Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
A/c system replacement only (no. Of tons____) Permit id: Mec2015-00413 | |||||
Force air furnace (btu____) Permit id: Mec2015-00418 | |||||
Gas appliance replacement Permit id: Mec2014-00248 | |||||
Replace gas furnace and a/c; tie into existing electric gas pipe and ductwork; 2 circuits; all work will be done as per code. Permit id: Com2010-21649 | |||||
Replacng 1 door as per code. Permit id: Com2006-38653 | |||||
A c system replacement only (no. Of tons____) Expiration date: September 27, 2016 | Permit id: Mec2015-00413 | |||||
Replace gas furnace and a c; tie into existing electric gas pipe and ductwork; 2 circuits; all work will be done as per code. Expiration date: March 28, 2011 | Permit id: Com2010-21649 |