Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Cash bond tracking # ps3a10426 Permit type: Demolition or move p | Permit status: Completed | Completion date: February 6, 2008 | Current use: Single family dwelling | Permit id: 288294 | |||||
Electrical permit Permit status: Finaled | Completion date: February 2, 2004 | Current use: Single family dwelling | Permit id: 320475 | |||||
Electrical permit Permit status: Finaled | Completion date: May 15, 2009 | Current use: Swimming pool | Permit id: 495348 | |||||
Building residential Permit status: Finaled | Completion date: February 2, 2004 | Current use: Single family dwelling | Permit id: 288295 | |||||
Building residential permit Permit status: Finaled | Current use: Swimming pool | Permit id: 495314 | |||||
Addition- walk out concrete steps Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 500650 | |||||
Driveway permit: construct the following type driveway in accordance with montgomery county standards and specifications and the direction of the dps inspector. All future maintenance of this apron will be the responsibility of the property owner. Mcdot standard 301. 01. Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 221615 | |||||
On anniston road replace 4 poles, heavy-up transformer and overhead secondary wire, install cable and associated overhead and underground equipment in accordance with pepco plan no. 6735427. Pepco contact person is roberta dickey at 301-548-4305, field representative is tony dilima at 301-548-4319. >>>pre-construction meeting required>>pre-construction meeting required>pre-construction meeting requiredpre-construction meeting required<< Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 225846 |