Content | Date | Cost | Contractor Rank | Address | Contractor |
---|---|---|---|---|---|
SCORE 100 Renovations to office space on the 27th floor to include new lighting millwork and flooring install for the new audio visual equipment install in the conference room. No fire alarm egress not affected 6 sprinkler relocates. Permit type: Renovations -interio | Current use: Comm | Permit id: Sf127857 | |||||
SCORE 100 Renovations to office space on the 24th floor to include new lighting millwork and flooring install for the new audio visual equipment install in the conference room. No fire alarm egress not affected 6 sprinkler relocates. Permit type: Renovations -interio | Current use: Comm | Permit id: Sf127854 | |||||
SCORE 100 Renovations to office space on the 17th floor to include new lighting millwork and flooring install for the new audio visual equipment install in the conference room. No fire alarm egress not affected 6 sprinkler relocates Permit type: Renovations -interio | Current use: Comm | Permit id: Sf127861 | |||||
Install water main; 4 x 7 rdwy (3); 5 x 5 sdwk; ; umbro; extension; no work 1125-1129 Date: September 23, 2015 Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-472762 | |||||
Installation of upho Date: October 31, 2013 Permit status: Na | Permit id: Chm300876 | |||||
Installation of upho Date: January 30, 2014 Permit status: Na | Permit id: Chm323276 | |||||
Burning &; welding gondola hanger support tube steel and bracing bfd paid detail required Date: June 5, 2012 Permit status: Na | Permit id: Cbw146428 | |||||
Turn up sprinkler heads for demo space. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Work to be done one floor zone at a time per nfpa stands. 7 cmr. Date: August 7, 2013 Permit status: Na | Permit id: Sprk266792 | |||||
SCORE 82 Relocate andor add a total of 605 sprinkler heads Date: February 20, 2015 Contractor: Boston Fire Sprinkler Co. Inc Permit type: Bfd other | Permit status: Na | Permit id: Sprk446306 | |||||
New fire alarm device for cna ins. On the 5th floor of 53 state st. Tie into existing bldg fire alarm system.; ~; doc # 20110969 Date: October 4, 2011 Permit status: Na | Permit id: Bfdf94940 | |||||
Only one floor shall be impaired at any given time coordinate impairment with building managment Date: February 25, 2014 Permit status: Na | Permit id: Sprk325348 | |||||
Installation of upho Date: October 31, 2013 Permit status: Na | Permit id: Chm300894 | |||||
Installation of upho Date: August 7, 2015 Permit status: Na | Permit id: Chm500584 | |||||
Relocate 37 sprinkler heads on;8th floor Date: August 23, 2013 Permit status: Na | Permit id: Sprk271335 | |||||
Temporary bagging of smoke detectors for dust control during construction Date: August 8, 2011 Permit status: Na | Permit id: Bsd88839 | |||||
Relocate (140) sprinkler heads to new ceiling grid on 5th floor. Work to be done per nfpa stands. One floor zone at a time. Date: August 31, 2011 Permit status: Na | Permit id: Sprk92274 | |||||
Installation of new devices doc# 20121469 Date: January 7, 2013 Permit status: Na | Permit id: Bfdf209893 | |||||
Relocate (4) existing sprinkler heads to center of tile on 14th floor.; work to be done one floor zone at a time per nfpa stand.; Date: October 14, 2010 Permit status: Na | Permit id: Sprk45966 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: November 9, 2012 Permit status: Na | Permit id: Bsd197845 | |||||
Relocate 8 sprinklers. Work to; be done one floor zone at a time. Per nfpa stands. 7 cmr. One floor zone at a time. Date: April 11, 2012 Permit status: Na | Permit id: Sprk128695 | |||||
SCORE 86 Relocate approximately (36) wet sprinkler heads to accommodate new construction renovation work performed off hours 12th floor Date: October 6, 2010 Contractor: Barry C. Rose Barry Rose Fire Protection Llc Permit status: Na | Permit id: Sprk44969 | |||||
Installation of upho Date: December 8, 2012 Permit status: Na | Current use: Comm | Permit id: Chm204018 | |||||
Relocate existing pendent sprinkler to upright type 14th floor Date: August 20, 2010 Permit status: Na | Permit id: Sprk38269 | |||||
SCORE 82 Impairment shall be limited to one zone at any given time within the building coordinate impairment with building management Date: May 12, 2015 Contractor: Boston Fire Sprinkler Co. Inc Permit type: Bfd other | Permit status: Na | Permit id: Sprk467477 | |||||
Only one floor shall be impaired at any given time.... Installation shall be inaccordance with nfpa 13 and 7 cmr. Date: January 12, 2015 Permit status: Na | Permit id: Sprk436326 | |||||
Only one floor impaired at a time Date: February 4, 2013 Permit status: Na | Permit id: Sprk216838 | |||||
New fire alarm devices to be tied into the existing system - morgan-stanley - floors 39 only~ doc# 20111249 Date: April 9, 2012 Permit status: Na | Permit id: Bfdf106668 | |||||
Temporary bagging of smoke detectors Date: October 16, 2014 Permit status: Na | Permit id: Bsd416505 | |||||
SCORE 100 New fire alarm for citizens at 53 state st tie into existing building fa system - phase 1 only.; full set is for phasing overview.; phase 2 under separate permit. Date: May 27, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf463448 | |||||
Coordinate impairment with building managment so that only one floor is impaired at any given time. Relocate 9 sprinklers for new ceiling work Date: January 3, 2013 Permit status: Na | Permit id: Sprk210539 | |||||
Bagging of smoke detectors Date: July 18, 2014 Permit status: Na | Permit id: Bsd382776 | |||||
Installation of upho Date: December 11, 2012 Permit status: Na | Current use: Comm | Permit id: Chm195952 | |||||
Cutting burning welding of steel pipes and hangers of water pump for replacement of chiller and associated piping needed to provide air conditioning for piping feeding elevator (dpl) bfd detail required bfd paid detail required Date: October 30, 2014 Permit status: Na | Permit id: Cbw420063 | |||||
New fire alarm device for 7th floor boston consulting group at 53 state street tie into existing building fa system. Doc#20130988 Date: September 16, 2013 Permit status: Na | Permit id: Bfdf279230 | |||||
Only one floor shall be impaired at any given time installation inaccordance with the requirements of nfpa13 and 7 cmr Date: July 14, 2014 Permit status: Na | Permit id: Sprk381180 | |||||
Temporray bagging of smoke detectors for dust control during renovation work Date: December 17, 2013 Permit status: Na | Permit id: Bsd312729 | |||||
Burning &; welding for the installation of fuel sevice &; exhaust piping (dpl); bfd paid detail required Date: January 24, 2014 Permit status: Na | Permit id: Cbw320191 | |||||
SCORE 100 New fire alarm device for factset at 53 state st tie into existing building fa system Date: June 9, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf479023 | |||||
Burning &; welding of new beam framing to existing beams over new folding partition (dpl) bfd paid detail required Date: July 16, 2015 Permit status: Na | Permit id: Cbw490305 | |||||
Burning &; welding for the installation of steel beams channels &; angles (dpl) bfd paid detail required Date: June 12, 2014 Permit status: Na | Permit id: Cbw370312 | |||||
Install (1)smoke and (1)strobe Date: February 13, 2013 Permit status: Na | Permit id: Bfdf211989 | |||||
Only one floor shall be impaired at any given time coordinated impairment with building management Date: November 14, 2013 Permit status: Na | Permit id: Sprk298075 | |||||
Relocate (2) sprinklers Date: April 2, 2012 Permit status: Na | Permit id: Sprk126250 | |||||
Relocate one existing sprinker head and add 1 new sprinkler head to new ceiling grid for a total of 2. Date: June 26, 2013 Permit status: Na | Permit id: Sprk253624 | |||||
Renovations to include floors walls ceiling paint &; carpet secure any floor openings Date: February 4, 2013 Permit status: Na | Permit id: Fdc218311 | |||||
Only one floor shall be impaired at any given time Date: May 22, 2015 Permit type: Bfd other | Permit status: Na | Permit id: Sprk469195 | |||||
SCORE 100 New fire alarm devices for lincoln properties @ 53 state st on the 8th floor tie into existing building fa system Date: July 22, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf486895 | |||||
Only one floor shall be impaired at any given time... Coordinate impairment with building management Date: January 27, 2014 Permit status: Na | Permit id: Sprk318208 | |||||
Turn up;approx. 25;sprinkler heads to meet code.; work to be done per nfpa stands. 7 cmr one floor zone at a time. Date: October 16, 2014 Permit status: Na | Permit id: Sprk412866 | |||||
New fire alarm device for aetna at 53 state st. Tie into existing building fa system; ~; doc# 20141766 Date: February 26, 2015 Permit status: Na | Permit id: Bfdf437186 | |||||
Turn existing sprinklers on the 5th - 8th - 10th;&; 13th floors from pendent to upright. Work to be done one floor zone at a time. Per nfpa stands. 7 cmr 8th ed. Date: May 9, 2011 Permit status: Na | Permit id: Sprk75362 | |||||
Relocate (1) sprinkler head for new room layout 5th floor Date: November 12, 2010 Permit status: Na | Permit id: Sprk51225 | |||||
Coordinate impairment with building management so that only one floor is impaired at any given time Date: July 31, 2013 Permit status: Na | Permit id: Sprk265703 | |||||
Demo &; reno work to include drywall carpet patching paintng ceilings gypsum partations &; new inter connecting stair. Date: December 29, 2014 Permit status: Na | Permit id: Fdc436876 | |||||
Temporary bagging of smoke detectors for dust control during on-going construction Date: June 14, 2013 Permit status: Na | Permit id: Bsd252776 | |||||
Install 1 smoke detector with ra1 4 visual devices 17 audiablestrobes doc20121154 Date: November 7, 2012 Permit status: Na | Permit id: Bfdf188140 | |||||
SCORE 86 Relocation of (101) existing sprinkler heads.; work to be done per nfpa stands. 7 cmr one floor zone at a time. Date: June 30, 2015 Contractor: Rich Chaisson Atlantic Fire Protection Inc Permit status: Na | Permit id: Sprk480912 | |||||
Installation inaccordance with nfpa 13 and 7 cmr only one zone shall be impaired at any given time Date: June 2, 2014 Permit status: Na | Permit id: Sprk363321 | |||||
Installation of upho Date: August 7, 2015 Permit status: Na | Permit id: Chm500583 | |||||
Impairment shall be coordinated with building management so that only one floor is impaired at any given time Date: November 5, 2012 Permit status: Na | Permit id: Sprk196628 | |||||
Office reconfiguration to include installation of (1) av device doc#20131058 Date: September 20, 2013 Permit status: Na | Permit id: Bfdf284235 | |||||
Relocate # sprinkler heads to new ceiling grid (existing) on 5th floor. Work to be done one floor zone at a time per nfpa 13 stands. Date: June 15, 2011 Permit status: Na | Permit id: Sprk81198 | |||||
Turn up sprinkler heads for floor demo. Sprinkler system to maintain proper coverage and operation per nfpa stands. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Date: July 22, 2013 Permit status: Na | Permit id: Sprk261471 | |||||
Demolition renovation of office space to include drywall painting ceilings and flooring Date: March 17, 2011 Permit status: Na | Permit id: Fdc67924 | |||||
Demo to include drywall partitions &; finishes for donovan &; hatem Date: July 18, 2013 Permit status: Na | Permit id: Fdc263717 | |||||
Temporary place of assembly for 427 persons on 06062013 from 6-9 Date: June 4, 2013 Permit status: Na | Permit id: Tpla240985 | |||||
Coordinated impairment with building management; so that only one zone is impaired at any given time. Installation shall comply with 7 cmr and nfpa 13 Date: May 18, 2015 Permit type: Bfd other | Permit status: Na | Permit id: Sprk468770 | |||||
New fire alarm devices to be tied into the existing system.; work to be done on the 4th floor per plans.; ~; doc# 20120457 Date: May 17, 2012 Permit status: Na | Permit id: Bfdf132220 | |||||
Temporary bagging of smoke detectors for dust control during construction Date: July 1, 2013 Permit status: Na | Permit id: Bsd258360 | |||||
Relocation of existing sprinkler heads to accommodate new ceiling layout and installation of new pre-action system to date center 12th floor Date: September 8, 2010 Permit status: Na | Permit id: Sprk41270 | |||||
Install 4 visual only devices 4 audiovisual devices 2 smoke detectors with rai 1 control module to door locks to unlock upon system activations doc20121155 Date: October 31, 2012 Permit status: Na | Permit id: Bfdf188136 | |||||
New fire alarm device for fitness center of 53 state st. Tie into existing building fa system; ~; doc# 20140968 Date: August 11, 2014 Permit status: Na | Permit id: Bfdf384097 | |||||
Relocate 21 existing sprinkler heads to new ceiling grid. Work to be done per nfpa stands. 7 cmr. One floor zone at a time. Date: December 14, 2012 Permit status: Na | Permit id: Sprk205004 | |||||
Welding only to tie in existing heating system (dpl) bfd paid detail required Date: June 9, 2015 Permit status: Na | Permit id: Cbw478846 | |||||
Temporary bagging of smoke detectors Date: June 16, 2015 Permit status: Na | Permit id: Bsd483509 | |||||
SCORE 100 New fire alarm devices for lincoln properties @ 53 state st on the 12th floor tie into existing building fa system (phase one only) Date: August 5, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf486906 | |||||
Turn up (170) sprinkler heads on 7th floor Date: September 27, 2012 Permit status: Na | Permit id: Sprk180669 | |||||
Coordinate impairment with building management so that only one floor is impaired at any given time Date: December 13, 2012 Permit status: Na | Permit id: Sprk204760 | |||||
Relocate (8) sprinklers on 27th floor. Work to be done one floor zone at a time. Work to be done per nfpa stands. 7 cmr. Date: April 17, 2012 Permit status: Na | Permit id: Sprk129004 | |||||
Relocate 1 existing sprinkler heads to conform to new floor plan and meet state and local codes. Only one floor shall be impaired at any given time Date: August 15, 2013 Permit status: Na | Permit id: Sprk267822 | |||||
Relocate (6) heads on the 39th;&; (2) heads on the 40th floor on an existing fire sprinkler system.; all lines &; mains are to remain "as is." Date: December 12, 2011 Permit status: Na | Permit id: Sprk108566 | |||||
Relocate 8 sprinklers for new ceiling work Date: August 30, 2013 Permit status: Na | Permit id: Sprk276937 | |||||
SCORE 100 New fire alarm devices for citizens at 53 state st tie into existing building fa system - phase 2 Date: July 9, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf482637 | |||||
New fire alarm device for neuberger berman of 53 state st. Tie into existing building fa system; ~; doc# 20140110 Date: February 12, 2014 Permit status: Na | Permit id: Bfdf322922 | |||||
SCORE 86 Relocate approx. (26) wet sprinklers on 4th floor to accommodate new construction renovation. Work to be done one floor zone at a time. Work to be done per nfpa stands. 7 cmr. Date: April 17, 2012 Contractor: Barry C. Rose Barry Rose Fire Protection Llc Permit status: Na | Permit id: Sprk129605 | |||||
Installation shall comply with 7 cmr and nfpa 13.;sprinkler system shall comply with chapter 148 section 26 &;26a . Date: February 21, 2014 Permit status: Na | Permit id: Sprk323802 | |||||
Coordinate with building managment so that only one floor shall be impaired at any given time Date: February 4, 2013 Permit status: Na | Permit id: Sprk215062 | |||||
Welding to add steel support to the;slab for a core to be put in place (dpl); bfd paid detail required Date: July 22, 2010 Permit status: Na | Permit id: Cbw34663 | |||||
Relocate (15) existing sprinkler heads to new ceiling grid on the 2nd floor. Work to be done one floor zone at a time per nfpa stands. Date: August 16, 2011 Permit status: Na | Permit id: Sprk89708 | |||||
New fire alarm device for 8th floor common area of 53 state st. Tie into existing building pa system; ~; doc# 20130904 Date: September 18, 2013 Permit status: Na | Permit id: Bfdf270322 | |||||
Temporary bagging of smoke detectors for dust control Date: April 30, 2015 Permit status: Na | Permit id: Bsd466816 | |||||
New fire alarm device for 30th floor boston consulting group at 53 state st. On the 30th floor to tie into existing fire alarm system. Doc20131124 Date: October 18, 2013 Permit status: Na | Permit id: Bfdf289198 | |||||
Coordinate impairment with the buildings impairment coordinator (required by 527 cmr 1. Section 16. 3) so that only one zone is impaired at any given time within the building... Installation shall comply with 7 cmr and nfpa 13 Date: August 25, 2015 Permit type: Bfd other | Permit status: Na | Permit id: Sprk505511 | |||||
SCORE 100 New fire alarm devices at 53 state st on the 12th floor for tenant lincoln properties tie into existing building fa system phase 2 Date: September 3, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf512288 | |||||
SCORE 100 New fire alarm devices at 53 state st on the 7th floor for tenant bcg tie into existing building fa system Date: September 3, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf512277 | |||||
Installation of pane Date: October 31, 2013 Permit status: Na | Permit id: Chm300914 | |||||
Temp generator with a 1 200-gallon oil storage tank to serve as temp emergency generator Date: November 15, 2013 Permit type: Emergency generator | Permit status: Na | Permit id: Gp305445 | |||||
Installation of floo Date: June 17, 2015 Permit status: Na | Permit id: Chm479687 | |||||
Ceiling tiles Date: November 29, 2012 Permit type: Installation of inte | Permit status: Na | Current use: Comm | Permit id: Chm197598 | |||||
Installation of upho Date: March 31, 2014 Permit status: Na | Permit id: Chm348372 | |||||
Installation of upho Date: December 17, 2012 Permit status: Na | Permit id: Chm208702 | |||||
Demo/renovations to office space to include drywall painting flooring &; ceiling etc; Date: March 2, 2012 Permit status: Na | Permit id: Fdc121884 | |||||
SCORE 80 Minor interior demo and renovation to office space. Date: May 27, 2015 Contractor: Kelly Mattei Permit type: Bfd other | Permit status: Na | Permit id: Fdc476221 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: July 5, 2013 Permit status: Na | Permit id: Bsd260006 | |||||
Cutting (4) steel beams and q-decking for removal and disposal to accommodate new support beams and new connecting stair installation (dpl) sprinklers must not be disabled bfd paid detail required Date: February 4, 2015 Permit status: Na | Permit id: Cbw445151 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: December 5, 2012 Permit status: Na | Permit id: Bsd203372 | |||||
New fire alarm device doc 20130869 Date: September 17, 2013 Permit status: Na | Permit id: Bfdf267806 | |||||
Temporary bagging of smoke detectors for dust control during renovation work maintain security Date: December 17, 2012 Permit status: Na | Permit id: Bsd206937 | |||||
Burning &; welding of steel support member (dpl) bfd paid detail required Date: June 4, 2015 Permit status: Na | Permit id: Cbw479175 | |||||
Install new fire alarm devices as required for 12th floor tenant improvements dow jones.; per nfpa 72. 7 cmr 7th;ed. Doc#20100928 Date: March 7, 2011 Permit status: Na | Permit id: Bfdf47795 | |||||
Temporary bagging of smoke detectors for dust control during construction Date: April 2, 2012 Permit status: Na | Permit id: Bsd127969 | |||||
Tenant renovations to include demo drywall partition ceiling flooring painting and finish work Date: October 16, 2012 Permit status: Na | Permit id: Fdc190637 | |||||
Renovation of 14th fl doc20121373 Date: January 4, 2013 Permit status: Na | Permit id: Bfdf203306 | |||||
Temporary bagging of smoke detectors for dust control during construction activities Date: August 27, 2010 Permit status: Na | Permit id: Bsd39754 | |||||
Demo of existing ceilings partitions &; install new ceilings &; walls (secure any floor openings) Date: April 22, 2010 Permit status: Na | Permit id: Fdc21986 | |||||
Demo &; renovations of existing office space to include drywall ceilings paint &; flooring Date: January 28, 2013 Permit status: Na | Permit id: Fdc215409 | |||||
Demo/renovations of existing office space to include paint carpet &; ceiling; Date: August 1, 2011 Permit status: Na | Permit id: Fdc88136 | |||||
Renovation work to include demo drywall partition and finish work Date: July 5, 2013 Permit status: Na | Permit id: Fdc259973 | |||||
SCORE 100 Drywall ceiling painting flooring Date: May 28, 2015 Contractor: Garland Building Company Permit type: Bfd other | Permit status: Na | Permit id: Fdc474962 | |||||
Burning &; welding of piping to connect new steam bfd paid detail required Date: October 6, 2010 Permit status: Na | Permit id: Cbw45652 | |||||
Renovation to include modifications to existing space including new finishes Date: March 26, 2012 Permit status: Na | Permit id: Fdc126583 | |||||
Demolitionof existing office space to include drywall ceiling paint flooring secure any floor openings Date: March 8, 2013 Permit status: Na | Permit id: Fdc224983 | |||||
Installation of floo Date: March 25, 2013 Permit status: Na | Permit id: Chm222707 | |||||
Demo/renovations;of office space to include drywall ceiling paint &; flooring Date: August 27, 2012 Permit status: Na | Permit id: Fdc176816 | |||||
Cutting &; welding on the condenser &; chilled water system Date: December 6, 2011 Permit status: Na | Permit id: Cbw107912 | |||||
Installation shall be in accordance with nfpa 12a Date: April 28, 2011 Permit status: Na | Permit id: Bfdf71706 | |||||
Temporary bagging of smoke detectors for dust control during construction Date: July 31, 2013 Permit status: Na | Permit id: Bsd268283 | |||||
Cutting &; welding for;installation of new condenser water valves bfd paid detail required Date: October 19, 2010 Permit status: Na | Permit id: Cbw36666 | |||||
Install new fire alarm devices as required for 12th floor common area renovations Date: October 26, 2010 Permit status: Na | Permit id: Bfdf47802 | |||||
Demo / reno of existing space to include drywall ceiling painting &; flooring Date: December 12, 2014 Permit status: Na | Permit id: Fdc433594 | |||||
Cutting &; welding for modifications to the base building piping &; mechanical systems bfd paid detail required Date: October 24, 2012 Permit status: Na | Permit id: Cbw193542 | |||||
Interior demolition to include drywall &;finishes Date: July 1, 2013 Permit status: Na | Permit id: Fdc258350 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction Date: October 22, 2012 Permit status: Na | Permit id: Bsd193217 | |||||
General permit to heat up the barrisol stretched ceiling system material as part of the instaltion process with 2-20lbs of propane. There will be no open flame and the propane will be removed from the building at the end of each shift. Bfd paid detail required all procedures will be conducted in accordance with the b. F. P. C.; 527 cmr 6. And; the n. F. P. A. #101. Date: March 15, 2013 Permit type: Temporary heat | Permit status: Na | Permit id: Gp227512 | |||||
Cutting / burning / welding for installation of structural steel reinforcement for high density files and moveable partition (dpl) bfd paid detail required Date: September 11, 2013 Permit status: Na | Permit id: Cbw283525 | |||||
Cutting &; welding;of hot water tank (dpl) bfd paid detail required Date: May 12, 2010 Permit status: Na | Permit id: Cbw23532 | |||||
Demo/renovations to;existing space to include drywall ceiling paint &; flooring Date: July 18, 2014 Permit status: Na | Permit id: Fdc382771 | |||||
Temporary bagging of smoke detectors for dust control during construction maintain security Date: February 4, 2013 Permit status: Na | Permit id: Bsd192230 | |||||
Renovations of office space to include flooring painting ceiling &; millwork Date: April 2, 2012 Permit status: Na | Permit id: Fdc127953 | |||||
SCORE 100 ; drywall painting ceiling flooring Date: May 28, 2015 Contractor: Garland Building Company Permit type: Bfd other | Permit status: Na | Permit id: Fdc474955 | |||||
Reno;&; demo of 1 wall &; upgrades to architectural finishes Date: April 30, 2015 Permit status: Na | Permit id: Fdc466808 | |||||
Wall coverings Date: November 29, 2012 Permit type: Installation of inte | Permit status: Na | Current use: Comm | Permit id: Chm197590 | |||||
Install (4) detectors for pre-action system doc#20100954 Date: November 1, 2010 Permit status: Na | Permit id: Bfdf48380 | |||||
Temporary bagging of smoke detectors Date: June 18, 2015 Permit status: Na | Permit id: Bsd483435 | |||||
Demolition / renovation of existing space to include patching of finishes Date: June 14, 2013 Permit status: Na | Permit id: Fdc252780 | |||||
Cutting / burning / welding for installation of structural steel reinforcement for high density files and moveable partitons (dpl) bfd paid detail required Date: August 22, 2013 Permit status: Na | Permit id: Cbw273784 | |||||
Build out of pantry &; installation of door on 12th floor Date: October 16, 2014 Permit status: Na | Permit id: Fdc416489 | |||||
Installation of inte Date: April 2, 2013 Permit status: Na | Permit id: Chm224391 | |||||
Cutting &; welding for modification/repair to include installation of piping valves for water condenser system bfd paid detail required Date: June 29, 2011 Permit status: Na | Permit id: Cbw82896 | |||||
Temporary bagging of smoke detectors Date: December 29, 2014 Permit status: Na | Permit id: Bsd436679 | |||||
Installation of inte Date: January 6, 2015 Permit status: Na | Permit id: Chm438449 | |||||
Tenant fit-up to include new offices conference areas bathroom upgrades finishes carpets walls and new ceilings Date: August 27, 2010 Permit status: Na | Permit id: Fdc39751 | |||||
Demolition / renovations to space including drywall ceiling flooring and paint Date: August 11, 2010 Permit status: Na | Permit id: Fdc37236 | |||||
Cutting / burning / welding for installation of structural steel to infill stair openings (dpl) bfd paid detail required Date: November 5, 2012 Permit status: Na | Permit id: Cbw195697 | |||||
Burning &; cutting;of;(4) steel beams ;q-decking ;new support beams &;new connecting stair (dpl) bfd paid detail required Date: March 19, 2015 Permit status: Na | Permit id: Cbw455218 | |||||
Bagging of smoke detectors Date: October 8, 2014 Permit status: Na | Permit id: Bsd410560 | |||||
Temporary bagging of smoke detectors for dust control during maintenance work Date: March 8, 2013 Permit status: Na | Permit id: Bsd224984 | |||||
Brazing of copper water lines;for installation of air conditioning system as replacement of hvac unit Date: December 19, 2014 Permit status: Na | Permit id: Cbw435071 | |||||
Cutting / welding on garage door and frame for repair (dpl) bfd paid detail required Date: October 19, 2010 Permit status: Na | Permit id: Cbw43181 | |||||
Cutting &; welding;to install rails bfd paid detail required Date: January 28, 2011 Permit status: Na | Permit id: Cbw58975 | |||||
Erect 50x5 pedestrian staging on sidewalk Date: September 17, 2012 Permit type: Street occupancy | Permit status: Expired | Permit id: Occu-183937 | |||||
Installation in accordance with;nfpa 72 20 edition and 7 cmr 8th edition doc#20101072 Date: May 11, 2011 Permit status: Na | Permit id: Bfdf52389 | |||||
Temporary bagging of smoke detectors for dust control during removal of furniture Date: April 1, 2011 Permit status: Na | Permit id: Bsd69907 | |||||
Interior renovations to restrooms &; common corridors to include new wallboard carpet paint tiles &; lighting ; Date: June 21, 2011 Permit status: Na | Permit id: Fdc80508 | |||||
Demo &; reno work to inlcude new architectural finishes walls flooring millwork &; existing shelving Date: June 18, 2015 Permit status: Na | Permit id: Fdc483433 | |||||
New fa devices in hallway bathroom &; common core areas on the 5th floor; -; doc #20110686 Date: July 13, 2011 Permit status: Na | Permit id: Bfdf83447 | |||||
Demolition / renovation to existing office space to include new finishes ceiling flooring paint and drywall Date: August 24, 2011 Permit status: Na | Permit id: Fdc91846 | |||||
Demolition / renovations of existing office space to include drywall ceiling paint and flooring Date: December 18, 2012 Permit status: Na | Permit id: Fdc203368 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction Date: March 17, 2011 Permit status: Na | Permit id: Bsd67921 | |||||
Demo/ renovations of existing office space to include drywall ceiling paint &; flooring Date: August 1, 2013 Permit status: Na | Permit id: Fdc266890 | |||||
Bagging of smoke detectors Date: April 20, 2010 Permit status: Na | Permit id: Bsd21987 | |||||
Bagging of smoke detectors; Date: June 15, 2011 Permit status: Na | Permit id: Bsd80509 | |||||
Cutting / burning / welding of existing structural beams ;installation of new structural steel beams and support steel for stair opening and installation of new ornamental stairs to accommodate modifications (dpl) bfd paid detail required Date: February 19, 2015 Permit status: Na | Permit id: Cbw448033 | |||||
Tenant renovation work to include demolition drywall partition ceiling flooring painting and finish work Date: October 23, 2012 Permit status: Na | Permit id: Fdc193198 | |||||
Temporary bagging of smoke detectors for dust control during ongoing construction work Date: August 11, 2010 Permit status: Na | Permit id: Bsd37233 | |||||
SCORE 89 Installation of inte Date: October 10, 2013 Contractor: Susan Reichert The Cheviot Corp Permit status: Na | Permit id: Chm294645 | |||||
Demo/renovations;of existing space to include drywall ceilings paint &; flooring ; Date: October 8, 2014 Permit status: Na | Permit id: Fdc410559 | |||||
Renovations to main lobby including doors frames ceilings concrete and paint secure any floor openings Date: December 17, 2012 Permit status: Na | Permit id: Fdc206940 | |||||
Tenant renovations to include demo drywall partition ceiling flooring painting and finish work Date: November 9, 2012 Permit status: Na | Permit id: Fdc197823 | |||||
Temporary bagging of smoke detectors for dust control during renovation work Date: March 27, 2012 Permit status: Na | Permit id: Bsd126585 | |||||
Burning / welding of steel angles for renovation work bfd paid detail required Date: February 15, 2012 Permit status: Na | Permit id: Cbw118769 | |||||
Temporary bagging of smoke detectors for dust control during construction Date: August 1, 2013 Permit status: Na | Permit id: Bsd266954 | |||||
Erect and maintain pedestrian protective staging on sidewalk / 24 hrs / 50x6 Date: August 1, 2013 Permit type: Staging | Permit status: Expired | Permit id: Occu-269946 | |||||
SCORE 100 Demo/renovations of existing office space to include flooring ceiling drywall Date: January 12, 2015 Contractor: Garland Building Company Permit type: Bfd other | Permit status: Na | Permit id: Fdc440205 | |||||
Demolition work to include drywall partition and finish work Date: December 17, 2013 Permit status: Na | Permit id: Fdc312735 | |||||
Bagging of smoke detectors Date: August 27, 2012 Permit status: Na | Permit id: Bsd176818 | |||||
Cutting &; welding of structural steel bfd paid detail required Date: December 8, 2010 Permit status: Na | Permit id: Cbw54019 | |||||
New fire alarm device for hachette book of 53 state st. Tie into existing building fa system; ~; doc# 20140646 Date: August 19, 2014 Permit status: Na | Permit id: Bfdf362987 | |||||
Welding;of tube supports ;(dpl) Date: January 7, 2013 Permit status: Na | Permit id: Cbw211731 | |||||
SCORE 100 New fire alarm device for acquina at 53 state st tie into existing building fa system.; elevator lobby detectors for elevator recall functions are existing. Date: March 17, 2015 Contractor: John Mclaughlin Permit type: Bfd other | Permit status: Na | Permit id: Bfdf446671 | |||||
Install water main; 4 x 7 rdwy / (3); 5 x 5 sdwk; ; umbro; extension; no work 11/25-11/29 Date: September 23, 2015 Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-472762 | |||||
Excavation permit Date: September 23, 2015 Permit type: Capital improvement | Permit id: Exca-472762 | |||||
Extension; street paving only; m susi &; sons; 7pm-6am weekdays; 7am-7pm weekends Date: September 23, 2015 Permit type: Capital improvement | Permit status: Expired | Permit id: Exca-472762 | |||||
Excavation permit Date: September 23, 2015 Permit type: Capital improvement | Permit id: Exca-472762 | |||||
SCORE 100 53 state street lower level & first floor/citizens bank. Control wiring for hvac equipment 152392 Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv484159 | |||||
SCORE 100 53 state street - 10th & 11th floors - control wiring for new and existing hvac equipment Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv451408 | |||||
SCORE 88 13th floor 37 tel data cabling and devices Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv321917 | |||||
SCORE 100 53 state street - 37th floor. Control wiring for hvac equipment 151941 Permit type: Low voltage | Permit status: Expired | Current use: Comm | Permit id: Elv445384 | |||||
SCORE 100 Renovations to office space on the 17th floor to include new lighting millwork and flooring install for the new audio visual equipment install in the conference room. No fire alarm egress not affected 6 sprinkler relocates Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf127861 | |||||
SCORE 100 To install 1 water heater and 1 sink on the 4th floor @ 53 state st. Permit type: Plumbing | Current use: Comm | Permit id: Pl129574 | |||||
SCORE 100 53 state street 7th floor bcg. Control wiring for hvac equipment 15-2592 Permit type: Low voltage | Permit status: Open | Current use: Comm | Permit id: Elv507119 | |||||
SCORE 93 Sediment carbon water filtration system physical address is 53 state street Permit type: Plumbing | Current use: Comm | Permit id: Pl190588 | |||||
SCORE 93 Install sediment carbon water filtration system Permit type: Plumbing | Current use: Comm | Permit id: Pl147961 | |||||
SCORE 100 W-2 group reuse existing telephone and data wiring add in new where needed. Please call 781-255-7117 to coordinate all inspections. Permit type: Low voltage | Current use: Comm | Permit id: Elv133899 | |||||
SCORE 100 Renovations to office space on the 27th floor to include new lighting millwork and flooring install for the new audio visual equipment install in the conference room. No fire alarm egress not affected 6 sprinkler relocates. Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf127857 | |||||
SCORE 94 Installation of new lighting and power for renovation of conference rooms on 17 24 & 27th floors Permit type: Electrical | Current use: Comm | Permit id: E135068 | |||||
SCORE 100 Renovation of (5) conference rooms to include relocation of existing lighting installation of new lighting new power for a v equipment Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E218937 | |||||
SCORE 100 53 state street - hachette. Control wiring for hvac equipment 14-1261 Permit type: Low voltage | Current use: Comm | Permit id: Elv391581 | |||||
SCORE 100 53 state street - 13th floor renovation. Control wiring for hvac equipment 14-0986 Permit type: Low voltage | Current use: Comm | Permit id: Elv324388 | |||||
SCORE 89 Modifications of an existing office space. Work includes in the 4th floor ;office modifications mep upgrades and new finishes. Sprinkler Permit type: Fast track application | Current use: Mixed | Permit id: Alt125668 | |||||
SCORE 100 Demo and rehab of 1 2 of office space. Remove and relocate existing fixtures Permit type: Electrical | Permit status: Expired | Current use: Comm | Permit id: E128017 | |||||
SCORE 100 Renovations to office space on the 24th floor to include new lighting millwork and flooring install for the new audio visual equipment install in the conference room. No fire alarm egress not affected 6 sprinkler relocates. Permit type: Renovations -interior nsc | Permit status: Expired | Current use: Comm | Permit id: Sf127854 | |||||
SCORE 99 Installation of cabling and devices on the 12th floor for the dow jones tenant space improvements Permit type: Fire alarm | Current use: Comm | Permit id: Efa42819 | |||||
SCORE 100 Demo and rehab of 1 2 of office space Permit type: Fire alarm | Permit status: Expired | Current use: Comm | Permit id: Efa128023 | |||||
SCORE 95 Proposed work: altman vilandrie - 37th floor tenant renovation includes demolition drywall partition ceiling tiles flooring electrical hvac & finish work. Last action: ready to issue Date: April 21, 2009 Contractor: Structure Tone Inc Permit type: Fast track application | Current use: Comm | Permit id: Alt9460 | |||||
SCORE 100 Proposed work: altman vilandrie - 37th floor tenant renovation includes demolition drywall partition ceiling tiles flooring electrical hvac & finish work. Last action: ready to issue Date: April 21, 2009 Contractor: Francesca Dirico Permit type: Fast track application | Permit status: Expired | Current use: Comm | Permit id: Alt9460 |