Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 56 15 P St Nw, Washington, Dc 20005 Carnegies 16th street steps are in need of restoration. Contractors have proposed removing and replacing mortar joints throughout the stairs to include the top landing, top stair case, middle landing, middle stair case, first landing and first stair case. In addition to repointing, they have proposed replacing 85 of the damaged stones with stones similar to the existing stones. The stones in good condition would be left untouched. The goal of the project is to restore the steps to the way they looked when originally built. Date: June 16, 2014 Contractor: Alexis Fleming Client: Carnegie Institution Of Washington | Permit type: Alteration and repair | Permit status: Permit issued | Permit id: B1408613 |