removal | Permit id: Asb77726 | Parcel: 0304408000
2011/05/190951 High St Boston Ma
SCORE
96
Renovation to tenant fit out space consisting of new lighting and power.
Date:  July 31, 2012
Value:   $55,000
Contractor: Michael Lawlor

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 31, 2013 | Current use: Comm | Permit id: E167802 | Parcel: 0304408000
2012/07/3155000961 High St Boston MaMichael Lawlor
Bagging smoke detectors
Date:  October 14, 2010

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd46202 | Parcel: 0304408000
2010/10/140951 High St Boston Ma
Installation of ceiling tiles
Date:  August 13, 2012

Client: Equity Office | Permit type: Bfd chemist certificate proces | Current use: Comm | Permit id: Chm170207 | Parcel: 0304408000
2012/08/130951 High St Boston Ma
SCORE
100
Low voltage wiring addison group
Date:  February 28, 2014
Value:   $14,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: August 28, 2014 | Current use: Comm | Permit id: Elv338992 | Parcel: 0304408000
2014/02/28140001001 High St Boston MaJulie Colantoni
SCORE
100
Low voltage wiring for michael page intl 1 high st
Date:  July 19, 2012
Value:   $10,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: January 19, 2013 | Current use: Comm | Permit id: Elv160623 | Parcel: 0304408000
2012/07/19100001001 High St Boston MaJulie Colantoni
Fire alarm devices shall be maintined;in accordance with manufactures written instructions any;temporary fire alarm system requires a fire alarm permit.;~; doc# 20120441
Date:  May 8, 2012

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf132045 | Parcel: 0304408000
2012/05/080951 High St Boston Ma
Minor interior renovations to existing commercial space including new drywall ceiling and finishes
Date:  January 21, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc318740 | Parcel: 0304408000
2014/01/210951 High St Boston Ma
Temporary bagging of smoke detectors for dust control.
Date:  September 8, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd404538 | Parcel: 0304408000
2014/09/080951 High St Boston Ma
Bagging of smoke detectors
Date:  January 15, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd318297 | Parcel: 0304408000
2014/01/150951 High St Boston Ma
SCORE
100
Build out of new tenant space on the 13th &; 14th floors. Work to include new finishes mep upgrades fire alarm.
Date:  August 4, 2010
Value:   $1,360,000

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: February 4, 2011 | Current use: Comm | Permit id: Alt36222 | Parcel: 0304408000
2010/08/0413600001001 High St Boston MaGarland Building Company
Temporary bagging of smoke detectors for dust control during demolition work
Date:  December 15, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd433962 | Parcel: 0304408000
2014/12/150951 High St Boston Ma
SCORE
93
Sediment carbon water filtration system
Date:  June 1, 2012
Value:   $500
Contractor: Mark St. Hilaire

Client: Equity Office | Permit type: Plumbing permit | Expiration date: December 1, 2012 | Current use: Comm | Permit id: Pl143661 | Parcel: 0304408000
2012/06/01500931 High St Boston MaMark St. Hilaire
SCORE
100
To install 3 kitchen sinks 2 water coolers 5 lavs 6 toliets 2 urinals and 2 water heaters on 24th and 25th floors
Date:  June 7, 2011
Value:   $44,800
Contractor: Douglas Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: December 7, 2011 | Current use: Comm | Permit id: Pl79293 | Parcel: 0304408000
2011/06/07448001001 High St Boston MaDouglas Howard
SCORE
100
Provide electrical demolition and make safe on floor 23.
Date:  July 11, 2014
Value:   $15,000
Contractor: David Lynch

Client: Equity Office | Permit type: Electrical permit | Expiration date: January 11, 2015 | Current use: Comm | Permit id: E382868 | Parcel: 0304408000
2014/07/11150001001 High St Boston MaDavid Lynch
SCORE
100
16th 17th 18th floors itg remodel
Date:  January 14, 2011
Value:   $10,000
Contractor: William Weber

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: July 14, 2011 | Current use: Comm | Permit id: Efa58335 | Parcel: 0304408000
2011/01/14100001001 High St Boston MaWilliam Weber
SCORE
99
Demolition and removal only of existing architectural finishes (ie. Drywall partitions carpet act etc.) and mep systems (ie. Plumbing electrical hvac etc.)
Date:  February 18, 2015
Value:   $9,500

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: August 18, 2015 | Current use: Comm | Permit id: Sf447998 | Parcel: 0304408000
2015/02/189500991 High St Boston MaDavid M Corderman Jr
SCORE
100
Install data telephone cables
Date:  September 3, 2014
Value:   $14,000
Contractor: Ronald Forgione

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: March 3, 2015 | Current use: Comm | Permit id: Elv387506 | Parcel: 0304408000
2014/09/03140001001 High St Boston MaRonald Forgione
SCORE
93
Install new floor door on the 28th floor consisting of drywall and painting
Date:  April 11, 2014
Value:   $30,000
Contractor: Mark Price

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: October 11, 2014 | Current use: Comm | Permit id: Sf351812 | Parcel: 0304408000
2014/04/1130000931 High St Boston MaMark Price
SCORE
100
Install new kitchen sink hot water heater
Date:  October 18, 2011
Value:   $9,000
Contractor: P J Oshaughnessy

Client: Equity Office | Permit type: Plumbing permit | Expiration date: April 18, 2012 | Current use: Comm | Permit id: Pl101040 | Parcel: 0304408000
2011/10/1890001001 High St Boston MaP J Oshaughnessy
Demo/construction
Date:  February 7, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc324374 | Parcel: 0304408000
2014/02/070951 High St Boston Ma
SCORE
100
Demolition of walls
Date:  September 4, 2014
Value:   $31,783
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: March 4, 2015 | Current use: Comm | Permit id: Sf403748 | Parcel: 0304408000
2014/09/04317831001 High St Boston MaJonathan Lake
Heat detectors shall be witness test by bfd.; doc# 20150059
Date:  March 2, 2015

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf443790 | Parcel: 0304408000
2015/03/020951 High St Boston Ma
SCORE
96
Update existing fire alarm- add 1 smoke &; relocate 3 audio-visuals 5th fl transperfectr space cost of permit paid in efa380144
Date:  September 19, 2014
Contractor: Chris Nolin

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: March 19, 2015 | Current use: Comm | Permit id: Sf409503 | Parcel: 0304408000
2014/09/190961 High St Boston MaChris Nolin
Renovations to include paint plaster partitions ;millwork &; new finishes
Date:  April 7, 2011

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc70874 | Parcel: 0304408000
2011/04/070951 High St Boston Ma
SCORE
93
Amendment to alt458549. Removal of interior vestibule leading out to the exterior roof deck. Swap out (2) light fixtures based on ceiling type (i. E. Going from hard ceiling to no exposed ceiling). No other trades affected. Cost was captured during the initial budgeting process.
Date:  August 4, 2015
Contractor: Matt Santapaula

Client: Equity Office | Permit type: Amendment to a long form | Expiration date: February 4, 2016 | Current use: Comm | Permit id: A492618 | Parcel: 0304408000
2015/08/040931 High St Boston MaMatt Santapaula
SCORE
100
Tenant fittup 10th floor
Date:  October 25, 2010
Value:   $2,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: April 25, 2011 | Current use: Comm | Permit id: E48474 | Parcel: 0304408000
2010/10/2520001001 High St Boston MaMarc Frisoli
Temporary bagging of smoke detectors
Date:  December 11, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd433562 | Parcel: 0304408000
2014/12/110951 High St Boston Ma
SCORE
99
Locations cat5 data. 8th fl
Date:  September 28, 2011
Value:   $15,000
Contractor: Ronald Wallace

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: March 28, 2012 | Current use: Comm | Permit id: Elv98148 | Parcel: 0304408000
2011/09/2815000991 High St Boston MaRonald Wallace
SCORE
99
Temp genny power for film production
Date:  July 1, 2010
Value:   $500
Contractor: Edward Marcotti

Client: Equity Office | Permit type: Electrical temporary service | Expiration date: January 1, 2011 | Current use: Vacld | Permit id: Ets31954 | Parcel: 0304408000
2010/07/01500991 High St Boston MaEdward Marcotti
Temporary bagging of smoke detectors for dust control during construction
Date:  September 2, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd92978 | Parcel: 0304408000
2011/09/020951 High St Boston Ma
Renovations to new offices &; conference rooms to include paint carpet and ceilings
Date:  January 10, 2011

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc57904 | Parcel: 0304408000
2011/01/100951 High St Boston Ma
Temporary bagging of smoke detectors
Date:  February 18, 2015

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd446316 | Parcel: 0304408000
2015/02/180951 High St Boston Ma
Welding for installation of a stainless steel sink (dpl) bfd paid detail required
Date:  December 2, 2011

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw107790 | Parcel: 0304408000
2011/12/020951 High St Boston Ma
SCORE
100
Fire alarm for new tenant fit up.
Date:  September 30, 2010
Value:   $15,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: March 30, 2011 | Current use: Comm | Permit id: Efa45053 | Parcel: 0304408000
2010/09/30150001001 High St Boston MaMarc Frisoli
SCORE
93
Minor interior renovations to existing commercial space to include demolition new drywall ceiling and finishes. 5th fl
Date:  January 31, 2014
Value:   $94,000
Contractor: Daniel Guimond

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: July 31, 2014 | Current use: Comm | Permit id: Alt318583 | Parcel: 0304408000
2014/01/3194000931 High St Boston MaDaniel Guimond
Interior renovations of existing office space to include demo drywall &; carpentry
Date:  May 28, 2013

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc247206 | Parcel: 0304408000
2013/05/280951 High St Boston Ma
SCORE
100
21-22 floor
Date:  September 1, 2011
Value:   $20,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: March 1, 2012 | Current use: Comm | Permit id: Efa93469 | Parcel: 0304408000
2011/09/01200001001 High St Boston MaKaren Sykes
Bagging of smoke detectors
Date:  April 7, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd70876 | Parcel: 0304408000
2011/04/070951 High St Boston Ma
SCORE
93
Water filtration
Date:  March 31, 2014
Value:   $50
Contractor: Mark St. Hilaire

Client: Equity Office | Permit type: Plumbing permit | Expiration date: September 30, 2014 | Current use: Comm | Permit id: Pl345309 | Parcel: 0304408000
2014/03/3150931 High St Boston MaMark St. Hilaire
SCORE
88
Removal of 17th floor construction work from the scope of work and permit alt54749. Alt54749 included work on 16th 17 and 18th floors. A new long form permit application is being filed for the work on the 17th floor. It will carry a construction cost of zero dollars and this credit of work to be done shall also carry a construction value change of zero.
Date:  March 30, 2011
Contractor: Greg St. Mary

Client: Equity Office | Permit type: Amendment to a long form | Expiration date: September 30, 2011 | Current use: Comm | Permit id: A68203 | Parcel: 0304408000
2011/03/300881 High St Boston MaGreg St. Mary
SCORE
83
18th floor f a wire & devices
Date:  August 12, 2010
Value:   $9,000
Contractor: Thomas Tuton

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: February 12, 2011 | Current use: Comm | Permit id: Efa37979 | Parcel: 0304408000
2010/08/129000831 High St Boston MaThomas Tuton
SCORE
100
Film production movie "ted" install temporary tow behind generator at 1 high street for lights and cameras to film movie ted work to be done may and 11 2011. Dave norcott (508-631-0666 cell) is the staff electrician for thunder buddies llc the production company for the movie.
Date:  May 2, 2011
Value:   $100
Contractor: David Norcott

Client: Equity Office | Permit type: Electrical temporary service | Expiration date: November 2, 2011 | Current use: Comm | Permit id: Ets74856 | Parcel: 0304408000
2011/05/021001001 High St Boston MaDavid Norcott
Demolition of existing finishes and reinstallation of new finishes
Date:  February 19, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc326869 | Parcel: 0304408000
2014/02/190951 High St Boston Ma
Renovations of existing office space to include demo &; carpentry etc.
Date:  December 10, 2013

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc310613 | Parcel: 0304408000
2013/12/100951 High St Boston Ma
SCORE
93
Minor interior renovations to 15th floor work;including new partitions minor ceiling work electrical plumbing hvac carpet millwork sprinkler and fire alarm systm;and paint. As per plans
Date:  January 4, 2013
Value:   $112,000
Contractor: Mark Price

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: July 4, 2013 | Current use: Comm | Permit id: Alt207454 | Parcel: 0304408000
2013/01/04112000931 High St Boston MaMark Price
SCORE
93
Sediment carbon filtration
Date:  July 7, 2011
Value:   $500
Contractor: Mark St. Hilaire

Client: Equity Office | Permit type: Plumbing permit | Expiration date: January 7, 2012 | Current use: Comm | Permit id: Pl82552 | Parcel: 0304408000
2011/07/07500931 High St Boston MaMark St. Hilaire
SCORE
100
Install new fire alarm devices in 9th floor common corridor.
Date:  October 14, 2014
Value:   $11,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: April 14, 2015 | Current use: Comm | Permit id: Efa415766 | Parcel: 0304408000
2014/10/14110001001 High St Boston MaMarc Frisoli
SCORE
100
Installation of 33 dual voice data wire runs on f4
Date:  July 31, 2012
Value:   $11,000
Contractor: Kerry Mcwade

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: January 31, 2013 | Current use: Comm | Permit id: Elv167543 | Parcel: 0304408000
2012/07/31110001001 High St Boston MaKerry Mcwade
SCORE
100
21st floor
Date:  December 8, 2011
Value:   $14,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: June 8, 2012 | Current use: Comm | Permit id: Elv107362 | Parcel: 0304408000
2011/12/08140001001 High St Boston MaKaren Sykes
SCORE
100
Installation of plumbing for a kitchen sink
Date:  June 20, 2013
Value:   $5,500
Contractor: Kevin Maceachern

Client: Equity Office | Permit type: Plumbing permit | Expiration date: December 20, 2013 | Current use: Comm | Permit id: Pl255903 | Parcel: 0304408000
2013/06/2055001001 High St Boston MaKevin Maceachern
SCORE
100
Selective demo. Install temp lighting.
Date:  April 2, 2015
Value:   $19,000
Contractor: Marc Frisoli

Client: Equity Office | Permit type: Electrical permit | Expiration date: October 2, 2015 | Current use: Comm | Permit id: E458572 | Parcel: 0304408000
2015/04/02190001001 High St Boston MaMarc Frisoli
Tenant fit out of;new fire alarm devices 13th &; 14th floor tie into simplex addressable system riser replace old autocall duct det pulls etc. Work to be done per nfpa 72 7 cmr 7th ed.; no occupancy in impaired zone. Doc#20100832 ;
Date:  October 4, 2010

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf43476 | Parcel: 0304408000
2010/10/040951 High St Boston Ma
SCORE
100
Change occupancy to include take out with freshii restaurant - ground floor.
Date:  August 19, 2011
Contractor: Mann Braga

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: February 19, 2012 | Current use: Comm | Permit id: Alt85767 | Parcel: 0304408000
2011/08/1901001 High St Boston MaMann Braga
Cutting &; welding for modifications/repairs to the base bldg piping &; mechanical systems (dpl) bfd paid detail required
Date:  December 31, 2012

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw209109 | Parcel: 0304408000
2012/12/310951 High St Boston Ma
SCORE
100
To install 1 sink and 1 water heater on the 15th floor @ 1 high st
Date:  August 7, 2012
Value:   $10,825
Contractor: Douglas Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 7, 2013 | Current use: Comm | Permit id: Pl170385 | Parcel: 0304408000
2012/08/07108251001 High St Boston MaDouglas Howard
Upgrade core devices on 15th &; 28th floor doc#20101044
Date:  January 3, 2011

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf51540 | Parcel: 0304408000
2011/01/030951 High St Boston Ma
SCORE
100
Install wiring for access control of 13 doors and intall 7 video intercoms
Date:  September 21, 2010
Value:   $21,000
Contractor: Brian Souza

Client: Equity Office | Permit type: Electrical permit | Expiration date: March 21, 2011 | Current use: Comm | Permit id: E43443 | Parcel: 0304408000
2010/09/21210001001 High St Boston MaBrian Souza
SCORE
94
Installation of electrical for new hvac unit and power for it equipment
Date:  March 14, 2012
Value:   $3,500
Contractor: Michael Weber

Client: Equity Office | Permit type: Electrical permit | Expiration date: September 14, 2012 | Current use: Comm | Permit id: E124743 | Parcel: 0304408000
2012/03/143500941 High St Boston MaMichael Weber
On-going construction
Date:  September 10, 2010

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd41396 | Parcel: 0304408000
2010/09/100951 High St Boston Ma
Core upgrade 18th floor doc#20100758
Date:  October 7, 2010

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf40306 | Parcel: 0304408000
2010/10/070951 High St Boston Ma
Interior demolition to include removal of act drywall partitions and door frames
Date:  June 3, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc368711 | Parcel: 0304408000
2014/06/030951 High St Boston Ma
New fire alarm smokes duct smokes alvs for entire 5th floor. Included demo and new wiring. Doc#20140233
Date:  April 2, 2014

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf339503 | Parcel: 0304408000
2014/04/020951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during miscellaneous construction work
Date:  June 27, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd156808 | Parcel: 0304408000
2012/06/270951 High St Boston Ma
Bagging of smoke detectors
Date:  December 10, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd205616 | Parcel: 0304408000
2012/12/100951 High St Boston Ma
Demo/renovations to lobby space to include drywall ceiling ;painting &; flooring
Date:  October 21, 2010

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc47453 | Parcel: 0304408000
2010/10/210951 High St Boston Ma
Demolition
Date:  August 17, 2011

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc90726 | Parcel: 0304408000
2011/08/170951 High St Boston Ma
SCORE
100
Build out of tenant space from existing office space on the 8th floor. Work to include selective demo of finishes new finishes mep upgrades fire alarm.
Date:  September 13, 2011
Value:   $300,000

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: March 13, 2012 | Current use: Comm | Permit id: Alt94747 | Parcel: 0304408000
2011/09/133000001001 High St Boston MaGarland Building Company
SCORE
93
Building amenity space -;1st floor -; renovation work consisting of minor;demolition to an existing space drywall partitions act all finishes and relocate existing mep ;fire alarm &; sprinkler systems.
Date:  September 13, 2013
Value:   $200,000
Contractor: Mark Price

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: March 13, 2014 | Current use: Comm | Permit id: Alt283353 | Parcel: 0304408000
2013/09/13200000931 High St Boston MaMark Price
Temporary bagging of smoke detectors for dust control during construction
Date:  October 28, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd100906 | Parcel: 0304408000
2011/10/280951 High St Boston Ma
Minor renovation work to include drywall flooring millwork and paint
Date:  July 26, 2012

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc165465 | Parcel: 0304408000
2012/07/260951 High St Boston Ma
SCORE
100
Tenant fit out
Date:  March 12, 2015
Value:   $5,000
Contractor: Michael Petrilli

Client: Equity Office | Permit type: Plumbing permit | Expiration date: September 12, 2015 | Current use: Comm | Permit id: Pl450328 | Parcel: 0304408000
2015/03/1250001001 High St Boston MaMichael Petrilli
SCORE
86
Interior office renovation including new finishes (paint carpet millwork) and re-working of existing and installing new mechanical and electrical equipment. Work includes new sprinkler and fire alarm systems.
Date:  December 23, 2010
Value:   $1,250,000

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: June 23, 2011 | Current use: Comm | Permit id: Alt54749 | Parcel: 0304408000
2010/12/231250000861 High St Boston MaSteven Georgopoulos
Renovation of existing office space on 16th floor - doc;20110445 installation to be in accordance with 8th edition 7 cmr and 20 nfpa 72.
Date:  May 18, 2011

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf73348 | Parcel: 0304408000
2011/05/180951 High St Boston Ma
SCORE
100
Install wiring within office cubicles on 5th floor for addison group
Date:  April 22, 2014
Value:   $500
Contractor: Thomas Newton

Client: Equity Office | Permit type: Electrical permit | Expiration date: October 22, 2014 | Current use: Comm | Permit id: E353160 | Parcel: 0304408000
2014/04/225001001 High St Boston MaThomas Newton
Reno work to include new architectural finishes flooring ceiling millwork drywall &; painting
Date:  February 19, 2015

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc448009 | Parcel: 0304408000
2015/02/190951 High St Boston Ma
Demolition of gwb walls act ceilings flooring and temp lights
Date:  January 5, 2015

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc438231 | Parcel: 0304408000
2015/01/050951 High St Boston Ma
Add (2) speaker strobes; (2) visual only; (1) duct smoke; (2) pull stations &; (1) smoke detector;per nfpa 72 7 cmr;-; doc #20110703
Date:  July 19, 2011

Client: Equity Office | Permit type: Bfd fire alarm installations | Permit id: Bfdf83957 | Parcel: 0304408000
2011/07/190951 High St Boston Ma
SCORE
100
Preparatory demo of 20th floor space for future build out.
Date:  September 8, 2010
Value:   $35,000

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: March 8, 2011 | Current use: Comm | Permit id: Sf41471 | Parcel: 0304408000
2010/09/08350001001 High St Boston MaGarland Building Company
SCORE
95
Job number 10158 - bank of montreal 1 high street 26th floor - office space renovation
Date:  April 4, 2012
Value:   $90,500
Contractor: Brian Murphy

Client: Equity Office | Permit type: Electrical permit | Expiration date: October 4, 2012 | Current use: Comm | Permit id: E128318 | Parcel: 0304408000
2012/04/0490500951 High St Boston MaBrian Murphy
SCORE
100
Renovation to 15th floor michael paige and common corridor
Date:  June 25, 2012
Value:   $10,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: December 25, 2012 | Current use: Comm | Permit id: Efa156988 | Parcel: 0304408000
2012/06/25100001001 High St Boston MaJeffrey Catalano
SCORE
86
Interior remodel of the 7th floor for new office fit-up. Work to include new finishes to flooring gwb partitions act ceiling light fixtures meps and fire protection system.
Date:  July 12, 2012
Value:   $1,781,084

Client: Equity Office | Permit type: Long form/alteration permit | Expiration date: January 12, 2013 | Current use: Comm | Permit id: Alt145240 | Parcel: 0304408000
2012/07/121781084861 High St Boston MaSteven Georgopoulos
SCORE
100
Demolition of existing flooring ceiling drywall lights and hvac. Installation of new carpet patching of ceiling skimming of floor post demolition.
Date:  March 30, 2015
Value:   $103,039
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: September 30, 2015 | Current use: Comm | Permit id: Sf457975 | Parcel: 0304408000
2015/03/301030391001 High St Boston MaJonathan Lake
SCORE
96
1 st. Fl. Freshii sandwich shop
Date:  July 12, 2011
Value:   $7,800
Contractor: Tom Tuton

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: January 12, 2012 | Current use: Comm | Permit id: Efa85602 | Parcel: 0304408000
2011/07/127800961 High St Boston MaTom Tuton
Temporary bagging of smoke detectors for dust control during construction
Date:  October 20, 2011

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd101344 | Parcel: 0304408000
2011/10/200951 High St Boston Ma
SCORE
100
Install wiring within office cubicles on 17th floor
Date:  February 8, 2010
Value:   $600
Contractor: Thomas Newton

Client: Equity Office | Permit type: Electrical permit | Expiration date: August 8, 2010 | Current use: Comm | Permit id: E13915 | Parcel: 0304408000
2010/02/086001001 High St Boston MaThomas Newton
SCORE
100
Bathroom and kitchen work
Date:  August 31, 2011
Value:   $85,000
Contractor: Kevin Almeida

Client: Equity Office | Permit type: Plumbing permit | Expiration date: February 29, 2012 | Current use: Comm | Permit id: Pl93279 | Parcel: 0304408000
2011/08/31850001001 High St Boston MaKevin Almeida
Demolition;of walls &; renovations to include ceiling wall &; carpet
Date:  September 13, 2013

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc284219 | Parcel: 0304408000
2013/09/130951 High St Boston Ma
SCORE
91
Renovations on the 12th floor to include building 2 new non demising walls. Minor electrical to reswitch lights no new outlets in new walls. Supply and install new door and frame to match existing. (1 high st)
Date:  May 20, 2010
Value:   $36,000
Contractor: Urshula S Patel

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: November 20, 2010 | Current use: Comm | Permit id: Sf26503 | Parcel: 0304408000
2010/05/2036000911 High St Boston MaUrshula S Patel
SCORE
100
Demolition of gwb walls act ceilings flooring and temp lights
Date:  December 30, 2014
Value:   $138,865
Contractor: Jonathan Lake

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: June 30, 2015 | Current use: Comm | Permit id: Sf438192 | Parcel: 0304408000
2014/12/301388651001 High St Boston MaJonathan Lake
SCORE
100
5th floor demo new speaker strobes smokes pull stations
Date:  February 14, 2014
Value:   $7,550
Contractor: Ryan Toland Apl

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: August 14, 2014 | Current use: Comm | Permit id: Efa325913 | Parcel: 0304408000
2014/02/1475501001 High St Boston MaRyan Toland Apl
Demolition / renovations of existing space to include drywall ceilings painting and flooring (secure any floor openings)
Date:  March 24, 2010

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc18473 | Parcel: 0304408000
2010/03/240951 High St Boston Ma
Demolition of existing gwb walls act ceilings flooring and temp lights
Date:  December 15, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc433964 | Parcel: 0304408000
2014/12/150951 High St Boston Ma
Burning &; welding for the installation of new wt6-beam c8 &; l-3x3 braces (dpl) ; bfd paid detail required
Date:  March 5, 2015

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw449240 | Parcel: 0304408000
2015/03/050951 High St Boston Ma
SCORE
100
Low voltage wiring 1 high st marcus and millichap 10th fl
Date:  June 17, 2013
Value:   $15,000
Contractor: Julie Colantoni

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: December 17, 2013 | Current use: Comm | Permit id: Elv253072 | Parcel: 0304408000
2013/06/17150001001 High St Boston MaJulie Colantoni
SCORE
82
Renovations for the 19th floor (sungard)
Date:  April 28, 2010
Value:   $14,000
Contractor: Scott Howard

Client: Equity Office | Permit type: Plumbing permit | Expiration date: October 28, 2010 | Current use: Comm | Permit id: Pl23388 | Parcel: 0304408000
2010/04/2814000821 High St Boston MaScott Howard
SCORE
100
Jones day - cosmetic changes - 22nd floor new carpet paint lights in 2 office
Date:  August 11, 2011
Value:   $16,000
Contractor: Francesca Dirico

Client: Equity Office | Permit type: Short form bldg permit | Expiration date: February 11, 2012 | Current use: Comm | Permit id: Sf89958 | Parcel: 0304408000
2011/08/11160001001 High St Boston MaFrancesca Dirico
Bagging of smoke detectors
Date:  December 10, 2013

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd310616 | Parcel: 0304408000
2013/12/100951 High St Boston Ma
SCORE
100
21 frist floor
Date:  September 1, 2011
Value:   $20,000
Contractor: Karen Sykes

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: March 1, 2012 | Current use: Comm | Permit id: Elv93458 | Parcel: 0304408000
2011/09/01200001001 High St Boston MaKaren Sykes
SCORE
100
Install low voltage wiring associated with (13) card readers and the associated devices and control panels on the 24th and 25th floors
Date:  June 30, 2011
Value:   $17,000
Contractor: Christopher Sidoti

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: December 30, 2011 | Current use: Comm | Permit id: Elv83826 | Parcel: 0304408000
2011/06/30170001001 High St Boston MaChristopher Sidoti
SCORE
88
Add strobe only to 22 guest rooms at 1 avenue de lafayette
Date:  March 10, 2015
Value:   $14,000
Contractor: Peter Snow

Client: Equity Office | Permit type: Electrical fire alarms | Expiration date: September 10, 2015 | Current use: Mixed | Permit id: Efa450830 | Parcel: 0304408000
2015/03/1014000881 High St Boston MaPeter Snow
Bagging of smoke detectors
Date:  February 25, 2014

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd338459 | Parcel: 0304408000
2014/02/250951 High St Boston Ma
SCORE
100
Install wiring within 98 office cubicles on 13th and 14th floors for zurich insurance.
Date:  December 7, 2010
Value:   $980
Contractor: Thomas Newton

Client: Equity Office | Permit type: Electrical permit | Expiration date: June 7, 2011 | Current use: Comm | Permit id: E49220 | Parcel: 0304408000
2010/12/079801001 High St Boston MaThomas Newton
To remove asbestos from 1 high street brighton
Date:  April 22, 2011

Client: Equity Office | Permit type: Bfd asbestos removal | Permit id: Asb73552 | Parcel: 0304408000
2011/04/220951 High St Boston Ma
Demolition / renovation to existing office space to include drywall flooring and ceilings
Date:  July 23, 2010

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc34250 | Parcel: 0304408000
2010/07/230951 High St Boston Ma
Of flooring ceiling doors lights etc
Date:  March 31, 2015

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc458008 | Parcel: 0304408000
2015/03/310951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during construction
Date:  January 12, 2012

Client: Equity Office | Permit type: Bfd bag smoke detectors | Permit id: Bsd100900 | Parcel: 0304408000
2012/01/120951 High St Boston Ma
SCORE
100
Office renovation
Date:  April 26, 2011
Value:   $50,000
Contractor: John Omahony

Client: Equity Office | Permit type: Electrical permit | Expiration date: October 26, 2011 | Current use: Comm | Permit id: E72724 | Parcel: 0304408000
2011/04/26500001001 High St Boston MaJohn Omahony
SCORE
98
Voice and data low voltage cabling for 38 workstations.
Date:  September 17, 2014
Value:   $15,000
Contractor: James Mcguire

Client: Equity Office | Permit type: Electrical low voltage | Expiration date: March 17, 2015 | Current use: Comm | Permit id: Elv405890 | Parcel: 0304408000
2014/09/1715000981 High St Boston MaJames Mcguire
Minor interior renovations to existing commercial space including new drywall ceiling and flooring
Date:  January 21, 2014

Client: Equity Office | Permit type: Bfd construction demo reno | Permit id: Fdc318739 | Parcel: 0304408000
2014/01/210951 High St Boston Ma
SCORE
100
Renovation to 15th floor michael paige and common corridor
Date:  June 25, 2012
Value:   $40,000
Contractor: Jeffrey Catalano

Client: Equity Office | Permit type: Electrical permit | Expiration date: December 25, 2012 | Current use: Comm | Permit id: E156984 | Parcel: 0304408000
2012/06/25400001001 High St Boston MaJeffrey Catalano
SCORE
89
Security system reconnect upgrade 184 high street basement
Date:  April 7, 2015
Value:   $129
Contractor: Julie Kollett

Permit type: Electrical low voltage | Expiration date: October 7, 2015 | Current use: Comm | Permit id: Elv458100 | Parcel: 0304045000
2015/04/07129891 High St Boston MaJulie Kollett
Stand truck at curb/ 8:00am to 4:00pm
Date:  October 8, 2015

Client: Equity Office | Permit type: Street occupancy permit | Expiration date: October 20, 2015 | Permit id: Occu-527447 | Parcel: 0304408000
2015/10/080951 High St Boston Ma
Burning &; welding of structural steel for deck framing (dpl) how many torches will be used bfd paid detail required bfd paid detail required
Date:  August 20, 2015

Client: Equity Office | Permit type: Bfd cutting-burning-welding | Permit id: Cbw507500 | Parcel: 0304408000
2015/08/200951 High St Boston Ma
SCORE
82
Office renovation on the 28th floor to include: selective demolition of non-load bearing partitions millwork flooring ceiling painting etc. Renovation also includes new mep systems (i. E. Plumbing hvac electrical fire alarm etc.).
Date:  March 17, 2016
Value:   $328,000
Contractor: Janaina Licata

Client: Spus7 High St Lp | Permit type: Long form/alteration permit | Expiration date: September 17, 2016 | Current use: Comm | Permit id: Alt563836 | Parcel: 0304408000
2016/03/17328000821 High St Boston MaJanaina Licata
SCORE
99
Renovation of the 13th and 14th floor for the hospital
Date:  October 17, 2016
Value:   $29,500
Contractor: John Cannistraro

Client: Spus7 High St Lp | Permit type: Plumbing permit | Expiration date: April 17, 2017 | Current use: Mixed | Permit id: Pl647861 | Parcel: 0304408000
2016/10/1729500991 High St Boston MaJohn Cannistraro
SCORE
100
Low voltage permit for informatica at 1 high st
Date:  March 22, 2016
Value:   $2,500
Contractor: Julie Colantoni

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: September 22, 2016 | Current use: Comm | Permit id: Elv572433 | Parcel: 0304408000
2016/03/2225001001 High St Boston MaJulie Colantoni
SCORE
89
1 voice data renovations zurich 1 high street job number 16-0422-10
Date:  September 26, 2016
Value:   $20,000
Contractor: Joseph Bodio

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: March 26, 2017 | Current use: Comm | Permit id: Elv639459 | Parcel: 0304408000
2016/09/2620000891 High St Boston MaJoseph Bodio
SCORE
100
Temporary bagging of smoke detectors
Date:  September 26, 2016
Contractor: Michele Engber

Client: Spus7 High St Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd639828 | Parcel: 0304408000
2016/09/2601001 High St Boston MaMichele Engber
SCORE
100
Interior renovations including painting ceilings flooring walls.
Date:  September 26, 2016
Contractor: Michele Engber

Client: Spus7 High St Lp | Permit type: Bfd construction demo reno | Permit id: Fdc639827 | Parcel: 0304408000
2016/09/2601001 High St Boston MaMichele Engber
SCORE
100
S16-989 office workstation wiring for fragomen tenant space on 2nd and 5th floor.
Date:  September 28, 2016
Value:   $750
Contractor: John Omahony

Client: Spus7 High St Lp | Permit type: Electrical permit | Expiration date: March 28, 2017 | Current use: Comm | Permit id: E635844 | Parcel: 0304408000
2016/09/287501001 High St Boston MaJohn Omahony
SCORE
82
Furnish and install data network system furnish and install 2 door card access system
Date:  March 29, 2016
Value:   $15,000
Contractor: Joseph Vaccari

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: September 29, 2016 | Current use: Comm | Permit id: Elv573228 | Parcel: 0304408000
2016/03/2915000821 High St Boston MaJoseph Vaccari
SCORE
71
New carpet paint renovating existing office;with new workstations
Date:  January 14, 2016
Value:   $155,000
Contractor: Brian Keenan

Client: Spus7 High St Lp | Permit type: Long form/alteration permit | Expiration date: July 14, 2016 | Current use: Comm | Permit id: Alt551046 | Parcel: 0304408000
2016/01/14155000711 High St Boston MaBrian Keenan
SCORE
94
Testing and maintenance of the electrical distribution equipment
Date:  October 5, 2016
Value:   $10,000
Contractor: Tom Mcdonald

Client: Spus7 High St Lp | Permit type: Electrical permit | Expiration date: April 5, 2017 | Current use: Comm | Permit id: E644227 | Parcel: 0304408000
2016/10/0510000941 High St Boston MaTom Mcdonald
SCORE
94
Pantry renovation
Date:  April 7, 2016
Value:   $4,000
Contractor: David Mccarthy

Client: Spus7 High St Lp | Permit type: Plumbing permit | Expiration date: October 7, 2016 | Current use: Comm | Permit id: Pl573720 | Parcel: 0304408000
2016/04/074000941 High St Boston MaDavid Mccarthy
SCORE
82
Job #12375 zurich floors 13 14 renovation floors 13 14
Date:  October 6, 2016
Value:   $3,000
Contractor: Kristin Emond

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: April 6, 2017 | Current use: Comm | Permit id: Elv642245 | Parcel: 0304408000
2016/10/063000821 High St Boston MaKristin Emond
SCORE
100
Interior renovations to include partition modifications creation of pantry and mothers rooms minor fire protection relocation and hvac mods - new common corridor - 13 and 14 floors - zurich north america.
Date:  October 6, 2016
Value:   $399,855
Contractor: Michele Engber

Client: Spus7 High St Lp | Permit type: Long form/alteration permit | Expiration date: April 6, 2017 | Current use: Comm | Permit id: Alt639829 | Parcel: 0304408000
2016/10/063998551001 High St Boston MaMichele Engber
SCORE
82
Job #12375 zurich floors 13 14 renovation floors 13 14
Date:  October 7, 2016
Value:   $15,000
Contractor: Kristin Emond

Client: Spus7 High St Lp | Permit type: Electrical fire alarms | Expiration date: April 7, 2017 | Current use: Comm | Permit id: Efa642241 | Parcel: 0304408000
2016/10/0715000821 High St Boston MaKristin Emond
SCORE
95
Job #12375 zurich- floors 13 14 renovation floors 13 14
Date:  October 12, 2016
Value:   $75,000
Contractor: Brian Murphy

Client: Spus7 High St Lp | Permit type: Electrical permit | Expiration date: April 12, 2017 | Current use: Comm | Permit id: E642235 | Parcel: 0304408000
2016/10/1275000951 High St Boston MaBrian Murphy
SCORE
82
Work on the 12th floor at 1 high consists of; re-working existing drywall framing to accommodate new office layout. Installing new finishes (i. E. Flooring ceilings millwork paint etc.). Re-working and adding new mep systems (i. E. Electrical fire alarm mechanical etc.)
Date:  April 20, 2016
Value:   $162,416
Contractor: Matthew Santapaula

Client: Spus7 High St Lp | Permit type: Long form/alteration permit | Expiration date: October 20, 2016 | Current use: Comm | Permit id: Alt577467 | Parcel: 0304408000
2016/04/20162416821 High St Boston MaMatthew Santapaula
SCORE
100
Allied minds - 28th floor misc. Low voltage hvac control wiring - ap 163303
Date:  April 20, 2016
Value:   $12,500
Contractor: Paul Guarracino

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: October 20, 2016 | Current use: Comm | Permit id: Elv581582 | Parcel: 0304408000
2016/04/20125001001 High St Boston MaPaul Guarracino
SCORE
97
Remodel of existing suite
Date:  July 24, 2015
Value:   $67,000
Contractor: Robert Mckenna

Client: Spus7 High St Lp | Permit type: Electrical permit | Expiration date: January 24, 2016 | Current use: Comm | Permit id: E496149 | Parcel: 0304408000
2015/07/2467000971 High St Boston MaRobert Mckenna
SCORE
100
Change occupancy to include school 12 th floor construct conference and training center new walls flooring ceilings modify existing hvac electical plmb fa fp . 12th floor
Date:  May 2, 2016
Value:   $600,000
Contractor: Paul Mcdonald

Client: Spus7 High St Lp | Permit type: Long form/alteration permit | Expiration date: November 2, 2016 | Current use: Comm | Permit id: Alt565252 | Parcel: 0304408000
2016/05/026000001001 High St Boston MaPaul Mcdonald
SCORE
82
Relocate sprinklers on level 13 and level 14 due to architectural renovations per nfpa 13 and 7 cmr requirements.
Date:  November 2, 2016
Contractor: Dean Allaire

Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk651031 | Parcel: 0304408000
2016/11/020821 High St Boston MaDean Allaire
SCORE
99
Soft soldering to connect copper waste pipe to a new sink (dpl) bfd paid detail required
Date:  November 3, 2016
Contractor: John Cannistraro

Client: Spus7 High St Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw650176 | Parcel: 0304408000
2016/11/030991 High St Boston MaJohn Cannistraro
SCORE
82
Lighting & power for tenant fit-out babson entrepreneurial spaces on the 1st & 12th floor. New 30kva transformer & sub-panel being added on 12th floor fit-out. Fixtures outlets & switches
Date:  May 9, 2016
Value:   $225,000
Contractor: Dave Winn

Client: Spus7 High St Lp | Permit type: Electrical permit | Expiration date: November 9, 2016 | Current use: Comm | Permit id: E588374 | Parcel: 0304408000
2016/05/09225000821 High St Boston MaDave Winn
SCORE
82
Extention of existing fa system slc detection & av loop relocation and addition of new fa audible devices. Based on revised floor plans on 1st floor & 12th floor babson tenant fit-out spaces.
Date:  May 9, 2016
Value:   $10,250
Contractor: Dave Winn

Client: Spus7 High St Lp | Permit type: Electrical fire alarms | Expiration date: November 9, 2016 | Current use: Comm | Permit id: Efa588346 | Parcel: 0304408000
2016/05/0910250821 High St Boston MaDave Winn
Demolition renovations of existing space to include drywall ceilings painting and flooring (secure any floor openings)
Date:  March 24, 2010

Client: Spus7 High St Lp | Permit type: Bfd construction demo reno | Permit id: Fdc18473 | Parcel: 0304408000
2010/03/240951 High St Boston Ma
Temporary bagging of smoke detectors
Date:  March 1, 2016

Client: Spus7 High St Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd565398 | Parcel: 0304408000
2016/03/010951 High St Boston Ma
Stand eye vision truck at curb 7am-5pm
Date:  August 14, 2015

Client: Spus7 High St Lp | Permit type: Street occupancy permit | Expiration date: August 25, 2015 | Permit id: Occu-506663 | Parcel: 0304408000
2015/08/140951 High St Boston Ma
Minor renovation of daintree space on 11th floor install (5) new speaker strobes (1) new strobe only (1) new speaker strobe on existing wiring (2) new strobe only on existing wiring (1) new smoke detector on existing wiring
Date:  February 26, 2016

Client: Spus7 High St Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf554441 | Parcel: 0304408000
2016/02/260951 High St Boston Ma
Temporary bagging of smoke detectors for dust control during cutting burning welding
Date:  February 28, 2014

Client: Spus7 High St Lp | Permit type: Bfd bag smoke detectors | Permit id: Bsd326936 | Parcel: 0304408000
2014/02/280951 High St Boston Ma
Bfd chemist certificate proces
Date:  March 15, 2016

Client: Spus7 High St Lp | Permit id: Chm565027 | Parcel: 0304408000
2016/03/150951 High St Boston Ma
SCORE
100
Low voltage wiring 1 high st marcus and millichap 10th fl
Date:  June 17, 2013
Value:   $15,000
Contractor: Julie Colantoni

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: December 17, 2013 | Current use: Comm | Permit id: Elv253072 | Parcel: 0304408000
2013/06/17150001001 High St Boston MaJulie Colantoni
SCORE
82
All sprinkler impairment work shall be coordinated with the building impairment coordinator 1-officer &; 3-firefighters with pump required bfd paid detail required
Date:  May 27, 2016

Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk538451 | Parcel: 0304408000
2016/05/270821 High St Boston MaPan Simplexgrinnell
Installation of a new 11 2 inch pre-action system feeding (4) sprinkler heads in the computer room on the 22nd floor. Work to be done per 7 cmr. One floor zone at a time.
Date:  November 21, 2011

Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk100428 | Parcel: 0304408000
2011/11/210951 High St Boston Ma
Install; x 2; conduit in brick sdwk and rdwy; ; installing handhole at curb;2x2;rdwy; ; boston police area a; 343-4239; ; work hours; 7 pm to 6 am; ; street to be posted both sides;
Date:  August 1, 2016

Client: Spus7 High St Lp | Permit type: Excavation permit | Expiration date: August 10, 2016 | Permit id: Exca-619172 | Parcel: 0304408000
2016/08/010951 High St Boston Ma
SCORE
100
Fragomen 2nd and 5th floors misc. Low voltage hvac control wiring - ap 163694
Date:  September 1, 2016
Value:   $4,950
Contractor: Paul Guarracino

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: March 1, 2017 | Current use: Comm | Permit id: Elv627532 | Parcel: 0304408000
2016/09/0149501001 High St Boston MaPaul Guarracino
SCORE
100
Network wiring for tro on the 18th floor
Date:  February 9, 2016
Value:   $2,900
Contractor: Kevin Flaherty

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: August 9, 2016 | Current use: Comm | Permit id: Elv561111 | Parcel: 0304408000
2016/02/0929001001 High St Boston MaKevin Flaherty
SCORE
69
Fragomen worldwide -; 2nd &; 5th floors -; expansion and office;fit-out of a new space for existing building tenant.; work includes :; expansion of existing 2nd floor space and a new suite on the 5th floor of the building.; all new act carpeting tile and finish carpentry.; modifications to existing mep systems.; modifications to existing fire alarm; and sprinkler systems.
Date:  July 25, 2016
Value:   $627,620

Client: Spus7 High St Lp | Permit type: Long form/alteration permit | Expiration date: January 25, 2017 | Current use: Comm | Permit id: Alt608268 | Parcel: 0304408000
2016/07/25627620691 High St Boston MaGeetanjali Ningappa
SCORE
93
Office bldg daycare restaurant 36a stores garage shed ancillroy uses common areas doc#at449057 certificate of occupancy for the;7th floor office(s) ;alt535499 issued: 11 13 15
Date:  February 24, 2016
Value:   $2,073,213
Contractor: Matt Santapaula

Client: Spus7 High St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo563959 | Parcel: 0304408000
2016/02/242073213931 High St Boston MaMatt Santapaula
SCORE
82
Install 2 new access control system with 7 card readers
Date:  June 3, 2016
Value:   $9,000
Contractor: Bruce Conley

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: December 3, 2016 | Current use: Comm | Permit id: Elv597347 | Parcel: 0304408000
2016/06/039000821 High St Boston MaBruce Conley
SCORE
100
Low voltage permit for placester at 1 high st
Date:  November 20, 2015
Value:   $60,000
Contractor: Julie Colantoni

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: May 20, 2016 | Current use: Comm | Permit id: Elv540449 | Parcel: 0304408000
2015/11/20600001001 High St Boston MaJulie Colantoni
Burning welding for installation of new structural steel (dpl- 7 16 10) bfd paid detail required
Date:  May 24, 2010

Client: Spus7 High St Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw26387 | Parcel: 0304408000
2010/05/240951 High St Boston Ma
Demolition renovation to existing office space to include drywall flooring and ceilings
Date:  July 23, 2010

Client: Spus7 High St Lp | Permit type: Bfd construction demo reno | Permit id: Fdc34250 | Parcel: 0304408000
2010/07/230951 High St Boston Ma
SCORE
82
Offices daycare restaurant 36a stores garage shed ancillary uses common areas certificate for offices (28th floor) alt563836 issued 3 17 2016 &; sf567899 issued 3 3 2016
Date:  June 7, 2016
Value:   $344,050
Contractor: Janaina Licata

Client: Spus7 High St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo596534 | Parcel: 0304408000
2016/06/07344050821 High St Boston MaJanaina Licata
SCORE
100
Low voltage wiring addison group
Date:  February 28, 2014
Value:   $14,000
Contractor: Julie Colantoni

Client: Spus7 High St Lp | Permit type: Electrical low voltage | Expiration date: August 28, 2014 | Current use: Comm | Permit id: Elv338992 | Parcel: 0304408000
2014/02/28140001001 High St Boston MaJulie Colantoni
Demolition renovations to existing office space to include drywall paint ceiling and flooring (secure any floor openings)
Date:  September 12, 2011

Client: Spus7 High St Lp | Permit type: Bfd construction demo reno | Permit id: Fdc95009 | Parcel: 0304408000
2011/09/120951 High St Boston Ma
SCORE
82
Office renovation on the 28th floor to include: selective demolition of non-load bearing partitions millwork ceilings flooring painting new drywall non-load bearing partitions etc.
Date:  February 22, 2016
Contractor: Janaina Licata

Client: Spus7 High St Lp | Permit type: Bfd construction demo reno | Permit id: Fdc563850 | Parcel: 0304408000
2016/02/220821 High St Boston MaJanaina Licata
Cutting &; welding for modifications repairs to the base bldg piping &; mechanical systems (dpl) bfd paid detail required
Date:  December 31, 2012

Client: Spus7 High St Lp | Permit type: Bfd cutting-burning-welding | Permit id: Cbw209109 | Parcel: 0304408000
2012/12/310951 High St Boston Ma
Stand truck at curb 8:00am to 4:00pm
Date:  May 4, 2016

Client: Spus7 High St Lp | Permit type: Street occupancy permit | Expiration date: May 12, 2016 | Permit id: Occu-527447 | Parcel: 0304408000
2016/05/040951 High St Boston Ma
Special effects for the production performances of "black mass"-interior office sequences-fbi headquarters product name: look solutions fog haze fluid bfd paid detail required
Date:  July 15, 2014

Client: Spus7 High St Lp | Permit type: Bfd general permit | Permit id: Gp383991 | Parcel: 0304408000
2014/07/150951 High St Boston Ma
Minor renovation to existing office space on 5th floor &; f ;a upgrade; ~; doc# 20141076
Date:  August 18, 2014

Client: Spus7 High St Lp | Permit type: Bfd fire alarm installations | Permit id: Bfdf391994 | Parcel: 0304408000
2014/08/180951 High St Boston Ma
SCORE
82
Office building daycare restaurant 36a stores garage shed ancillary uses common areas coo for offices (27th floor) alt532769 issued 11/4/2015 &; sf530825 issued 10/20/2015
Date:  January 27, 2016
Value:   $1,299,937
Contractor: Janaina Licata

Client: Spus7 High St Lp | Permit type: Certificate of occupancy | Current use: Comm | Permit id: Coo557023 | Parcel: 0304408000
2016/01/271299937821 High St Boston MaJanaina Licata
Relocate 78 sprinkler heads to nfpa-13 code. Work per nfpa stands 7 cmr. One floor zone at a time.
Date:  August 18, 2016

Client: Spus7 High St Lp | Permit type: Bfd sprinkler system | Permit id: Sprk621745 | Parcel: 0304408000
2016/08/180951 High St Boston Ma
BEST LOCAL CONTRACTORS




Contractor Rank Contractor Details Number of Projects Avg. Project Cost Years in Business Photos
Need a Contractor ?
Just fill out a form below and get several free quotes from best local contractors in your area.