Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
SCORE 96 Reroof sq. Client: Christophe Lobo,Michelle Lobo | Applicant: 3 R Roofing, Llc | Permit type: Roofing | Permit status: Cmp | Completion date: February 21, 2008 | Current use: Single family d | |||||
SCORE 63 Electrical permit to install new light fixture Client: Christophe Lobo,Michelle Lobo | Applicant: Christophe Lobo | Permit type: Electrical | Permit status: Cmp | Completion date: February 21, 2008 | Current use: Multifamily dwe | |||||
SCORE 63 Construction of a new attached two-car garage (583 s. F.) in accordance with lur2004-00040. Client: Christophe Lobo,Michelle Lobo | Applicant: Christophe Lobo | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 22, 2008 | Current use: Single family a | |||||
SCORE 63 Partial structure demolition to remove the existing attached garage (see lur2004-000 for non-conforming use review). Client: Christophe Lobo,Michelle Lobo | Applicant: Christophe Lobo | Permit type: Demolition | Permit status: Cmp | Current use: Single family a | |||||
SCORE 100 Install cedar privacy fence along northern property line, fence to be 6-feet in height, 70-feet in length. Client: Christophe Lobo,Michelle Lobo | Applicant: Fountain Enterprises | Permit type: Fence | Permit status: Cmp | Completion date: February 21, 2008 | Current use: Single family a | |||||
SCORE 95 In property sewer repair Client: Christophe Lobo,Michelle Lobo | Applicant: Boulder Excavating Co | Permit type: Wastewater | Permit status: Act | Current use: Single family d | |||||
SCORE 99 Remove drive cut on 9th & replace with curb & gutter Client: Christophe Lobo,Michelle Lobo | Applicant: Total Concrete Services Inc | Permit type: Right-of-way | Permit status: Iss | |||||
SCORE 60 Addition and remodel of existing single-family residence with an existing adu (adu 2008-80004). Scope of work to include remodel and addition of 88 s. F. For main level kitchen, 3 s. F. Unfinished storage additon to basement, and upper level deck and patio cover. Client: Christophe Lobo,Michelle Lobo | Applicant: Kathleen Thorne | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 28, 2011 | Current use: Single family d | |||||
SCORE 95 Replace boiler sfd 175,000btu Client: Christophe Lobo,Michelle Lobo | Applicant: Marmot Heating | Permit type: Mechanical | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family d | |||||
SCORE 92 Installation of 1 lineal feet of 6foot high cedar privacy fencing in the front yard. Fence not allowed to be inchoff propertyinch or straddle property line. (driveway and drive cut removed under previous work -- garage accessed from alley) Client: Christophe Lobo,Michelle Lobo | Applicant: Jose Martinez Landscape | Permit type: Fence | Permit status: Cmp | Completion date: March 31, 2011 | Current use: Single family d | |||||
SCORE 95 Installation of 6. 76 kw, rooftop, flushmounted, grid tied, photovoltaic solar energy system on residence. Client: Christophe Lobo | Permit type: Photovoltaic | Permit status: Cmp | Completion date: September 29, 2016 | Current use: Single family detached dwelling, existin | Permit id: Pmt2016-00894 | |||||
SCORE 95 Partial structure demolition to remove the existing attached garage (see lur2004-000 for non-conforming use review). Client: Christophe Lobo | Permit type: Demolition | Permit status: Cmp | Current use: Single family attached dwelling, existin | Permit id: Pmt2004-02410 | |||||
Construction of a new attached two-car garage (583 s. F.) in accordance with lur2004-00040. Client: Christophe Lobo | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 22, 2008 | Current use: Single family attached dwelling, existin | Permit id: Pmt2004-02505 | |||||
SCORE 92 Installation of 1 lineal feet of 6foot high cedar privacy fencing in the front yard. Fence not allowed to be inchoff propertyinch or straddle property line. (driveway and drive cut removed under previous work -- garage accessed from alley) Client: Christophe Lobo | Permit type: Fence | Permit status: Cmp | Completion date: March 31, 2011 | Current use: Single family detached dwelling | Permit id: Pmt2010-05114 | |||||
Addition and remodel of existing single-family residence with an existing adu (adu 2008-80004). Scope of work to include remodel and addition of 88 s. F. For main level kitchen, 3 s. F. Unfinished storage additon to basement, and upper level deck and patio cover. Client: Christophe Lobo | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 28, 2011 | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-00902 | |||||
Electrical permit to install new light fixture Client: Christophe Lobo | Permit type: Electrical | Permit status: Cmp | Completion date: February 21, 2008 | Current use: Multifamily dwellings, existing | Permit id: Pmt2002-05512 | |||||
SCORE 100 Install cedar privacy fence along northern property line, fence to be 6-feet in height, 70-feet in length. Client: Christophe Lobo | Permit type: Fence | Permit status: Cmp | Completion date: February 21, 2008 | Current use: Single family attached dwelling, existin | Permit id: Pmt2003-04630 | |||||
Construction of a new attached two-car garage (583 s. F.) in accordance with lur2004-00040. Client: Christophe Lobo | Permit type: Building, electrical | Permit status: Cmp | Completion date: July 22, 2008 | Current use: Single family attached dwelling, existin | Permit id: Pmt2004-02505 | |||||
SCORE 95 In property sewer repair Client: Christophe Lobo | Permit type: Wastewater | Permit status: Act | Current use: Single family detached dwelling, existin | Permit id: Pmt2004-02588 | |||||
SCORE 95 Reroof sq. Client: Christophe Lobo | Permit type: Roofing | Permit status: Cmp | Completion date: February 21, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2005-03538 | |||||
Addition and remodel of existing single-family residence with an existing adu (adu 2008-80004). Scope of work to include remodel and addition of 88 s. F. For main level kitchen, 3 s. F. Unfinished storage additon to basement, and upper level deck and patio cover. Client: Christophe Lobo | Permit type: Building, electrical, mechanical, plumbing | Permit status: Cmp | Completion date: July 28, 2011 | Current use: Single family detached dwelling, additio | Permit id: Pmt2008-00902 | |||||
SCORE 95 Replace boiler sfd 175,000btu Client: Christophe Lobo | Permit type: Mechanical | Permit status: Cmp | Completion date: August 13, 2008 | Current use: Single family detached dwelling, existin | Permit id: Pmt2008-02903 |