Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Take out old driveway and replace with new concrete driveway Permit status: Closed-issued | Completion date: October 28, 2016 | Permit id: P-Drive-2016-09 | |||||
Basement finish approved w conditions: 1. Building review approved per the 2009 mrc. 2. Smoke alarms shall be installed per 2009 mrc sec. R314 3. Carbon monoxide alarms shall be installed per 2009 mrc sec. R315 4. Load calculations for any headers or lvls must be available on site for inspectors review at time of rough-in inspection. 5. Fire blocking required at wall ceiling intersection per sec. R302. 11 6. Floor plan (as built) shall be submitted to the building inspection office before rough-in inspection. Permit status: Waiting for u and o | Permit id: Br-Rem-2016-010 | |||||
Sidewalk and approach Permit status: Permit issued | Permit id: Sw-Per-2016-012 | |||||
New garage and breezeway Permit status: Closed-finaled | Completion date: November 9, 2016 | Permit id: Br-Acc-2016-116 |