Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Demo Permit type: Demolition or move p | Permit status: Completed | Completion date: March 18, 2015 | Current use: Single family dwelling | Permit id: 654361 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Completion date: December 26, 2014 | Current use: Single family dwelling | Permit id: 677329 | |||||
Low voltage for security devices Permit type: Electrical permit | Permit status: Finaled | Completion date: March 16, 2015 | Current use: Multi-family dwelling | Permit id: 680955 | |||||
Mechanical permit Permit status: Finaled | Completion date: December 26, 2014 | Current use: Single family dwelling | Permit id: 674744 | |||||
Underground tank Permit type: Mechanical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 699821 | |||||
Rebuild Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 656883 | |||||
Existing residential - amp temp pole service Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 650379 | |||||
Heavy -up overhead transformer,install cable and associated equipment in accordance with pepco plan no. 3460883. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 323641 |