Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Permit id: Com2015-03374 | |||||
Amend permit# com2014-41819 issued on 11/26/14 with plans# 2014-2336 to add low voltage contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entr Permit id: Com2015-00094 | |||||
Original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Permit id: Com2014-44369 | |||||
Amend permit# com2014-41819 issued on 11/26/14 with plans# 2014-2336 to add electrical contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry Permit id: Com2014-43761 | |||||
Amend permit# com2014-41819 issued on 11/26/14 with plans# 2014-2336 to add prime contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry ante Permit id: Com2014-43763 | |||||
Nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air nat Permit id: Com2014-41819 | |||||
Original permit description:(com2014-02720)interior demo and alterations of existing space (room 120) of the steif building for office and engineering research per plans and per code. Separate permits are required for sprinkler and fire alarm systems alt Permit id: Com2014-06638 | |||||
Amend permit# com2014-027 issued on 03/06/14 with plans# 2014-271 to add plumbing gas and hvac contractor as listed above original permit description:(com2014-02720)interior demo and alterations of existing space (room 120) of the steif building for of Permit id: Com2014-05963 | |||||
Interior demo and alterations of existing space (room 120) of the steif building for office and engineering research per plans and per code. Separate permits are required for sprinkler and fire alarm systems alterations. Permit id: Com2014-02720 | |||||
"add 8 sprinkler heads for tenant fitout - largest pipe size 1/4"" as per code." Permit id: Com2014-03708 | |||||
"amend permit com2009-17971 issued on 08/11/09 with plans #2009-1058 to add plumbing contractor as listed above. Original permit description:(com2009-17971)alteration of existing single occupant office - 12-6""x13-0"". Install dishwasher at existing kitch" Permit id: Com2009-20235 | |||||
"amend permit com2009-17971 issued on 8/11/09 to add contractororiginal permit description:(com2009-17971)alteration of existing single occupant office - 12-6""x13-0"". Install dishwasher at existing kitchen as per plans & as per code." Permit id: Com2009-19580 | |||||
"alteration of existing single occupant office - 12-6""x13-0"". Install dishwasher at existing kitchen as per plans & as per code." Permit id: Com2009-17971 | |||||
Install (3) sets welded man bars in existing ductwork. Install (2) sheetmetal return air transfer ducts as per code. Permit id: Com2008-28223 | |||||
"relocates 12 & add 8 heads per light haz max spacing 196 largest pipes size 1/4"" work to be on 3rd floor. As per code." Permit id: Com2007-17862 | |||||
Relocate 9 sprinkler heads add 7 seven sprinklers for new ground froor tentant Permit id: Com2002-09302 | |||||
Relocate 5 sprinkler heads add 4 sprinklers foe new wave tank lab Permit id: Com2002-09304 | |||||
Permit id: Com2002-08988 | |||||
Amend permit # com2002-06439 to name plumbing & heating contractor Permit id: Com2002-08993 | |||||
Amend permit no. Com2002-054 to name plumber robert sommerman and hvacr contractor william d. Bray Permit id: Com2002-06675 | |||||
Naming electrical contractor Permit id: Com2002-06238 | |||||
Install 102 data locations. Permit id: Com2002-05873 | |||||
Tenant improvements-modify interior space for new offices per plans. Separate permit required for sprinkler system. Permit id: Com2002-05410 | |||||
Install 8 circuits for equiptments. Permit id: Com2002-03630 | |||||
Furnish and install one s/f illum letter sign reading john hopkins/university 56 high x 1 wide 60. 5 sq ft. Installed on masonry bldg front as per drawings Permit id: Com2002-03352 | |||||
Erect lab and classroom space for johns hopkins university to study the effects of water erosion on the coastline 25 total sq feet 1st floor as per plans . C/o required on a seperate form upon completion per bmza 340-99x approved 10/12/99 . Seper Permit id: Com2002-01374 | |||||
Alteration of existing single occupant office - 12-6"x13-0". Install dishwasher at existing kitchen as per plans & as per code. Expiration date: February 11, 2010 | Permit id: Com2009-17971 | |||||
Amend permit com2009-17971 issued on 8/11/09 to add contractororiginal permit description:(com2009-17971)alteration of existing single occupant office - 12-6"x13-0". Install dishwasher at existing kitchen as per plans & as per code. Expiration date: February 11, 2010 | Permit id: Com2009-19580 | |||||
Amend permit com2009-17971 issued on 08/11/09 with plans #2009-1058 to add plumbing contractor as listed above. Original permit description:(com2009-17971)alteration of existing single occupant office - 12-6"x13-0". Install dishwasher at existing kitchen as per plans & as per code. Expiration date: February 11, 2010 | Permit id: Com2009-20235 | |||||
Relocates 12 & add 8 heads per light haz max spacing 196 largest pipes size 1/4 work to be on 3rd floor. As per code." Expiration date: December 7, 2007 | Permit id: Com2007-17862 | |||||
Original permit description:(com2014-02720)interior demo and alterations of existing space (room 120) of the steif building for office and engineering research per plans and per code. Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: March 6, 2015 | Permit id: Com2014-06638 | |||||
Add 8 sprinkler heads for tenant fitout - largest pipe size 1/4" as per code. Expiration date: August 26, 2014 | Permit id: Com2014-03708 | |||||
Amend permit# com2014-027 issued on 03/06/14 with plans# 2014-271 to add plumbing gas and hvac contractor as listed above original permit description:(com2014-02720)interior demo and alterations of existing space (room 120) of the steif building for office and engineering research per plans and per code. Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: September 27, 2014 | Permit id: Com2014-05963 | |||||
Nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2014-41819 | |||||
Amend permit# com2014-41819 issued on 11/26/14 with plans# 2014-2336 to add electrical contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2014-43761 | |||||
Amend permit# com2014-41819 issued on 11/26/14 with plans# 2014-2336 to add prime contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2014-43763 | |||||
Original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2014-44369 | |||||
Original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2015-03374 | |||||
Amend permit# com2014-41819 issued on 11/26/14 with plans# 2014-2336 to add low voltage contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2015-00094 | |||||
Erect lab and classroom space for johns hopkins university to study the effects of water erosion on the coastline 25 total sq feet 1st floor as per plans . C/o required on a seperate form upon completion per bmza 340-99x approved 10/12/99 . Seperate permit will be required for sprinkler system. Expiration date: November 9, 2002 | Permit id: Com2002-01374 | |||||
Water flume lab to include hvac sprinkler plumbing electrical drywall paritions concreete trenches painting of floors walls nand ceilings cost of work without mech plumbing electrical is 148 5 mech 75 0 electrical 39 0 as per plans. Separate permit will be required for sprinkler system. Expiration date: June 20, 2003 | Permit id: Com2002-17828 | |||||
(use) portion of the ground floor for a water flume laboratory. Permit id: Com2003-19467 | |||||
593 sf of office spacae & 1807 s. F. Of process applicace facility=24 g. S. F. Tenant renovation at interior only as per plans. Separate permit is required for sprinkler system and fire alarm. Separate permit required for the spray room. Expiration date: September 30, 2004 | Permit id: Com2003-34140 | |||||
Add data outlets Expiration date: April 3, 2004 | Permit id: Com2003-38368 | |||||
Amend permit#com2003-341 issued on 9-25-03 with plans#2003-1024 to name electrical contractor as stated above. Expiration date: April 6, 2004 | Permit id: Com2003-38494 | |||||
Relocate 8 and add 1 sprinkler to accomodate new tenant renovation largest pipe size 1 Expiration date: May 4, 2004 | Permit id: Com2003-40820 | |||||
Add (1) sprinklers relocate (2) sprinklers as per code. Expiration date: March 30, 2017 | Permit id: Com2016-25183 | |||||
Amend permit: add contractor .(original permit:com2016-11976:interior renovations to the existing lower level restrooms as per plans as per code. Separate permit required for sprinkler system and fire alarm.)original permit description:(com2016-11976)interior renovations to the existing lower level restrooms as per plans as per code. Separate permit required for sprinkler system and fire alarm. Expiration date: January 29, 2017 | Permit id: Com2016-19976 | |||||
Interior renovations to the existing lower level restrooms as per plans as per code. Separate permit required for sprinkler system and fire alarm. Expiration date: January 29, 2017 | Permit id: Com2016-11976 | |||||
Amend permit: add plumbing contractor .(original permit:com2016-11976:interior renovations to the existing lower level restrooms as per plans as per code. Separate permit required for sprinkler system and fire alarm.)original permit description:(com2016-11976)interior renovations to the existing lower level restrooms as per plans as per code. Separate permit required for sprinkler system and fire alarm. Expiration date: January 29, 2017 | Permit id: Com2016-20239 | |||||
Relocates 12 & add 8 heads per light haz max spacing 196 largest pipes size 1/4" work to be on 3rd floor. As per code. Expiration date: December 7, 2007 | Permit id: Com2007-17862 | |||||
Amend permit# com2014-41819 issued on 11 26 14 with plans# 2014-2336 to add electrical contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2014-43761 | |||||
Amend permit# com2014-41819 issued on 11 26 14 with plans# 2014-2336 to add prime contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2014-43763 | |||||
Amend permit# com2014-41819 issued on 11 26 14 with plans# 2014-2336 to add low voltage contractor as listed above original permit description:(com2014-41819) nterior renovation to reconfigure three existing labs into four separate lab spaces with an entry anteroom (interior furnishings to include steel casework epoxy counters knee spaces and sinks with eyewash. Mechanical work will reconfigure air natural gas and vacuum connections) provide ventilation for a new biological safety cabinet including a roof mounted exhaust fan. (electrical work will provide new wire mold with data outlets and miscellaneous connections for laboratory equipment. Finishes to include painted walls vct floor vinyl base salvaged and reconfigured ceiling grid and acoustical panel system salvaged and relocated lights) as per plans and as per oce. Expiration date: November 26, 2015 | Permit id: Com2015-00094 | |||||
Relocates 12 & add 8 heads per light haz max spacing 196 largest pipes size 1 4" work to be on 3rd floor. As per code. Expiration date: December 7, 2007 | Permit id: Com2007-17862 | |||||
Amend permit com2009-17971 issued on 8 11 09 to add contractororiginal permit description:(com2009-17971)alteration of existing single occupant office - 12-6"x13-0". Install dishwasher at existing kitchen as per plans & as per code. Expiration date: February 11, 2010 | Permit id: Com2009-19580 | |||||
Amend permit com2009-17971 issued on 08 11 09 with plans #2009-1058 to add plumbing contractor as listed above. Original permit description:(com2009-17971)alteration of existing single occupant office - 12-6"x13-0". Install dishwasher at existing kitchen as per plans & as per code. Expiration date: February 11, 2010 | Permit id: Com2009-20235 | |||||
Add 8 sprinkler heads for tenant fitout - largest pipe size 1 4" as per code. Expiration date: August 26, 2014 | Permit id: Com2014-03708 | |||||
Amend permit# com2014-027 issued on 03 06 14 with plans# 2014-271 to add plumbing gas and hvac contractor as listed above original permit description:(com2014-02720)interior demo and alterations of existing space (room 120) of the steif building for office and engineering research per plans and per code. Separate permits are required for sprinkler and fire alarm systems alterations. Expiration date: September 27, 2014 | Permit id: Com2014-05963 | |||||
Erect lab and classroom space for johns hopkins university to study the effects of water erosion on the coastline 25 total sq feet 1st floor as per plans . C o required on a seperate form upon completion per bmza 340-99x approved 10 12 99 . Seperate permit will be required for sprinkler system. Expiration date: November 9, 2002 | Permit id: Com2002-01374 | |||||
Furnish and install one s f illum letter sign reading john hopkins university 56 high x 1 wide 60. 5 sq ft. Installed on masonry bldg front as per drawings Expiration date: November 24, 2002 | Permit id: Com2002-03352 |