Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demolition or move p Permit status: Finaled | Completion date: April 23, 2014 | Current use: Single family dwelling | Permit id: 655175 | |||||
Electrical permit Permit status: Finaled | Completion date: June 30, 2004 | Current use: Single family dwelling | Permit id: 340365 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Completion date: September 11, 2014 | Current use: Single family dwelling | Permit id: 671497 | |||||
New residential - heating/cooling equipment & ductwork Permit type: Mechanical permit | Permit status: Finaled | Completion date: September 11, 2014 | Current use: Single family dwelling | Permit id: 672034 | |||||
Building residential Permit status: Finaled | Completion date: June 30, 2004 | Current use: Single family dwelling | Permit id: 327841 | |||||
Alter door and alter closet and change windows to smaller size, change wall Permit type: Building residential | Permit status: Finaled | Completion date: June 30, 2004 | Current use: Single family dwelling | Permit id: 335692 | |||||
Demolition/rebuild revision submitted 5/13/14 - site change only (emc) Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 655173 | |||||
Electrical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 652788 | |||||
Boreand install riser and cable to provide 400amp underground service to new home in accordance with pepco plan no. 3439354. Work shall comply with montgomery county specifications for utility construction permit and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit . All lane closures/traffic controls shall comply with the mcdot approved traffic control plans. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 309690 | |||||
Install gas service in accordance with washington gas plan no. 264373. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Permit type: Public right of way | Permit status: Finaled | Current use: Driveway | Permit id: 304167 |