Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Demolition permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 545543 | |||||
Mechanical permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 559910 | |||||
Electrical permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 557950 | |||||
Plumbing permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 564148 | |||||
Alteration permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 542616 | |||||
Mechanical permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 559910 | |||||
Alteration permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 542616 | |||||
Electrical permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 557950 | |||||
Plumbing permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 564148 | |||||
Demolition permit ![]() Client: Equity Vest Llc | Permit status: Completed | Permit id: 545543 | |||||
SCORE 89 Interior improvements throughout existing 3 unit residential bldg. All construction to be non-loadbearing assemblies. No rearrangement of existing space. Enclosure surrounding stairway and all fire rated walls ceilings not to be adversely affected by work. Compliance with phila fire and phila property maintenance codes reqd. Approval of this permit plans notwithstanding. ![]() ![]() Client: Equity Vest Llc | Permit type: Alteration permit | Permit status: Completed | Completion date: February 17, 2015 | Permit id: 542616 | |||||
SCORE 89 Interior demolition non load bearing partitions only(3 family) ![]() ![]() Client: Equity Vest Llc | Permit type: Demolition permit | Permit status: Completed | Completion date: January 8, 2015 | Permit id: 545543 | |||||
SCORE 100 Rewire 1st & 2nd floor only to existing panel as per nec 2008 (triplex) ![]() ![]() Client: Equity Vest Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 2, 2015 | Permit id: 557950 | |||||
SCORE 100 Install 3 guardian 95% furnace 60,000. Btu with 2 ton a c 13 seer in basement ![]() ![]() Client: Equity Vest Llc | Permit type: Mechanical permit | Permit status: Completed | Completion date: January 28, 2015 | Permit id: 559910 | |||||
SCORE 100 Replace 3-toilets, 3-lavs, 3-washer, 3-kitchen, 3-tubs & replace all plumbing throughout (triplex) ![]() ![]() Client: Equity Vest Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: January 28, 2015 | Permit id: 558381 | |||||
SCORE 100 5"ht (p)hd replacement - "self-certifications are no longer permitted" - "all excavations and plumbing trenches in excess of 5 feet in depth must have approved shoring in place at the time of inspection" ![]() ![]() Client: Equity Vest Llc | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 6, 2014 | Permit id: 564148 | |||||
SCORE 100 Rewire 3rd floor only to existing electric panel (triplex) as per nec 2008 ![]() ![]() Client: Equity Vest Llc | Permit type: Electrical permit | Permit status: Completed | Completion date: March 2, 2015 | Permit id: 565011 |