Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Use premises as a single family dwelling Permit id: Use2008-04640 | |||||
Install 3 1/2 ton air cond. Unit 0 btu with ductwork run gas to 1 0 btu furnace. Work as per code Permit id: Com2008-10379 | |||||
Rewiring whole house upgrade service 2 amp asper code. Permit id: Com2008-08962 | |||||
Kitchen cabinets wood floors tile replace windows. Install 2x4 n/b walls in bath- kit reframe some n/b walls interior drywall carpet paint doors. Elec-mech-plumb. On seperate permit. Work as per code. (per planning; new windows must fit in the ex Permit id: Com2008-08598 | |||||
Reconstruct waste& water for 12 fixtures run gas to stoe and furnace as per code Permit id: Com2008-08197 | |||||
Kitchen cabinets wood floors tile replace windows. Install 2x4 n/b walls in bath- kit reframe some n/b walls interior drywall carpet paint doors. Elec-mech-plumb. On seperate permit. Work as per code. (per planning; new windows must fit in the existing openings.) Expiration date: September 28, 2008 | Permit id: Com2008-08598 | |||||
Install 3 1 2 ton air cond. Unit 0 btu with ductwork run gas to 1 0 btu furnace. Work as per code Expiration date: October 15, 2008 | Permit id: Com2008-10379 | |||||
Kitchen cabinets wood floors tile replace windows. Install 2x4 n b walls in bath- kit reframe some n b walls interior drywall carpet paint doors. Elec-mech-plumb. On seperate permit. Work as per code. (per planning; new windows must fit in the existing openings.) Expiration date: September 28, 2008 | Permit id: Com2008-08598 |