Interior work 4 sqft: interior demo remove all trash and debri first and second floor. 2nd floor remove plaster drywall as per code framing around doors asll work on 2nd floor only as per code separate permit required for tenant fitout Permit id: Com2014-09964 | |||||
Interior work 4 sqft: interior clean out of 1st & 2nd this remove all debris. Remove rotten wood around and 2nd floor bathroom doors. Remove plaster & drywall 2 rooms per floor as per code separate permit will be pulled for tenant fitout Permit id: Com2013-16615 | |||||
Category ii/structural alterations/ interior work: 1396 sq. Ft. 7 interior doors. New bedroom non load bearing walls. New stairs riser 75" tread 10" width 36" railing height 3 ft . On exisitng double 2 x headers. Exterior work: 2 new windows replace same size and same locatio as per code. Expiration date: July 7, 2016 | Permit id: Com2016-00409 | |||||
Upgrade main electrical service from 1 amp to 2 amp. Rewire entire dwelling basement first floor and second floor 15 circuits and fixtures as per code. Expiration date: August 11, 2016 | Permit id: Com2016-03258 | |||||
Replace 1 bath in unit one toilet sink & shower pull cord. As per code Expiration date: August 19, 2016 | Permit id: Com2016-03960 | |||||
Amend permit com2016-039 issued on 2/19/16 to add additional work: (1) kitchen sink and laundry tub as per codeoriginal permit description:(com2016-03960)replace 1 bath in unit one toilet sink & shower pull cord. As per code Expiration date: August 19, 2016 | Permit id: Com2016-04429 | |||||
Rough-in (1) full bathroom: toilet bathtub lavoratory sink laundry tub and kitchen sink and reconstruct water and waste as per code. Expiration date: August 26, 2016 | Permit id: Com2016-04691 | |||||
Original permit description:(com2016-04150)re-wire all house with 2 amp service and 22 new circuits as per code. Expiration date: August 22, 2016 | Permit id: Com2016-09282 | |||||
(use)the entire premises as single family dwelling Permit id: Use2016-00078 | |||||
Re-wire all house with 2 amp service and 22 new circuits as per code. Expiration date: August 22, 2016 | Permit id: Com2016-04150 | |||||
Category ii structural alterations interior work: 1396 sq. Ft. 7 interior doors. New bedroom non load bearing walls. New stairs riser 75" tread 10" width 36" railing height 3 ft . On exisitng double 2 x headers. Exterior work: 2 new windows replace same size and same locatio as per code. Expiration date: July 7, 2016 | Permit id: Com2016-00409 | |||||
Amend permit com2016-039 issued on 2 19 16 to add additional work: (1) kitchen sink and laundry tub as per codeoriginal permit description:(com2016-03960)replace 1 bath in unit one toilet sink & shower pull cord. As per code Expiration date: August 19, 2016 | Permit id: Com2016-04429 |