Demo / rebuild Permit type: Demolition or move p | Permit status: Finaled | Completion date: July 12, 2013 | Current use: Single family dwelling | Permit id: 629894 | |||||
Rebuild Permit type: Demolition or move p | Permit status: Finaled | Completion date: March 25, 2015 | Current use: Single family dwelling | Permit id: 651806 | |||||
Electrical permit Permit status: Finaled | Completion date: April 9, 2015 | Current use: Single family dwelling | Permit id: 686810 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Completion date: April 9, 2015 | Current use: Single family dwelling | Permit id: 687145 | |||||
Mechanical permit Permit status: Finaled | Completion date: January 29, 2014 | Current use: Single family dwelling | Permit id: 645160 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 632111 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 648438 | |||||
New const Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 629458 | |||||
Deck : per montgomery county deck details Permit type: Building residential permit | Permit status: Finaled | Current use: Deck | Permit id: 644046 | |||||
Demo/rebuild Permit type: Building residential permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 651805 | |||||
Must check mcdot paving projects schedule and have preconstruction meeting with dps row inspector prior to beginning of construction. Install 3/4" gas service in accordance with washington gas plan no. 176190. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and ada & aba accessibility guidelines. A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 294980 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permit type: Public right of way | Permit status: Completed | Current use: Driveway | Permit id: 305306 | |||||
Restoration of row complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused byconstruction operations. Work shall be complete as directed by the dps row inspector and in accordance with the public right-of-way accessibility guidelines (prowag). All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permit type: Public right of way | Permit status: Issued | Current use: Driveway | Permit id: 353837 | |||||
Please do not request inspections under this permit until 2 business days after permit issuance. Permit type: Electrical permit | Permit status: Issued | Current use: Single family dwelling | Permit id: 780505 | |||||
Remove and install cable and associated equipment in accordance with pepco plan no. 3429428. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Must check mcdot paving project schedule and have preconstruction meeting with dps row Permit type: Public right of way | Permit status: Finaled | Current use: Public utility | Permit id: 301992 | |||||
Dw permit (residential)remove existing driveway. Construct mc-301. 03 type driveway in accordance with montgomery county standards and specifications and the direction of the dps row inspector. Complete repair (restoration of right of way) shall be made of any and all damages done to the existing improvements in the public right of way caused by construction operations on this site. All lane and sidewalk closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Md
|