Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 59 On november 15, 2016 my wife and i will welcome our first child into the world. Our home was built in 1926, is very drafty, and is in need of a basement upgrade that will provide our child with a safe, warm, and clean place to spend her first few years of life. 565e stratford avenue, salt lake city, ut 84106 the following is the scope, and order of operations, of what will take place to prepare our basement for baby: 1. Tear out old floors, drywall, and framing from basement thereby exposing the foundation and original concrete slab floor. 2. Install hydronic radiant floor heating to supplement existing electric furnace. A. 1-inch eps rigid foam insulation sheets installed directly onto existing concrete slab. I. Joints of insulation sheets will be sealed on top and bottom using weatherproof tape. B. 1 8 wire remesh sheets layed out in grid formation on to of eps sheets. C. O2 barrier pex tubing will be attached to the remesh grid to ensure even spacing and stability. I. Manufacturer Date: September 14, 2016 Contractor: Mckinney Young Basement Remodelkrisotpher Young Permit status: Inspections | Current use: Residential | Permit id: Bld2016-07910 | |||||
SCORE 59 Replace windows like for like with retrofit vinyl windows that have a . 35 or better u-value, installed per manufacturers specifications. Date: February 1, 2016 Contractor: Young Windows 8826761jamie Reed Permit status: Closed | Current use: Residential | Permit id: Bld2016-00370 | |||||
SCORE 59 Date: August 24, 2016 Contractor: Mckinney Demokristopher Young Permit status: Closed | Current use: Residential | Permit id: Bld2016-07686 |