Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Commercial building Permit status: Issued | Current use: Retaining wall | Permit id: 614826 | |||||
Install 15 solar panels to existing sfd Permit type: Building residential permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 706121 | |||||
Relocate underground cable and associated equipment due to bike path constructionin accordance with pepco plan no. 3499036. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 350749 | |||||
Demo only bond # ps8a39512 Permit type: Demolition or move permit | Permit status: Completed | Current use: Single family dwelling | Permit id: 489428 | |||||
Shed - used for storage Permit type: Commercial building | Permit status: Finaled | Current use: Storage building | Permit id: 672405 | |||||
Electrical permit Permit status: Finaled | Current use: Business building | Permit id: 490532 | |||||
Aung residence Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 706801 | |||||
Mechanical permit Permit status: Issued | Current use: Single family dwelling | Permit id: 324130 | |||||
Remove existing driveway, replace with new driveway, add an 8" water house connection, a 4" sewer house connection, a 15" storm drain field connection, rip rap, and ditch grading, according to approved plans and montgomery county standards and specifications and the direction of the dps inspector. Contact dps inspector before construction begins. Permit type: Public right of way | Permit status: Completed | Current use: Public right-of-way | Permit id: 265941 | |||||
New place of worship revision- 10/10/11 - elec/mech/structural changes/ negative cost of construction / effected area 144 sqft Permit type: Commercial building | Permit status: Finaled | Current use: Place of worship | Permit id: 528013 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 749246 | |||||
Mechanical permit Permit status: Issued | Current use: Place of worship | Permit id: 584874 | |||||
Install gas service in accordance with washington gas plan no. 130977. Work shall comply with ada requirements, montgomery county specifications for utility construction permit and the direction of the dps inspector. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 270702 | |||||
Dw permit (residential) construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md dnr permit and mc dot highway serivces tree division permission
|