Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Use property as sfd Permit id: Use2009-02844 | |||||
Running new waterlines drain lines and vents. Installing 2 tubs 3 vanities 3 toilets 1 kitchen sink washing machine hook up. Run new gas line and connect stove and furnace. Work done to code. Permit id: Com2009-06482 | |||||
Install 25 new circuits install low voltage as per code. Permit id: Com2009-06392 | |||||
Install 0 btu gas furnace w/4 ton a/c. Install all ducting to condition living area. Work done to code. Permit id: Com2009-05652 | |||||
Permit id: Com2009-05517 | |||||
Category 1 demo; non structrual demolition insulation drywall paint new doors and windows new kitchen cabinets and bathrooms new flooring finish trim. Work done to code. Permit id: Com2009-04908 | |||||
Construct a two story rear addition and third story addition with rear balcony and rooftop deck. Excavate and pave basement for utilities. Per bmza 210-08 approve on 4-1-08 as per plan as per code. Separate perit will be rquired for electrical mechanical Permit id: Com2008-17782 | |||||
Clean brick with water only and repoint brick. No scaffold using a ladder. Remove existing concrete flatwork and pour new concrete. Erect 6 fencing approx. Linear ft. Install windows and doors non structural work. Complete framing and install insul Permit id: Com2008-10542 | |||||
Exterior masonry repair point up work and front wall. As per code. Permit id: Com2007-22473 | |||||
Install one 2 1/2 ton gas furnace with air conditioning and ductwork. Permit id: Com2005-10062 | |||||
Demo all interior walls and ceilings and cabinets trim. No structural is being done. Permit id: Com2005-07754 | |||||
Reframe interior drywall windows doors floors trim Permit id: Com2005-05654 | |||||
Clean brick with water only and repoint brick. No scaffold using a ladder. Remove existing concrete flatwork and pour new concrete. Erect 6 fencing approx. Linear ft. Install windows and doors non structural work. Complete framing and install insulation and drywall. Prime and top coat paint. Install cabinets carpentry trim and new flooring. Note: no chemcial cleaning. No lead paint removal. No formstone removal. If needed separate permit is required with mhic contractor listed. Expiration date: October 16, 2008 | Permit id: Com2008-10542 | |||||
Construct a two story rear addition and third story addition with rear balcony and rooftop deck. Excavate and pave basement for utilities. Per bmza 210-08 approve on 4-1-08 as per plan as per code. Separate perit will be rquired for electrical mechanical and plumbing work. Expiration date: July 31, 2009 | Permit id: Com2008-17782 | |||||
Install 0 btu gas furnace w 4 ton a c. Install all ducting to condition living area. Work done to code. Expiration date: September 12, 2009 | Permit id: Com2009-05652 | |||||
Install one 2 1 2 ton gas furnace with air conditioning and ductwork. Expiration date: October 12, 2005 | Permit id: Com2005-10062 |