Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
Plumbing permit Date: June 1, 2015 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 613949 | |||||
Use permit Date: December 2, 2014 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 541835 | |||||
Plumbing permit Date: October 3, 2013 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 498456 | |||||
Zoning/use permit Date: September 6, 2013 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 487775 | |||||
New construction permit Date: April 27, 2015 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 598095 | |||||
Zoning permit Date: August 8, 2016 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 709667 | |||||
Demolition permit Date: September 6, 2013 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 487778 | |||||
Permit for the creation of a private, non-accessory surface parking lot with eighteen (18) off street parking spaces (including one van accessible parking space with adjacent access aisle). Size and location as shown per application/plan. Date: September 10, 2014 Client: Trustees Of Green Street | Applicant: Joseph Beller, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 18, 2014 | Permit id: 23704 | |||||
Zoning permit Date: August 8, 2016 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 709667 | |||||
Plumbing permit Date: June 1, 2015 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 613949 | |||||
New construction permit Date: April 27, 2015 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 598095 | |||||
Zoning use permit Date: September 6, 2013 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 487775 | |||||
Use permit Date: December 2, 2014 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 541835 | |||||
Plumbing permit Date: October 3, 2013 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 498456 | |||||
Demolition permit Date: September 6, 2013 Client: Trustees Of Green Street | Permit status: Completed | Permit id: 487778 | |||||
Permit for the creation of a private, non-accessory surface parking lot with eighteen (18) off street parking spaces (including one van accessible parking space with adjacent access aisle). Size and location as shown per application plan. Date: September 10, 2014 Client: Trustees Of Green Street | Applicant: Joseph Beller, Esq. | Permit type: Appeal | Permit status: Granted/prov | Completion date: November 18, 2014 | Permit id: 23704 | |||||
SCORE 100 For the complete demolition of an existing three story structure and detached garage. Date: September 6, 2013 Contractor: Geppert Bros. Inc Client: Trustees Of Green Street | Permit type: Zoning/use permit | Permit status: Completed | Completion date: September 6, 2013 | Permit id: 487775 | |||||
SCORE 100 Complete demolition of existing three (3) story single family row home and one (1) story detached garage as per engineers plans & specifications & code bulletin b-1302. Asbestos abatement shall take place prior to commencement of demolition. A minimum 8-0" high fencing barrier to be provided at the side of walkway nearest demolition, to extend the entire length of construction site. Date: September 6, 2013 Contractor: Geppert Bros. Inc Client: Trustees Of Green Street | Permit type: Demolition permit | Permit status: Completed | Completion date: June 3, 2014 | Permit id: 487778 | |||||
SCORE 100 Seal lateral Date: October 3, 2013 Contractor: Mr Ds Plumbing And Heating Client: Trustees Of Green Street | Permit type: Plumbing permit | Permit status: Completed | Completion date: October 10, 2015 | Permit id: 498456 | |||||
Rough grading site work permit only. Excavation grading of the site work shall include, but not be limited to, excavation, removal of existing surface and subsurface features, and installation of erosion and sedimentation controls. Installation of permable paving and landscaping for a non-accessory parking lot. Date: April 27, 2015 Client: Trustees Of Green Street | Permit type: New construction permit | Permit status: Completed | Completion date: February 8, 2016 | Permit id: 598095 | |||||
For the use of a non-accessory parking lot with seventeen (17) off street open air parking spaces with one van accessible parking space with adjacent access aisle for a total of eighteen (18) offstreet parking spaces. Size and location as shown per application plan. Date: December 2, 2014 Client: Trustees Of Green Street | Permit type: Use permit | Permit status: Completed | Completion date: December 2, 2014 | Permit id: 541835 | |||||
SCORE 100 Replace 8" main drain,curb trap and lateral pa20151352199 (commerical)self certifications are no longer permitted","all excavations and plumbing trenches in excess of 5 ft in depth must have approved shoring in place at the time of inspection" Date: June 1, 2015 Contractor: Best Choice Plumbing Inc Client: Trustees Of Green Street | Permit type: Plumbing permit | Permit status: Completed | Completion date: December 6, 2015 | Permit id: 613949 | |||||
For the lot adjustment to create one (1) lot from seven (7) existing lots (5511 greene st, 69 school house ln, 61 school house ln, 45 school house ln, 5500-06 germantown ave, 5508-12 germantown ave, w armat st), size and location as shown on plan application. See ap#7023 for plans. Date: August 8, 2016 Client: Trustees Of Green Street | Permit type: Zoning permit | Permit status: Completed | Completion date: August 8, 2016 | Permit id: 709667 |