Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical revision submitted on 3/28/2012/no additional construction cost Permit type: Commercial building | Permit status: Issued | Current use: Place of worship | Permit id: 535158 | |||||
New handicap ramp intermediate plan track Permit type: Commercial building | Permit status: Issued | Current use: Place of worship | Permit id: 553660 | |||||
Mechanical permit Permit status: Finaled | Completion date: September 8, 2012 | Current use: Business building | Permit id: 598938 | |||||
Underground propane tank / fire marhsal permit 2012021975 Permit type: Mechanical permit | Permit status: Finaled | Completion date: June 11, 2013 | Current use: Place of worship | Permit id: 601412 | |||||
Exact replacement Permit type: Mechanical permit | Permit status: Finaled | Completion date: February 10, 2014 | Current use: Business building | Permit id: 625836 | |||||
Gaithersburg church of the nazarene-ap #535158 u&o #265301 addition w/new 1200amp service,3rtu 2-84hp 1-42hp,3cu 1-17hp 2-6hp, mua 35hp,7 fractional ef Permit type: Electrical permit | Permit status: Issued | Current use: Place of worship | Permit id: 550943 | |||||
Mechanical permit Permit status: Finaled | Current use: Business building | Permit id: 587886 | |||||
Excavate and compact roadway for water connections in accordance with approved plans and wssc plans and specification. Work shall comply with the current montgomery county specifications for utility construction permit. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps inspector. Construct sidewalk per approved plan. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps inspector. Pre-construction meeting is required. Contact adam curtin at 301-370-3688 before and after installation. Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 269637 | |||||
Public row (restoration): complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Work shall be completed as directed by the dps row inspector. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 269450 | |||||
Replace (2) poles & cross arms. Install 25kva overhead transformer. Transfer overhead wire and associated equipmentin accordance with pepco plan no. 3497718. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 351087 |