| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
1. 5 ton ductless split, dw type 2 hood, mau via hvac Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-239065-000 | |||||
Wire for copious ti. Power and ltg. Permit type: Electrical inspections | Permit status: Approved | Completion date: February 17, 2015 | Permit id: 2014-239116-000 | |||||
Low voltage for controls Permit type: Intake | Permit status: Closed | Completion date: November 18, 2014 | Permit id: 2014-239200-000 | |||||
Interior tenant improvement, installation of break room sinks. Permit type: Plumbing inspections | Permit status: Approved | Completion date: January 7, 2015 | Permit id: 2014-239449-000 | |||||
Tenant improvement for new office tenant on main floor, new walls for large conference room, multiple offices and break room with sink and dishwasher Permit type: Application | Permit status: Approved | Completion date: December 1, 2014 | Permit id: 2014-243591-000 | |||||
Redistribution of air on existing vrf systme, add ductless split systems for server rooms, controls, duct heaters, osa via rtus installed on 13-211638-mt Permit type: Intake | Permit status: Closed | Completion date: December 24, 2014 | Permit id: 2014-244093-000 | |||||
Wire for new seasons hq tenant improvement circuits Permit type: Electrical inspections | Permit status: Approved | Completion date: March 19, 2015 | Permit id: 2014-244394-000 | |||||
L/e for fire alarm - suite 103, copious Permit type: Electrical inspections | Permit status: Approved | Completion date: February 13, 2015 | Permit id: 2014-245757-000 | |||||
L/e for fire alarm - new seasons market headquarters, 3rd & 4th floor Permit type: Electrical inspections | Permit status: Approved | Completion date: March 19, 2015 | Permit id: 2014-245759-000 | |||||
Alarm- install fire alarm notification for the copious ti utilizing the existing building system Permit type: Intake | Permit status: Approved | Completion date: December 12, 2014 | Permit id: 2014-249038-000 | |||||
Office tenant improvement in existing shell space on 2nd floor, new walls for conference room, entry and employee coffee bar/kitchen with sink Permit type: Application | Permit status: Approved | Completion date: December 15, 2014 | Permit id: 2014-249702-000 | |||||
Office tenant improvement -add employee coffee bar/kitchen and cabinets for new tenant Permit type: Application | Permit status: Approved | Completion date: December 15, 2014 | Permit id: 2014-249709-000 | |||||
Fire sprinkler - over the counter - add 1 sprinkler due to new wall Permit type: Intake | Permit status: Approved | Completion date: December 16, 2014 | Permit id: 2014-249922-000 | |||||
L/v for telecom - 3rd & 4th floor tenant, new seasons market Permit type: Electrical inspections | Permit status: Approved | Completion date: March 18, 2015 | Permit id: 2014-250416-000 | |||||
Voice/data cabling security - rough in only Permit type: Intake | Permit status: Closed | Completion date: December 19, 2014 | Permit id: 2014-251507-000 | |||||
Adding access control to doors and elevators. Permit type: Electrical inspections | Permit status: Approved | Completion date: January 28, 2015 | Permit id: 2014-251578-000 | |||||
Wire for new tenant - suite 0214 harvest pr & marketing Permit type: Electrical inspections | Permit status: Approved | Completion date: February 11, 2015 | Permit id: 2014-253316-000 | |||||
Wire for new tenant - suite 0210, murmur creative llc Permit type: Electrical inspections | Permit status: Approved | Completion date: December 30, 2014 | Permit id: 2014-253319-000 | |||||
Wire for new tenant - suite 106, struck Permit type: Electrical inspections | Permit status: Appr w/corr | Completion date: January 30, 2015 | Permit id: 2014-253596-000 | |||||
Relocate existing thermostats and install new thermostats for unit heaters. Permit type: Intake | Permit status: Closed | Completion date: December 24, 2014 | Permit id: 2014-253702-000 | |||||
Rough in new break sink and coffee maker in tenant suite Permit type: Plumbing inspections | Permit status: Approved | Completion date: January 13, 2015 | Permit id: 2014-254628-000 | |||||
Alarm-add one notificaton device Permit type: Intake | Permit status: Approved | Completion date: December 30, 2014 | Permit id: 2014-254937-000 | |||||
Receptacle work, power to power pole Permit type: Electrical inspections | Permit status: Approved | Completion date: February 6, 2015 | Permit id: 2015-102056-000 | |||||
Sprinkler-add four pendent sprinklers due to new ceilings and relocate two uprights due to new walls Permit type: Intake | Permit status: Approved | Completion date: January 8, 2015 | Permit id: 2015-102679-000 | |||||
Sprinkler - add pendents where new walls and ceilings are installed Permit type: Intake | Permit status: Approved | Completion date: January 8, 2015 | Permit id: 2015-102681-000 | |||||
Wire for new tenant - suite 203, non-stop hr Permit type: Electrical inspections | Permit status: Approved | Completion date: January 26, 2015 | Permit id: 2015-102980-000 | |||||
Interior tenant improvement of existing building Permit type: Plumbing inspections | Permit status: Approved | Completion date: January 13, 2015 | Permit id: 2015-103843-000 | |||||
Sprinkler-add one pendant sprinkler and two uprights due to new ceilings and walls. Permit type: Intake | Permit status: Approved | Completion date: January 14, 2015 | Permit id: 2015-104896-000 | |||||
Interior tenant improvement Permit type: Plumbing inspections | Permit status: Approved | Completion date: January 16, 2015 | Permit id: 2015-105814-000 | |||||
Wire for new tenant Permit type: Electrical inspections | Permit status: Approved | Completion date: January 26, 2015 | Permit id: 2015-108988-000 | |||||
Wire for new tenant - riddle burret, suite 208 Permit type: Electrical inspections | Permit status: Approved | Completion date: January 26, 2015 | Permit id: 2015-108990-000 | |||||
Sprinkler-add pendents where new wall and ceilings are installed Permit type: Intake | Permit status: Approved | Completion date: January 23, 2015 | Permit id: 2015-109786-000 | |||||
Wire for new tenant - suite 204 Permit type: Electrical inspections | Permit status: Approved | Completion date: January 30, 2015 | Permit id: 2015-111977-000 | |||||
Wire for new tenant - suite 304 Permit type: Electrical inspections | Permit status: Approved | Completion date: January 30, 2015 | Permit id: 2015-111979-000 | |||||
Add new duct work and grilles to existing vrf equipment; add 1 new exhaust fan (operable windows at 4% of floor area for ventilation) Permit type: Intake | Permit status: Closed | Completion date: February 3, 2015 | Permit id: 2015-114251-000 | |||||
Low volt wiring Permit type: Intake | Permit status: Closed | Completion date: February 3, 2015 | Permit id: 2015-114300-000 | |||||
Telecom cabling - suite 214, harvest pr & marketing Permit type: Electrical inspections | Permit status: Approved | Completion date: February 11, 2015 | Permit id: 2015-117152-000 | |||||
Tenant improvement for new restaurant/bar tenant in 2 spaces, ground floor prep and support area with trash room and walk in cooler (to be permitted separately); bar, seating and fixtures/equipment in adjacent space (common restrooms existing as part of core and shell permit); 2nd floor includes bar and seating area and fixtures/equipment Permit type: Application | Permit status: Approved | Completion date: February 13, 2015 | Permit id: 2015-119568-000 | |||||
Added value revision to add walk in cooler box Permit type: Application | Permit status: Approved | Completion date: April 16, 2015 | Permit id: 2015-119568-Rev | |||||
Alarm-install notification appliances as required for ti Permit type: Intake | Permit status: Approved | Completion date: February 17, 2015 | Permit id: 2015-119610-000 | |||||
Alarm- addition of fire alarm notification appliances to the existing system to facilitate buildout of the new seasons space Permit type: Intake | Permit status: Approved | Completion date: February 17, 2015 | Permit id: 2015-119613-000 | |||||
Sprinkler - modify piping and add heads where new walls and ceilings are installed Permit type: Intake | Permit status: Approved | Completion date: February 17, 2015 | Permit id: 2015-120295-000 | |||||
Interior tenant improvement for bar/lounge Permit type: Environmental services | Permit status: Approved | Completion date: April 15, 2015 | Permit id: 2015-121199-000 | |||||
Wire for new tenant - good george, ste 110 Permit type: Electrical inspections | Permit status: Approved | Completion date: April 13, 2015 | Permit id: 2015-121273-000 | |||||
Wire for new tenant - good george, ste 212a Permit type: Electrical inspections | Permit status: Approved | Completion date: April 13, 2015 | Permit id: 2015-121275-000 | |||||
4-ton fan coil on existing vrf system, natural ventilation via operable windows at 45 square feet minimum Permit type: Intake | Permit status: Closed | Completion date: February 19, 2015 | Permit id: 2015-121534-000 | |||||
Wire for new tenant - suite 215 Permit type: Electrical inspections | Permit status: Approved | Completion date: April 1, 2015 | Permit id: 2015-130556-000 | |||||
Install (1) illuminated monument sign - 17. 83 sq. Ft. - n. E. Corner of site per lu 14-207349hr Permit type: Intake | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2015-132657-000 | |||||
(1) sign lighting for monument sign Permit type: Intake | Permit status: Closed | Completion date: March 12, 2015 | Permit id: 2015-132663-000 | |||||
Sprinkler-spin two branchlines and change(7) upright heads to pendents Permit type: Intake | Permit status: Approved | Completion date: March 23, 2015 | Permit id: 2015-138497-000 | |||||
Wire for new tenant - roboboogie, suite 111 Permit type: Electrical inspections | Permit status: Approved | Completion date: April 21, 2015 | Permit id: 2015-145502-000 | |||||
Sprinkler-demo one upright sprinkler to supply one pendant at new ceiling Permit type: Intake | Permit status: Approved | Completion date: April 9, 2015 | Permit id: 2015-147242-000 | |||||
Sprinkler-relocate one upright, change one upright to pendent, and add one pendent at new ceiling. Permit type: Intake | Permit status: Approved | Completion date: April 9, 2015 | Permit id: 2015-147247-000 | |||||
Sprinkler-add three pendents, relocate two upright and plug one upright Permit type: Intake | Permit status: Approved | Completion date: April 9, 2015 | Permit id: 2015-147254-000 | |||||
Sprinkler - add (2) uprights, change (11) uprights to pendents, shorten (3) sprigs Permit type: Intake | Permit status: Approved | Completion date: April 10, 2015 | Permit id: 2015-147498-000 | |||||
Install walk-in cooler, no exterior work. Permit type: Intake | Permit status: Closed | Completion date: April 14, 2015 | Permit id: 2015-148911-000 | |||||
Wire for new tenant - suite 209, nonstop Permit type: Electrical inspections | Permit status: Approved | Completion date: July 2, 2015 | Permit id: 2015-154166-000 | |||||
Interior t. I. Of existing building Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-164418-000 | |||||
Interior tenant improvement break room Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 10, 2015 | Permit id: 2015-164427-000 | |||||
Rough in and install (1) utility sink in bike storage room Permit type: Plumbing inspections | Permit status: Approved | Completion date: June 11, 2015 | Permit id: 2015-175388-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Application | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Issuance/intake | Permit status: Intake | Completion date: June 22, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Planning and zoning | Permit status: Not reqd | Completion date: June 22, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Site development | Permit status: Not reqd | Completion date: June 22, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Life safety | Permit status: Approved | Completion date: June 26, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Structural | Permit status: Approved | Completion date: June 29, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Fire bureau | Permit status: Approved | Completion date: June 25, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Transportation | Permit status: Not reqd | Completion date: June 22, 2015 | Permit id: 2015-189848-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Water bureau review | Permit status: Not reqd | Completion date: June 25, 2015 | Permit id: 2015-189848-000 | |||||
Renovation of existing washington hs including change of use from school to a non-separated assembly use - a performing arts theater with mercantile and office tenant spaces and rooftop deck. Ground floor is shell only with separate tis required prior to occupancy of ground floor spaces to establish occupancy, exiting, lighting, & demising walls. Permit type: Application | Permit status: Approved | Completion date: October 14, 2013 | Permit id: 2013-211631-000 | |||||
Dfs 1: spray on fireproofing renovation of existing washington hs including change of use from school to a non-separated assembly use - a performing arts theater with mercantile and office tenant spaces and rooftop deck. Ground floor is shell only with separate tis required prior to occupancy of ground floor spaces to establish occupancy, exiting, lighting, & demising walls. Permit type: Application | Permit status: Approved | Completion date: April 9, 2014 | Permit id: 2013-211631-Dfs | |||||
Dfs 02 - rooftop deck guardrails Permit type: Application | Permit status: Approved | Completion date: April 21, 2014 | Permit id: 2013-211631-Dfs | |||||
Dsf for attachment of mechanical equipment Permit type: Application | Permit status: Approved | Completion date: April 22, 2014 | Permit id: 2013-211631-Dfs | |||||
Dsf 4 : steel stairs Permit type: Application | Permit status: Approved | Completion date: May 15, 2014 | Permit id: 2013-211631-Dfs | |||||
Dfs 5 : for aluminum storefront & doors Permit type: Application | Permit status: Approved | Completion date: May 16, 2014 | Permit id: 2013-211631-Dfs | |||||
Dfs - glass canopy Permit type: Application | Permit status: Approved | Completion date: June 27, 2014 | Permit id: 2013-211631-Dfs | |||||
Dfs 7 : skylights Permit type: Application | Permit status: Approved | Completion date: August 20, 2014 | Permit id: 2013-211631-Dfs | |||||
Structural revision to the roof deck. Permit type: Application | Permit status: Approved | Completion date: January 30, 2014 | Permit id: 2013-211631-Rev | |||||
Revision to capture plan review; see comments Permit type: Application | Permit status: Approved | Completion date: February 4, 2014 | Permit id: 2013-211631-Rev | |||||
Revision increase in work scope: auditorium renovation; ground level: add acoustic isolation ceiling system - gwb on resilient hangers; 2nd floor: revised doors and landings at auditorium - rear of hall; additional steel in attic space for future rigging/lighting bars by the tenant. Permit type: Application | Permit status: Approved | Completion date: July 22, 2014 | Permit id: 2013-211631-Rev | |||||
Revision 4 : revison to occupant load Permit type: Application | Permit status: Approved | Completion date: October 17, 2014 | Permit id: 2013-211631-Rev | |||||
Revision 5 : revison to landscaping requirements Permit type: Application | Permit status: Approved | Completion date: December 4, 2014 | Permit id: 2013-211631-Rev | |||||
50-zone vrf, ductwork, one 27. 5t, one 20t, one 7. 5-t and one 3t gas packs, gas piping Permit type: Intake | Permit status: Closed | Completion date: October 14, 2013 | Permit id: 2013-211638-000 | |||||
Revision to address changes due to renovation of auditorium 50-zone vrf, ductwork, one 27. 5t, one 20t, one 7. 5-t and one 3t gas packs, gas piping Permit type: Intake | Permit status: Closed | Completion date: July 25, 2014 | Permit id: 2013-211638-Rev | |||||
Wiring for remodel and new tenants -/ additional scope plan review and fees captured on rev 01. 200a svc/fdr and (30) circuits added to installation on this permit. Permit type: Intake | Permit status: Closed | Completion date: December 17, 2013 | Permit id: 2013-239337-000 | |||||
Revision to capture additional plan review. Scope of work added to main 13-239337 et. Permit type: Intake | Permit status: Closed | Completion date: August 4, 2014 | Permit id: 2013-239337-Rev | |||||
Low volt control wiring for floors 1-4 and rooftopfaxed Permit type: Intake | Permit status: Closed | Completion date: January 14, 2014 | Permit id: 2014-104474-000 | |||||
Interior plumbing for remodel, 104 fixtures Permit type: Intake | Permit status: Closed | Completion date: January 15, 2014 | Permit id: 2014-105476-000 | |||||
Sprinkler-install new fire sprinklers and underground fire service to supply (e) standpipes. All floors to be demoed and new pipe to be installed throughout the entire bldg, except for piping above auditorium. Permit type: Intake | Permit status: Approved | Completion date: January 16, 2014 | Permit id: 2014-105880-000 | |||||
Wire for fire alarm for building remodel- washington high school Permit type: Electrical inspections | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2014-131146-000 | |||||
Fire alarms-installation of fire alarm system Permit type: Intake | Permit status: Approved | Completion date: April 1, 2014 | Permit id: 2014-132188-000 | |||||
Wire for security/access control - washington high school Permit type: Electrical inspections | Permit status: Approved | Completion date: November 13, 2014 | Permit id: 2014-152304-000 | |||||
Stm conn: 260lf of 12 vsp main, approx d=8, in se stark st. Contractor to install 12 x 6 tee into 12 main and prepare 6 branch to property per std p-262.. Contractor to verify all depths and locations in field. Contact x37869 Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157109-000 | |||||
Connect new storm lateral in row - extend storm to new facilities Permit type: Intake | Permit status: Closed | Completion date: May 15, 2014 | Permit id: 2014-157123-000 | |||||
Demolish 2,784 sf boiler room/storage building south of high school building, remove all debris Permit type: Application | Permit status: Approved | Completion date: June 25, 2014 | Permit id: 2014-174694-000 | |||||
8-3-14 noise complaint - construction work on sundays. Permit type: Request | Permit status: Closed | Completion date: August 11, 2014 | Permit id: 2014-196633-000 | |||||
8-3-14 noise complaint - construction work on sundays. Permit type: Request | Permit status: Closed | Completion date: October 3, 2014 | Permit id: 2014-196633-000 | |||||
Cap two laterals in public easement on property; pbot note location Permit type: Intake | Permit status: Closed | Completion date: August 28, 2014 | Permit id: 2014-205094-000 | |||||
Approval of historic resource review for new signs and sign lighting at the washington high school building, a portland historic landmark, to include the following: one 6 tall x 7-4 wide concrete, aluminum, and acrylic, internally illuminated monument sign at the raised northeast corner of the site; two 2 x 2 aluminum with vinyl graphics, non-illuminated wall signs on the west faade; and eight 2-6 x 2-6 aluminum with vinyl graphics blade signs, each with one mounting arm and two light directional fixtures. Two signs are on the north faade; three signs are on the east facade, and three signs are on the west faade. Approved, per the approved site plans, exhibits c-1 through c-7 signed and dated december 18, 2014, subject to the following conditions (a and b):a. As part of the building permit application submittal, each of the 4 required site plans and any additional drawings must reflect the information and design approved by this land use review as indicated in exhibits c. 1-c. 7. The shee Permit type: Land use review | Permit status: Completed | Completion date: September 3, 2014 | Permit id: 2014-207349-000 | |||||
Tenant improvement for actors prep room on 2nd floor, new walls for restroom and shower Permit type: Application | Permit status: Approved | Completion date: September 8, 2014 | Permit id: 2014-209494-000 | |||||
Backflow device installation Permit type: Intake | Permit status: Closed | Completion date: September 30, 2014 | Permit id: 2014-219167-000 | |||||
Tenant improvement for new seasons headquarters on a portion of the 3rd floor and 4th floor of existing building. Permit type: Application | Permit status: Approved | Completion date: October 16, 2014 | Permit id: 2014-226599-000 | |||||
Dfs for operable partition on 4th floor at training room Permit type: Application | Permit status: Approved | Completion date: December 19, 2014 | Permit id: 2014-226599-Dfs | |||||
Tenant improvement for new first time tenant, add walls to create offices and breakroom. See 13-211631 co for shell permit. Permit type: Application | Permit status: Approved | Completion date: October 17, 2014 | Permit id: 2014-227049-000 | |||||
Ti for new tenant; seating and railing upgrades to existing auditorium space; new stairs and railings on the balcony. New accessible seating with accessible upgrades. Permit type: Application | Permit status: Approved | Completion date: October 17, 2014 | Permit id: 2014-227103-000 | |||||
Reviews Permit status: Closed | Completion date: October 17, 2014 | Permit id: 2014-227206-000 | |||||
Street tree planting permit Permit type: D - permit request | Permit status: No permit required | Completion date: October 24, 2014 | Permit id: 2014-228790-000 | |||||
Install new (1) water closet, (2) lavs, (1) electric hot water heater, & (1) shower to new ti (ste # 205 / ready room) Permit type: Plumbing inspections | Permit status: Approved | Completion date: November 12, 2014 | Permit id: 2014-234780-000 | |||||
Rough in and install (n) island sink/wh/floor drain Permit type: Plumbing inspections | Permit status: Approved | Completion date: November 19, 2014 | Permit id: 2014-235599-000 | |||||
Circuits for non-fused disconnects with connections to (3) ceiling mounted heaters Permit type: Electrical inspections | Permit status: Approved | Completion date: September 8, 2015 | Permit id: 2015-204843-000 | |||||
8-13-15 noise complaint - amplified music Permit type: Request | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217436-000 | |||||
Concert Permit type: Intake | Permit status: Complete | Completion date: August 17, 2015 | Permit id: 2015-219185-000 | |||||
Freeze protection, two 15 kw heaters Permit type: Intake | Permit status: Approved | Completion date: August 18, 2015 | Permit id: 2015-219890-000 | |||||
Install 2 thermostats for 2 unit heaters Permit type: Intake | Permit status: Closed | Completion date: August 18, 2015 | Permit id: 2015-219905-000 | |||||
Temp service for constructionfaxed Permit type: Electrical inspections | Permit status: Approved | Completion date: October 30, 2013 | Permit id: 2013-217924-000 | |||||
Wire for new tenant - suite 106, struckfaxed Permit type: Electrical inspections | Permit status: Appr w/corr | Completion date: January 30, 2015 | Permit id: 2014-253596-000 | |||||
Wire for new tenant - suite 201, brink communications Permit type: Electrical inspections | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2015-154162-000 | |||||
Wire for new tenant - suite 307, cast iron coding Permit type: Electrical inspections | Permit status: Approved | Completion date: July 7, 2015 | Permit id: 2015-154164-000 | |||||
Ti for existing tenant; add partition wall to create two conference rooms Permit type: Application | Permit status: Approved | Completion date: June 22, 2015 | Permit id: 2015-189848-000 | |||||
Emt from back board to south west corner of bldg, roof jack Permit type: Electrical inspections | Permit status: Approved | Completion date: July 22, 2015 | Permit id: 2015-192375-000 | |||||
Add five new uprights due to new walls. Permit type: Intake | Permit status: Approved | Completion date: July 9, 2015 | Permit id: 2015-199141-000 | |||||
Wire for conference room - suite 206, washington high school Permit type: Electrical inspections | Permit status: Approved | Completion date: August 10, 2015 | Permit id: 2015-201334-000 | |||||
Add fire alarm notification for two new conference rooms Permit type: Intake | Permit status: Approved | Completion date: July 16, 2015 | Permit id: 2015-202631-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: July 17, 2015 | Permit id: 2015-203148-000 | |||||
8-13-15 noise complaint - amplified music Permit type: Request | Permit status: Closed | Completion date: August 13, 2015 | Permit id: 2015-217436-000 | |||||
Revision increase in work scope: auditorium renovation; ground level: add acoustic isolation ceiling system - gwb on resilient hangers; 2nd floor: revised doors and landings at auditorium - rear of hall; additional steel in attic space for future rigging lighting bars by the tenant. Permit type: Application | Permit status: Approved | Completion date: July 22, 2014 | Permit id: 2013-211631-Rev | |||||
Tenant improvement for new restaurant bar tenant in 2 spaces, ground floor prep and support area with trash room and walk in cooler (to be permitted separately); bar, seating and fixtures equipment in adjacent space (common restrooms existing as part of core and shell permit); 2nd floor includes bar and seating area and fixtures equipment Permit type: Application | Permit status: Approved | Completion date: February 13, 2015 | Permit id: 2015-119568-000 | |||||
Emergency response to tree failure Permit type: C - emergency | Permit status: Emergency resolved | Completion date: July 17, 2015 | Permit id: 2015-203148-000 | |||||
Demolish non-structural interior partition walls and clgs inside an unoccupied building upon purchase of whs from portland public schools by whs llc on 10 25 13. Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: March 25, 2014 | Current use: Business | Permit id: 2013-214733-000 | |||||
Office tenant improvement in existing shell space on 2nd floor, new walls for conference room, entry and employee coffee bar kitchen with sink Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: February 13, 2015 | Current use: Business | Permit id: 2014-249702-000 | |||||
Office tenant improvement -add employee coffee bar kitchen and cabinets for new tenant Client: Southeast Uplift Neighborhood Program | Permit type: Alteration | Permit status: Final | Completion date: February 13, 2015 | Current use: Business | Permit id: 2014-249709-000 | |||||
Demo modular building Client: Southeast Uplift Neighborhood Program | Permit type: Demolition | Permit status: Final | Completion date: October 16, 2007 | Current use: Educational | Permit id: 2006-163995-000 | |||||
Demolish 2,784 sf boiler room storage building south of high school building, remove all debris Client: Southeast Uplift Neighborhood Program | Permit type: Demolition | Permit status: Final | Completion date: October 10, 2014 | Current use: Storage | Permit id: 2014-174694-000 |