Get several free quotes from best contractors in your area.
| Content | Date | Cost | Contractor Rank | Address | Contractor |
|---|---|---|---|---|---|
Electrical permit Permit status: Finaled | Completion date: May 27, 2005 | Current use: Single family dwelling | Permit id: 382855 | |||||
Anastasi residence pv system - ap #6845 6. 63 kw system, 26 modules, 60 w inverter, 35 amp breaker in 2 amp mcb panel. Permit type: Electrical permit | Permit status: Finaled | Completion date: September 4, 2014 | Current use: Single family dwelling | Permit id: 685400 | |||||
Building residential Permit status: Issued | Current use: Single family dwelling | Permit id: 345493 | |||||
Install (26) solar panels to roof of exisiting sfd Permit type: Building residential | Permit status: Stop work | Completion date: September 4, 2014 | Current use: Single family dwelling | Permit id: 684580 | |||||
Porch Permit type: Building residential | Permit status: Finaled | Completion date: July 27, 2004 | Current use: Single family dwelling | Permit id: 344835 | |||||
Revision to permit #345493(patio room) Permit type: Building residential | Permit status: Finaled | Completion date: May 27, 2005 | Current use: Single family dwelling | Permit id: 377718 | |||||
Anastasiresidence pv system - ap #6845 6. 63 kw system,26 modules, 60 w inverter, 35amp breaker in 2 amp mcb panel. Permit type: Electrical permit | Permit status: Finaled | Current use: Single family dwelling | Permit id: 685400 | |||||
Replacegas service in accordance with washington gas plan no. 631038. Work shall comply with montgomery county specifications for utility construction permit, the direction of the dps inspector and in accordance with the public right-of-way accessibility guidelines (prowag). A mill and overlay shall be required should the patch not meet the specifications as set forth by the current county specifications for utility construction permit and as directed by the dps row inspector. All lane closures/traffic controls shall comply with the mcdot approved traffic control plans, work zone temporary traffic control standards and directions of the dps row inspector. Permittee must check and coordinate with mcdot paving project schedule and have preconstruction meeting with dps row inspector prior to beginning of construction work. Permit type: Public right of way | Permit status: Issued | Current use: Public utility | Permit id: 350607 |