Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Permit status: Finaled | Completion date: March 15, 2000 | Current use: Single family dwelling | Permit id: 213233 | |||||
Electrical permit Permit status: Issued | Current use: Single family dwelling | Permit id: 293949 | |||||
Building residential Permit status: Issued | Current use: Single family dwelling | Permit id: 287691 | |||||
Enclose portico Permit type: Building residential | Permit status: Issued | Current use: Single family dwelling | Permit id: 337808 | |||||
Revision - 1/18/12 - to add 2 amp heavy up Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 587620 | |||||
Homeowner obtained permit Permit type: Mechanical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 588305 | |||||
Adding bathroom and master bedroom- changing dinning room door Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 576274 | |||||
Under the pavement cut moratorium until 6/12/18. A full width 2 mill and overlayis requiredper the current county specifications for utility construction permit and as directed by the dps row inspector. Abandon gas service in accordance with washington gas plan no. 680262. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 354983 |