Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
T4c Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 380245 | |||||
Electrical permit Permit status: Finaled | Completion date: June 21, 2006 | Current use: Single family dwelling | Permit id: 393956 | |||||
New 12 kw generator. Permit type: Electrical permit | Permit status: Finaled | Completion date: October 2, 2006 | Current use: Single family dwelling | Permit id: 425729 | |||||
Building residential Permit status: Finaled | Completion date: June 21, 2006 | Current use: Single family dwelling | Permit id: 381589 | |||||
On newington road (house #5621) install 4 amp underground service, dig and backfill trench, build conduit, install cable and associated equipment in accordance with pepco plan no. 53088036. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. Pre-construction meeting requiredcontact mcdps inspector bob bucklin at 301-370-3683 before and after installation. Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 240551 | |||||
Pre-construction meeting required contact mc. Dps inspector robert bucklin @ 301-370-3683 install 3/4-inch gas service from 2-inch gas main via 3-ft x 4-ft cut. Complete repair & restoration of the right of way shall be made, "in-kind", of any and all damages done to the existing improvements in the public right-of-way caused by construction operations on this site. Notify mc. Dps inspector when work is complete utility representative: charlie holmon @ 202-624-6054 wgl #314998/p-33242 Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 238499 |