Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
House drain connection to row: connect a yard inlet drain pipe into county sd facility. Drain pipe will be connected into the county storm drain structure or pipe as directed by the dps inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 271561 | |||||
Electrical permit Permit status: Finaled | Completion date: January 24, 2014 | Current use: Single family dwelling | Permit id: 659092 | |||||
Mechanical permit Permit status: Finaled | Current use: Single family dwelling | Permit id: 488416 | |||||
Interior alterations Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 658985 |