Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Alteration permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Active | Permit id: 682800 | |||||
Electrical permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Expired | Permit id: 671350 | |||||
Alteration permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 215856 | |||||
Alteration permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 646508 | |||||
Zoning/use permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 215869 | |||||
Electrical permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 413542 | |||||
Demolition permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 211935 | |||||
Alteration permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Active | Permit id: 682800 | |||||
Plumbing permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Active | Permit id: 723786 | |||||
Electrical permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Expired | Permit id: 671350 | |||||
Electrical permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 413542 | |||||
Zoning use permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 215869 | |||||
Alteration permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 646508 | |||||
Demolition permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 211935 | |||||
Alteration permit ![]() Client: City Of Phila Phila Golf Club | Permit status: Completed | Permit id: 215856 | |||||
SCORE 78 Ez permit re-roofing- for the installation of new roof coverings on exiting roofs as per attached standard. Deviations from this standard will result in permit revocation and require submission of construction plans. ![]() ![]() Client: City Of Phila Phila Golf Club | Permit type: Alteration permit | Permit status: Completed | Completion date: February 18, 2016 | Permit id: 646508 | |||||
SCORE 100 Install network cameras and sound devices as per nec 2008 (recreation ctr)west district ![]() ![]() Client: City Of Phila Phila Golf Club | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 671350 | |||||
SCORE 100 Install fire alarm system emergency lighting replace per 2008 nfpa 72 ![]() ![]() Client: City Of Phila Phila Golf Club | Permit type: Electrical permit | Permit status: Completed | Completion date: August 10, 2013 | Permit id: 413542 | |||||
SCORE 76 Removal of 20 gallon underground storage tank formerly used for heating oil storage withh planned backfill with clean fill and resurfacing of disturbed area with asphalt pavement ![]() ![]() Client: City Of Phila Phila Golf Club | Permit type: Demolition permit | Permit status: Completed | Completion date: March 10, 2010 | Permit id: 211935 | |||||
Replacing bridge to #6 tee that was destroyed in a storm. No disruption of earth on this project using existing foundations as per plan. ![]() Client: City Of Phila Phila Golf Club | Permit type: Alteration permit | Permit status: Completed | Completion date: December 27, 2011 | Permit id: 215856 | |||||
For the replacement of a footbridge across cobbs creek utilizing existing foundations as part of an existing recreational facility. Size and location as shown in the application. Existing recreational facility. ![]() Client: City Of Phila Phila Golf Club | Permit type: Zoning/use permit | Permit status: Completed | Completion date: July 25, 2017 | Permit id: 215869 | |||||
For the erection of a prefabricated one story modular building for use as a temporary office to an existing golf course. Altertations to include the installation of a foundation system, accessibility improvements and finishes throughout. All work to be done per approved plans. If field conditions vary contact design engineer prior to the start of any work. Amended permit required for special inspections. Separate permits required for mechanical , electrical, and plumbing work. ![]() Client: City Of Phila Phila Golf Club | Permit type: Alteration permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 682800 | |||||
For the erection of a detached structure. Size and location as shown on plans application. For continued use as active recreation. No signs or changes to parking on this application. ![]() Client: City Of Phila Phila Golf Club | Permit type: Zoning/use permit | Permit status: Completed | Completion date: June 28, 2017 | Permit id: 794319 | |||||
SCORE 86 Alteration: interior plumbing for an existing modular 1-story office. Modular building (phila. Golf club). The installation will comply with the philadephia plumbing code, 2004. The use of plastic pipe is not permited on this project, per code sections p-902. 5 & p-1102. 3. ![]() ![]() Client: City Of Phila Phila Golf Club | Permit type: Plumbing permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 723786 | |||||
SCORE 100 Wire 10- receptacles and 6- lights, and 4-emergency exit lighting... In accordance with 2008 nec ![]() ![]() Client: City Of Phila Phila Golf Club | Permit type: Electrical permit | Permit status: Completed | Completion date: July 14, 2017 | Permit id: 723543 |