Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Installation of gas water heater. Date: April 27, 2001 Contractor: T And K Mechanical Client: Guthrie | Permit type: Plumbing | Permit status: Closed | Permit id: Plm2001-00175 | |||||
Connect existing house to sewer service. Sewer reimbursement district #44 fee paid this date. Date: May 8, 2008 Client: Guthrie | Permit type: Sewer | Permit status: Closed | Permit id: Swr2008-00064 | |||||
SCORE 98 Conversion of oil to gas furnace, replacement of a c unit and associated gas piping. Placement of a c unit must comply with standard setbacks. Date: August 29, 2000 Contractor: Arrow Mechanical Client: Guthrie | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2000-00351 | |||||
SCORE 91 Connect existing house to sewer service. Septic tank is to be pumped and filled. Sewer reimbursement district #44 fee paid this date. Date: May 8, 2008 Contractor: Brian Clopton Excavating Inc Client: Guthrie | Permit type: Plumbing | Permit status: Closed | Permit id: Plm2008-00197 | |||||
SCORE 93 Installation of gas piping for exterior generator, water heater and gas fireplace insert. Generator cannot be placed within the required setbacks. Date: April 27, 2001 Contractor: T K Mechanical Client: Guthrie | Permit type: Mechanical | Permit status: Closed | Permit id: Mec2001-00137 | |||||
Installation of one branch circuit for transfer switch for ng generator. Date: April 24, 2001 Client: Guthrie | Permit type: Electrical | Permit status: Closed | Permit id: Elc2001-00210 |