Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Non-structural alterations/ interior work 50 sq. Ft. - clean all surfaces and provide paint and frp for health. New wall finishes in sales along w/ new decor pkg. Replace some refrigerated cases w/ like for like as exist. Were rusted out per health haza Permit id: Com2015-04812 | |||||
Install three grease interceptors gpm 25 a per drawing/spec/code Permit id: Com2015-04148 | |||||
"non-structural alterations/ exterior work - remove existing wall sign and install 1 - set of channel letter and logo wall sign 2 sq. Ft. Illuminated and 1 fixture. Reface existing pole sign 7 4"" x 16 double and reface existing tenant directory sign 30" Permit id: Com2014-44101 | |||||
Subway- restaurant Permit id: Use2011-05177 | |||||
Use portion of premises k/a 56 the alameda as a cell phone store Permit id: Use2009-02178 | |||||
Non-structural alterations/ exterior work - remove existing wall sign and install 1 - set of channel letter and logo wall sign 2 sq. Ft. Illuminated and 1 fixture. Reface existing pole sign 7 4" x 16 double and reface existing tenant directory sign 30" x 9. All work done as per sketch/code. All work on private property. Expiration date: June 15, 2015 | Permit id: Com2014-44101 | |||||
Non-structural alterations/ interior work 50 sq. Ft. - clean all surfaces and provide paint and frp for health. New wall finishes in sales along w/ new decor pkg. Replace some refrigerated cases w/ like for like as exist. Were rusted out per health hazard. Relamp balast and fixture lights per maintance. Exterior work - minor non-structural non mep improvements to the steel columns in the front to include cladding brick to steel columns and making patch and paint repairs to the soffit in order to improve the aesthetics of store front. All work done to code. Expiration date: September 4, 2015 | Permit id: Com2015-04812 | |||||
Minor interior demo new walls paint light fixtures minor plumbing minor hvac as per plans. Separate permit will be required for sprinkler system. Expiration date: April 8, 2004 | Permit id: Com2003-24184 | |||||
Replace sign with 48 sq ft channell letters on 42 storefront and 1 ckts Expiration date: February 4, 2004 | Permit id: Com2003-33956 | |||||
Replace sign with 230sq ft channell letters on 26 storefront and 1 ckts Expiration date: February 4, 2004 | Permit id: Com2003-33957 | |||||
Replace sign with 26 sq ft channell lettrs on 23 storefront and 1 ckts Expiration date: February 4, 2004 | Permit id: Com2003-33959 | |||||
Install 4 x 29 -116 sq ft "family dollor" sign on store fron frontage ft illuminated 1- 16 amp ckt Expiration date: February 21, 2004 | Permit id: Com2003-35372 | |||||
Run vent line to new manages officeinstall new 7. 5 to a/c unit Expiration date: February 25, 2004 | Permit id: Com2003-35521 | |||||
(use) use entire premises as a retail space for family dollar (variety store). No expiration date Permit id: Com2003-36876 | |||||
New wall partition for new handycap restroom. Expiration date: May 1, 2004 | Permit id: Com2003-40569 | |||||
Install 3 fixtures new line drain to outlets & water pipe on premiser Expiration date: October 31, 2004 | Permit id: Com2003-40638 | |||||
Use portion of premises k/a 5638 the alameda for a clothing store. No expiration date Permit id: Com2003-43064 | |||||
Replace 2 sprinkler heads and relocate 1 sprinkler head. As per code. Expiration date: December 7, 2016 | Permit id: Com2016-14598 | |||||
Amend permit: add contractor .(original permit:com2016-12088:interior alterations for a new tenant (alameda marketplace) construction of a new rear door and stair way for rear egress as per plans as per code.)original permit description:(com2016-12088)interior alterations for a new tenant (alameda marketplace) construction of a new rear door and stair way for rear egress as per plans as per code. Expiration date: December 22, 2016 | Permit id: Com2016-17287 | |||||
Interior alterations for a new tenant (alameda marketplace) construction of a new rear door and stair way for rear egress as per plans as per code. Expiration date: December 22, 2016 | Permit id: Com2016-12088 | |||||
Add/relocate sprinklers for new tenant layout as per plans as per code. Expiration date: April 6, 2017 | Permit id: Com2016-22014 | |||||
Interior alterations for new 12 457 square foot family dollar store mercantile tenant mechanical electrical plumbing work included alterations to the existing storefront doors construction of a rear loading dock and rear egress stair nstallation of two new rear doors as per plans as per code. Separate permits are required for sprinkler and fire alarm systems. Expiration date: August 25, 2017 | Permit id: Com2016-15490 | |||||
Relocate 15 sprinklers and add 2. Work done to code. Expiration date: January 18, 2017 | Permit id: Com2016-18442 | |||||
Install approx. Feet of 3" pip to relocate existing gas meter as per code. Expiration date: March 20, 2017 | Permit id: Com2016-24027 | |||||
Tenant fit-out includes installation of locker and toilet rooms open exercise areas janitor s closets reception area and tanning and massage machine rooms as per plans as per code. Separate permit required for sprinkler system anf fire alarm Expiration date: November 4, 2017 | Permit id: Com2016-11116 | |||||
Voice and data 15 low voltage as per code. Expiration date: April 28, 2017 | Permit id: Com2016-27796 | |||||
All finishes lighting hvac plumbing and rear exit exists install a new pair of 3-0" x 7-0" storefront doors in an existing storefront system to serve as and entry/exit construct one interior partition containing one door install two new exit/emergency lights minor additional electrical work as per plans as per code. Expiration date: January 22, 2017 | Permit id: Com2016-14419 | |||||
Amend permit: add contractor .(original permit:com2016-11116:tenant fit-out includes installation of locker and toilet rooms open exercise areas janitor s closets reception area and tanning and massage machine rooms as per plans as per code. Separate permit required for sprinkler system anf fire alarm)original permit description:(com2016-11116)tenant fit-out includes installation of locker and toilet rooms open exercise areas janitor s closets reception area and tanning and massage machine rooms as per plans as per code. Separate permit required for sprinkler system anf fire alarm Expiration date: November 4, 2017 | Permit id: Com2016-31629 | |||||
Adding 5 heads and relocate heads to accomodate modifications as per code Expiration date: August 10, 2017 | Permit id: Com2017-03424 | |||||
Non-structural alterations exterior work - remove existing wall sign and install 1 - set of channel letter and logo wall sign 2 sq. Ft. Illuminated and 1 fixture. Reface existing pole sign 7 4" x 16 double and reface existing tenant directory sign 30" x 9. All work done as per sketch code. All work on private property. Expiration date: June 15, 2015 | Permit id: Com2014-44101 | |||||
Install three grease interceptors gpm 25 a per drawing spec code Expiration date: August 24, 2015 | Permit id: Com2015-04148 | |||||
Non-structural alterations interior work 50 sq. Ft. - clean all surfaces and provide paint and frp for health. New wall finishes in sales along w new decor pkg. Replace some refrigerated cases w like for like as exist. Were rusted out per health hazard. Relamp balast and fixture lights per maintance. Exterior work - minor non-structural non mep improvements to the steel columns in the front to include cladding brick to steel columns and making patch and paint repairs to the soffit in order to improve the aesthetics of store front. All work done to code. Expiration date: September 4, 2015 | Permit id: Com2015-04812 | |||||
Replace existing fire control panel as per code. Expiration date: August 23, 2017 | Permit id: Com2017-04313 | |||||
All finishes lighting hvac plumbing and rear exit exists install a new pair of 3-0" x 7-0" storefront doors in an existing storefront system to serve as and entry exit construct one interior partition containing one door install two new exit emergency lights minor additional electrical work as per plans as per code. Expiration date: January 22, 2017 | Permit id: Com2016-14419 | |||||
Add relocate sprinklers for new tenant layout as per plans as per code. Expiration date: April 6, 2017 | Permit id: Com2016-22014 | |||||
Install one illuminated wall sign "planet fitness" 5x38-1 1 4"= 190. 52 sq. Ft. --replace tenatn panel on existing freestanding sign - 2 2 1 4"x9 1 4"= 19. 73 sq. Ft x2sided 39. 56 sq. Ft. Expiration date: July 20, 2017 | Permit id: Com2017-01008 | |||||
Upgrade to 2 v grounded center phase service 400a from 200a upgrade to 240v 6 amp service from 4 amp wo# 14351249 Expiration date: July 25, 2017 | Permit id: Com2017-01960 | |||||
Amend permit: add contractor .(original permit:com2016-11116:tenant fit-out includes installation of locker and toilet rooms open exercise areas janitor s closets reception area and tanning and massage machine rooms as per plans as per code. Separate permit required for sprinkler system anf fire alarm)original permit description:(com2016-11116)tenant fit-out includes installation of locker and toilet rooms open exercise areas janitor s closets reception area and tanning and massage machine rooms as per plans as per code. Separate permit required for sprinkler system anf fire alarm Expiration date: November 4, 2017 | Permit id: Com2017-03181 | |||||
Use portion of premises k a 56 the alameda as a cell phone store Permit id: Use2009-02178 | |||||
Run vent line to new manages officeinstall new 7. 5 to a c unit Expiration date: February 25, 2004 | Permit id: Com2003-35521 | |||||
Use portion of premises k a 5638 the alameda for a clothing store. No expiration date Permit id: Com2003-43064 |