Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 65 Office remodel on the mezzanine level of the conference center. We are reducing occupancy and not changing use. Permit status: In for review | Permit id: Bld2016-04568 | |||||
SCORE 100 (low voltage)detection & controls for organ pipe spaces pre-action fire sprinkler system Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03971 | |||||
SCORE 99 Lds church conference center- covering the organ pipe space with a double interlock pre-action system. Project has been designed by pci (greg jones). We will be installing this system only. They have asked us to submit this since we will be the installer. Permit type: Fire | Permit status: Inspections | Permit id: Bld2016-03181 | |||||
SCORE 100 (low voltage)detection & controls for organ pipe spaces pre-action fire sprinkler system Permit type: Low voltage | Permit status: Inspections | Permit id: Bld2016-03971 | |||||
SCORE 56 Office remodel on the mezzanine level of the conference center. We are reducing occupancy and not changing use. Permit status: In for review | Permit id: Bld2016-04568 |