Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Install one gas fired furnace - 75k btu; install one condensing unit - 24k btu/2tons. As per code. All gas work by others Permit id: Com2015-08207 | |||||
Install (20) circuits and (10) low voltage device as per code Permit id: Com2015-08061 | |||||
1 1/2 baths kitchen sink dishwasher garbage disposal laundry hook up sump pump hose bibb electric water heater reconstruct waste and water. Run gas to furnace 1 0 btu range 0 btu range and 0 btu range as per code. Permit id: Com2015-07496 | |||||
Non structural alterations: interior work: 4 sq ft: remodel drywall. Bedrooms bathrooms second floor diningroom and livingroom 1st floor. Exterior work: remove and replace 4 windows 3 basment windows same size/location as per code. Permit id: Com2015-06252 | |||||
(use)the premises as single family dwelling Permit id: Use2016-00074 | |||||
Non structural alterations: interior work: 4 sq ft: remodel drywall. Bedrooms bathrooms second floor diningroom and livingroom 1st floor. Exterior work: remove and replace 4 windows 3 basment windows same size location as per code. Expiration date: September 23, 2015 | Permit id: Com2015-06252 | |||||
1 1 2 baths kitchen sink dishwasher garbage disposal laundry hook up sump pump hose bibb electric water heater reconstruct waste and water. Run gas to furnace 1 0 btu range 0 btu range and 0 btu range as per code. Expiration date: October 6, 2015 | Permit id: Com2015-07496 | |||||
Install one gas fired furnace - 75k btu; install one condensing unit - 24k btu 2tons. As per code. All gas work by others Expiration date: October 15, 2015 | Permit id: Com2015-08207 |