Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Permit id: 01-12-109 | Parcel: 010401005000 | |||||
Permit id: 00-02-069 | Parcel: 010402006000 | |||||
Permit id: 03-04-126 | Parcel: 010411002000 | |||||
Permit id: 10-10-058 | Parcel: 010401005000 | |||||
Permit id: 11-01-059 | Parcel: 010401005000 | |||||
Furnish & install fire hydrant Permit id: 01-3230 | |||||
Permit id: 80-3487 | |||||
Six above ground oil tanks. No further engineering review. Permit id: 03-0413 | Parcel: 010411002000 | |||||
SCORE 67 Expanded scope of work to install fire backflow per fire requirements. This scope of work has been completed per conversation with tom bacon. Remove center driveway and replace with vertical curb and gutter. Existing water meter, verify backflow device exist and meets current standards. Install sewer cleanout within row and replace 4" service with 6" line. New truck dock requires a sand oil interceptor, junction box and concrete. No geotech has been hired for this project. City-inspection will in Permit id: 10-0335 | Parcel: 010401005000 | |||||
Repair damaged backfloe device, test bf device and installation of bollards per detail 204. 2. All work within the right-of-way shall be constructed per state and federal accessibility standards. 3. A preconstruction meeting is required call (916) 617-4692. 4. All work shall comply with city standards and details. 5. Final engineering encroachment inspection is required. Any damage to the curb, gutter, sidewalk, tree or landscape will be repaired to normal condition or better. Permit id: 11-0227 | Parcel: 010411002000 |